.

CMS Guidance

New CMS COVID-19 Blanket Waivers for Health Care Providers

April 2, 2020

by Ross C. D'Emanuele, Alissa Smith, Jamie McCarty, Randall Hanson, Laura B. Morgan, Charis Zimmick, and Carson Lamb

Download as a PDF

Share this page

On March 30, 2020, the Centers for Medicare & Medicaid Services (“CMS”) published a compilation of COVID-19 Emergency Declaration Blanket Waivers for Health Care Providers (each, a “Blanket Waiver”). Section 1135 of the Social Security Act gives CMS the authority to issue waivers that ease requirements for providers affected by an emergency if: (1) the President makes an emergency declaration under the Robert T. Stafford Disaster Relief and Emergency Assistance Act, 42 U.S.C. 5121-5207 (the “Stafford Act”); and (2) the Secretary of the Department of Health and Human Services declares a Public Health Emergency (“PHE”), both of which have now occurred in light of COVID-19. CMS is permitted to issue both blanket waivers and provider/supplier requested waivers on a case-by-case basis. Blanket waivers apply to all applicable providers and suppliers, while individual waivers apply only to the requesting provider or supplier. A provider or supplier need not request a provider/supplier-specific waiver of a requirement if CMS has issued a blanket waiver addressing the same requirement.

It is important to note that 1135 waivers apply solely to federal requirements and do not apply to state licensure or other requirements. Any applicable state requirements (e.g., licensure) must also be addressed with the relevant state agency.

Another important note of caution is that these 1135 waivers often include specific details and requirements. It is critical for health care providers to review the waivers carefully before taking action under them. To that end, providers should visit the CMS Coronavirus Waivers & Flexibilities website, here, to locate the specific guidance and requirements from CMS about the type of program waiver(s) being sought. CMS has provided numerous Frequently Asked Questions (“FAQ”) documents and provider-specific fact sheets that detail the details about and limits of the available waivers and flexibilities for each type of provider (hospital, skilled nursing facility, physicians, laboratories, home health providers, etc.). Additionally, this website contains links to all of the waivers provided in each state.

The following is a summary of the Blanket Waivers CMS has made available to providers and suppliers on March 30, 2020. These Blanket Waivers are retroactively effective back to March 1, 2020 and will continue through the end of the emergency declaration.

I. Hospital Waivers

The Blanket Waivers include significant regulatory relief for hospitals. The following is a summary of the hospital-specific Blanket Waivers, and here is a CMS Fact Sheet that was published for hospitals to further explain these specific Blanket Waivers:

a. Temporary Expansion Sites (a.k.a. Hospitals Without Walls)

Under this Blanket Waiver, hospitals are permitted to offer health care services in locations that are not currently part of the hospital. Previously, hospitals would have been required to meet Life Safety Code and other regulatory provisions and obtain approvals to provide services in a new location. This waiver will help hospitals set up temporary expansion sites to offer inpatient services (e.g., nursing, room and board) in locations such as shell space in a hospital, parking structures, dormitories and the like – as long as the hospital exercises control and oversees the services provided at the location, and as long as the location is approved by the state (to ensure safety and comfort for patients and staff).

CMS is also allowing currently enrolled ambulatory surgery centers (“ASCs”) to temporarily enroll as hospitals by calling the COVID-19 Provider Enrollment Hotline to complete and sign an attestation form in order to enroll and provide services during the PHE as a hospital. CMS also encourages other entities (e.g., freestanding emergency departments which are not currently allowed to enroll in Medicare) to call the COVID-19 Provider Enrollment Hotline to complete and sign an attestation form in order to enroll and provide services during the PHE. Further, CMS is allowing hospitals to change their provider-based locations to address patient needs, as well as allowing additional flexibilities related to inpatient services furnished under arrangements. Moreover, hospitals are permitted to screen patients at locations off of a provider’s campus, in order to avoid the spread of COVID-19. Further, for surge facilities in off campus departments, CMS is waiving the requirements to have policies and procedures for evaluating emergencies so these facilities do not need to focus time on drafting policies and procedures but rather can focus on patient care needs.

b. Relaxed Paperwork, Policies, Cost Reporting, Filing Deadlines and Enrollment Requirements

For hospitals that are impacted by a widespread outbreak of COVID-19, the timeframes for providing patients a copy of their medical records are waived, as are the requirements related to visitation and seclusion. Additionally, CMS is granting a 30-day post-discharge requirement to complete medical records, CMS is waiving medical records department staffing requirements, and also waiving specific requirements for the form and content of the medical record and the medical record completion requirements. Further, verbal orders can be authenticated more than 48 hours after the fact (although read-back verification is still required). CMS is also waiving requirements to provide information about advanced directives to patients.

Further, To ensure that hospitals and critical access hospitals focus on patient care and ensuring patients are discharged in an appropriate setting, as opposed to focusing on the paperwork and other regulatory obligations, CMS is waiving the detailed regulatory paperwork and other requirements related to discharge planning. For example, CMS recognizes that during the PHE, hospitals may not be able to use specific quality metrics and other data, or a comprehensive list of nursing homes in the area, to select a nursing home or home health agency. However, hospitals are still required to work with families to ensure that the discharge meets patients’ care needs.

Further, CMS is waiving the entire condition of participation related to utilization review plans and committees, nursing care plans, having available a current therapeutic diet manual, developing and implementing emergency preparedness policies and procedures and communication plans, as well as waiving the detailed provisions governing a hospital’s quality assessment and performance improvement program (although hospitals must still have such a program in place).

CMS has established a toll-free hotline for all providers as well as significant flexibilities in provider enrollment. See here for additional information from CMS on provider enrollment relief, as well as our previous blog post on this topic, available here.

Further, CMS is waiving the signature and proof of delivery requirements for Part B drugs and durable medical equipment (although the delivery and the fact that a signature could not be obtained due to COVID-19 should be documented in the record).

Additionally, CMS is delaying the cost-report filing deadlines until June and July, and CMS is extending the data submission deadlines for hospitals on the reporting of occupational mix of employees until August 3, 2020. Further, Medicare Administrative Contractors (“MACs”), Qualified Independent Contractors (“QICs”), and Independent Review Entities (“IREs”) are allowed to grant extensions to providers on appeals and are permitted to offer other flexibilities on filings and deadlines.

c. Critical Access Hospitals (“CAHs”) Without Walls

CAHs are now permitted to exceed their 25 bed limit and the 96 hour length of stay limit. CMS is also permitting CAHs to treat patients in urban areas (they typically must be located in a rural area) as needed in order to establish surge locations. Further, CMS is waiving the restrictions on CAHs’ ability to establish off campus provider based locations, and to establish the normally restricted co-location arrangements with other providers. CMS is waiving the minimum personnel qualification requirements at CAHs for clinical nurse specialists, nurse practitioners and physician assistants, and CMS is deferring to the state for the requirements of staff licensure, certification or registration, which will allow more flexibility to CAHs in states where federal requirements are more stringent.

d. Distinct Part Units

CMS is also now allowing hospitals to house acute care patients in excluded distinct part units (as long as the unit’s beds are appropriate for acute inpatients). Hospitals are permitted to bill for the care provided in the distinct part unit under the Inpatient Prospective Payment System. Providers should annotate in the medical record to explain that the care was provided in the distinct part unit due to capacity issues related to the PHE. Hospitals are also now permitted to provide care in acute care beds and units for patients who would normally be treated in distinct part psychiatric units or distinct part rehabilitation units, as long as the acute beds and units are appropriate for such patients. Hospitals should continue to bill under the Inpatient Psychiatric or Inpatient Rehabilitation Prospective Payment System for those patients, and annotate in the medical record to explain that the care was provided in the acute care unit due to capacity issues or other exigent circumstances related to the PHE.

e. Telemedicine

CMS is waiving telemedicine restrictions on hospitals and CAHs to make it easier for these providers to provide telemedicine for their patients through agreements with off-site hospitals, in order to improve access to specialty care.

f. Workforce

CMS is waiving the sterile compounding requirements to allow the re-use of face masks. CMS is also waiving the 2-year reappointment period for medical staff re-credentialing, the requirement that patients in a hospital be under the care of a physician (to allow other practitioners like physician assistants and APRNs to be used to the fullest extent possible), and CMS is waiving the requirement for CRNAs to work under the supervision of a physician. Further, CMS has stated that Hospitals do not have to designate in writing the personnel qualified to perform specific respiratory care procedures or the amount of supervision required for personnel to carry out those procedures.

II. Long-Term Care, Skilled Nursing Facilities, and Nursing Facility Waivers

The Blanket Waivers provide a number of flexibilities related to nursing services. See here for the CMS fact sheet published specifically for long term care facilities. CMS is waiving the 3-day prior hospitalization requirement for coverage of a skilled nursing facility (“SNF”) stay, waiving the timeframe requirements for certain data submission for SNFs and long-term care (“LTC”) facilities, and allowing nursing homes to suspend pre-admission screening and annual resident review assessments.
Certain physical environment requirements are now waived, allowing for expanded use of non-SNF buildings or non-resident rooms in a LTC facility for patients in certain emergency circumstances. To promote social distancing: requirements that residents participate in-person in resident groups are waived; requirements related to room-sharing and moving a resident’s room are waived for the purpose of grouping or separating residents with respiratory illness symptoms and/or residents with a confirmed COVID-19 diagnosis from residents without these symptoms or diagnosis; and physicians and non-physician practitioners may conduct visits through telehealth options when previously the visits were required to be in-person.

CMS is also partially waiving training and certification requirements required for nurse aids employed for longer than four months at a facility in order to assist with potential staffing shortages. CMS has waived certain resident transfer and discharge requirements in particular circumstances, though advance notification and receiving facility agreements are generally still required, and related care planning requirements are also waived in certain circumstances.

Additionally, CMS is delaying the cost-report filing deadlines until June and July, and CMS is extending the data submission deadlines for hospitals on the reporting of occupational mix of employees until August 3, 2020. Further, Medicare Administrative Contractors (“MACs”), Qualified Independent Contractors (“QICs”), and Independent Review Entities (“IREs”) are allowed to grant extensions to providers on appeals and are permitted to offer other flexibilities on filings and deadlines.

III. Home Health, Hospice, ESRD, and DMEPOS Waivers

CMS has provided FAQ documents on these waivers for home health, here; for hospice, here; for ESRD Facilities, here; and for DME Suppliers, here. Under the Blanket Waivers, CMS provided extensions for home health, hospice, and ESRD providers to complete certain assessment required for Medicare reimbursement. CMS also waived certain home health, hospice and ESRD in-person assessment, visit, and supervision requirements to reduce the need for ordinary course check-ins and to allow for greater use of telehealth. In addition, hospices are relieved of the requirement to provide non-core hospice services, such as physical therapy, occupational therapy, and speech-language pathology. In providing additional flexibility in timing and in-person visits, CMS’s goal is to support containment efforts for at-risk populations and to free up professional resources to focus on treatment of those infected with coronavirus and to focus on operations related to the pandemic.

In addition, CMS is waiving certain routine audits, maintenance, and certification requirements for ESRD Facilities and ESRD Facility staff. Again, CMS is attempting to free up resources and provide flexibility to support providers’ focus on pandemic-related efforts. CMS authorized the establishment of Special Purpose Renal Dialysis Facilities (“SPRDF”) to mitigate transmission among the at-risk population. Such facilities do not require a federal survey to be completed before providing services. CMS is allowing physicians that are appropriately credentialed at a certified dialysis facility to provide care at a “designated isolation location” such as a SPRDF without separate credentialing. Dialysis services may now also be provided in nursing homes and SNFs, so long as the services and necessary equipment and supplies are provided by personnel of the resident’s usual Medicare-certified dialysis facility.

In an effort to expedite supply of and reimbursement for DMEPOS, CMS is waiving the replacement requirements (such as the face-to-face requirement, a new physician’s order, and new medical necessity documentation) for DMEPOS that are lost, destroyed, irreparably damaged, or otherwise rendered unusable. DMEPOS suppliers must still provide a narrative description about why the equipment must be replaced.

IV. Practitioner Licensure, Provider Enrollment, Appeals, and Medicaid/CHIP Waivers

CMS has provided a specific fact sheet describing the waivers and flexibilities available for physicians and other clinicians, available here. The Blanket Waivers are intended to ease the burden on the health system in order to allow providers to focus on patient care. To that end, CMS is temporarily waiving the Medicare reimbursement requirements that out-of-state practitioners be licensed in the state in which they are providing services when they are licensed in another state when the following four conditions are met:

  1. The practitioner must be enrolled in Medicare;
  2. The practitioner must have a valid license to practice in the state which relates to his or her Medicare enrollment;
  3. The services must be furnished, whether in-person or remote via telehealth, in a state in which the emergency is occurring in order to contribute to relief efforts in his or her professional capacity; and
  4. The practitioner must not be excluded in any state that is part of the PHE.

Please note that the foregoing Medicare reimbursement waiver for licensure does not waive state or local licensure requirements. As a result, providers must review the state licensure requirements in each jurisdiction prior to delivering telehealth to patients in that location. Please see the blog post we published on this topic of telehealth opportunities here.

Additionally, CMS has taken a number of steps to ease the provider enrollment requirements. See here for additional information from CMS on provider enrollment relief, as well as our previous blog post on this topic, available here. CMS has set up a hotline for physicians and non-physician practitioners to enroll and receive temporary Medicare billing privileges. Additionally, CMS has taken the following steps to facilitate the enrollment of providers in the wake of the COVID-19 outbreak, including:

  • Waiver of certain screening requirements, including application fees, background checks, and site visits;
  • Postponement of revalidation actions;
  • Allowing licensed providers to render services outside their state of enrollment;
  •  Expediting pending or new applications;
  •  Easing telehealth restrictions; and
  • Allowing physicians and non-physician practitioners to terminate opt-out status early and enroll in Medicare.

Regarding appeals, the new waivers grant broad powers to MACs, QICs, and IREs to relax the requirements of federal regulations regarding the appeals process in FFS, and Parts C and D. MACs, QIEs, and IREs are instructed to allow extensions to file an appeal and to permit the waiver of requests for timeliness requirements for additional information to adjudicate appeals. MACs, QICs, and IREs are now allowed to process an appeal even with incomplete Appointment of Representation forms as outlined in federal regulations. Additionally, MACs, QICs, and IREs can now process appeals that do not meet the required elements of those same federal regulations. MACs, QICs, and IREs are given broad flexibility with respect to other parts of the appeals process so long as good cause requirements are satisfied.

Finally, regarding Medicaid and CHIP, the new waivers permit states to request approval that certain statutes and implementing regulations be waived under section 1135. To request such an approval, states may submit an 1135 waiver request directly to their Center for Medicaid and CHIP Services (CMCS) state lead or Jackie Glaze, Acting Director, Medicaid and CHIP Operations Group, Center for Medicaid and CHIP Services at CMS by e-mail (Jackie.Glaze@cms.hhs.gov) or by letter. CMS sets forth a number of examples of the kinds of requests that states can make under this waiver, including:

  • Waiver of prior authorization requirements for FFS programs;
  • Waiver of out-of-state requirements for providers to provide care to another state’s Medicaid enrollees impacted by COVID-19;
  • Temporary suspension of provider enrollment and revalidation requirements to increase access to care;
  • Temporary waiver of state licensure requirements;
  • Temporary suspension of requirements for pre-admission and annual screening requirements for nursing home residents.

CMS encourages states to assess their needs and take advantage of these waivers. To assist states with the waiver request process and provide additional guidance, CMS released the Medicaid and CHIP Disaster Response Toolkit, which can be found here. Further, the CMS Coronavirus Waivers & Flexibilities website, here, contains a link to each state’s request for waivers and the responses from CMS.

V. Stark Waivers

On the same date, CMS also issued much-anticipated Blanket Waivers of sanctions under the federal physician self-referral law, or “Stark Law,” for “COVID-19 Purposes.” These Blanket Waivers are set forth here. Please see our separate post, available here, with detailed information about these Stark Law Blanket Waivers.

* * *

If you have questions about the new CMS waivers, please contact the authors or your regular Dorsey & Whitney LLP attorney. Dorsey is closely monitoring the rapidly evolving legal landscape related to the COVID-19 pandemic. You can access Dorsey’s health law blog related to health law updates, available here. You can also access Dorsey’s coronavirus resource center, which contains a wide variety of legal resources related to the coronavirus outbreak, available here.

Firm Highlights

Insights

The Supreme Court Update - October 8, 2026

On September 29, 2026, the Supreme Court granted certiorari in one case: Department of Homeland Security v. D.V.D., No. 26-426: This case concerns the Trump Administration’s “third-country removal” procedures, where immigrants are deported to countries not listed in the removal orders. In granting certiorari, the Court granted the Government’s application to stay a lower court decision halting the practice, which will allow third-country removals to continue pending resolution of the case. The issues presented are: (1) Whether the district court had jurisdiction over respondents’ claims; (2) whether the district court had authority to enter class-wide declaratory relief and APA vacatur under 8 U.S.C. § 1252(f)(1); (3) whether the Government’s guidance on third-country removals is unlawful under 8 U.S.C. § 1231(b), the due process clause, or FARRA/CAT and its implementing regulations; and (4) such other questions that the Government determines are appropriate for the proper disposition of the case. On October 1, 2026, the Court granted certiorari in three additional cases: Rhoney v. Barbosa da Cunha, No. 26-104: Immigration officials detained Ricardo Aparecido Barbosa da Cunha—a Brazilian citizen who had lived in the United States for approximately twenty years after entering without inspection—and denied him a bond hearing under 8 U.S.C. § 1225(b)(2)(A). The Second Circuit held that his detention was instead governed by § 1226(a), which permits release on bond, because § 1225(b)(2)(A)’s mandatory-detention requirement applies only to noncitizens apprehended while entering the country or shortly thereafter. The question presented is: Whether 8 U.S.C. § 1225(b)(2)(A) mandates the detention pending removal proceedings of aliens who, like Barbosa da Cunha, are present in the United States without having been admitted. Missionaries of St. John the Baptist, Inc. v. Frederic, No. 25-113: A Catholic religious organization sought to build a shrine to the Virgin Mary on land the organization owned adjacent to its church in Park Hills, Kentucky. Local zoning restrictions prohibited the proposed construction. The question presented is: Whether a land-use regulation that prohibits a religious institution from building a religious structure on its own property constitutes a “substantial burden” on religious exercise under the Substantial Burden Provision of the Religious Land Use and Institutionalized Persons Act, 42 U.S.C. § 2000cc(a). Marschner v. Marschner, No. 25-1349: Under the Uniformed Services Former Spouses’ Protection Act (“USFSPA”), a veteran’s longevity-based retirement pay can be divided in a divorce, but retirement pay based on disability and retirement pay that was waived to receive disability pay are indivisible. The question presented is: Does the USFSPA require state courts to refuse enforcement of indemnification provisions in a divorce settlement agreement?

Insights

SEC Proposes Expansion of Investment Adviser Performance-Based Compensation Rule

On September 30, 2026, the Securities and Exchange Commission (the “SEC”) proposed amendments to Rule 205-3 under the Investment Advisers Act of 1940, as amended (the “Advisers Act”), which provides an exemption from the general prohibition under Section 205(a)(1) of the Advisers Act on registered investment advisers receiving performance-based compensation (the “Proposal”) so long as performance-based compensation is limited to “qualified clients”.1 Most notably for private fund sponsors, the Proposal would expand the definition of “qualified client” to include any investors that satisfy the “accredited investor” definition under Regulation D. The Proposal may also have implications for private fund managers that rely on exemptions from investment adviser registration under state law because certain state-level investment adviser registration exemptions incorporate or otherwise reference the federal qualified client definition. Expansion of the Qualified Client Definition Under the current Rule 205-3, an investor generally may qualify as a qualified client if, among other alternatives, the investor has at least $1.4 million under management with the adviser or has a net worth exceeding $2.7 million. These thresholds are higher than the financial thresholds applicable to many accredited investors under Regulation D. As a result, an investor may currently qualify as an accredited investor for purposes of investing in a private offering without qualifying as a qualified client for purposes of paying performance-based compensation. The Proposal would expand the qualified client definition to include any natural person or legal entity investor that satisfies the accredited investor definition under Regulation D. The Proposal would also remove the assets under management and net worth thresholds under the current Rule 205-3 qualified client test. For private funds relying on Section 3(c)(1) of the Investment Company Act of 1940, this change could reduce the need to apply a separate qualified client standard to investors that already qualify as accredited investors. Dorsey Observations and Next Steps If adopted as proposed, the expanded qualified client definition could be particularly significant for private fund managers. Most private fund offerings are already limited to accredited investors under Regulation D. However, the Proposal could expand the pool of prospective investors available to emerging private fund managers while reducing the regulatory burden associated with complying with Rule 205-3. The Proposal could also benefit advisers operating below the SEC registration threshold that rely on a state private fund adviser exemption. A number of states have adopted exemptions modeled on the North American Securities Administrators Association (“NASAA”) private fund adviser exemption, which may condition relief for advisers to certain funds relying on Section 3(c)(1) on each beneficial owner satisfying the federal qualified client definition. However, state requirements vary, and any effect of the Proposal would depend on the text of the applicable state exemption and how it incorporates Rule 205-3. Many emerging private fund managers may have a larger network of accredited investor relationships than qualified client relationships during the early stages of their investment advisory business. Currently, under Rule 205-3, private fund managers may receive performance-based compensation from investors who do not satisfy the qualified client definition if those investors were admitted to their private funds prior to registration with the SEC. Following registration with the SEC, however, managers may continue to permit investors that are not qualified clients to invest in future private funds but may not receive performance-based compensation from those investors with respect to such investments. In addition, because the net worth and assets under management thresholds for qualified client status are adjusted for inflation every five years, the pool of qualified client investors may diminish over time as previously eligible investors no longer satisfy the applicable thresholds. The Proposal could provide the dual benefit of greater flexibility for private fund managers to establish and maintain relationships with accredited investors as their businesses scale and they become registered with the SEC, and greater flexibility for certain accredited investors to participate in investment strategies that historically have been restricted to much larger institutional investors. Unless and until the Proposal is adopted, investment advisers should continue to comply with the existing qualified client requirements. If the Proposal is adopted, private fund sponsors should consider whether corresponding changes are appropriate for their subscription documents, investor questionnaires, and other offering materials. Advisers that are state-registered or rely on a state-level exemption should also consult the laws and regulations of each relevant jurisdiction before changing investor eligibility standards or performance-based compensation practices, because adoption of the federal amendments may not automatically modify state requirements. Comments on the Proposal will be due 60 days after publication in the Federal Register. 1 Investment Adviser Performance-Based Compensation Modernization, Investment Advisers Act Release No. IA-7022 (Sept. 30, 2026), available at https://www.sec.gov/rules-regulations/2026/09/s7-2026-28#33-11443proposed.

Insights

EPA Limits Title V Re-Litigation of NSR Permits

Overview On September 25, 2026, the U.S. Environmental Protection Agency (“EPA”) published a final rule that significantly limits the ability of third parties to use the Clean Air Act (“CAA”) Title V permitting process to revisit New Source Review (“NSR”) permitting decisions years after those decisions were made. The rule establishes that NSR permitting determinations generally must be challenged during the original permitting proceeding, thereby providing regulated sources with greater permitting certainty and finality for major capital projects. Published in the Federal Register titled Clarifying the Scope of “Applicable Requirements” Under State Operating Permit Programs and the Federal Operating Permit Program (Docket ID No. EPA-HQ-OAR-2023-0401), the rule amends 40 C.F.R. Parts 70 and 71 to codify EPA’s interpretation regarding when requirements established under other CAA programs may be reviewed, modified, or implemented through the Title V operating permit program. The rule becomes effective 30 days after publication. The rule addresses two principal issues: (1) the relationship between NSR preconstruction permitting and Title V operating permits, and (2) the treatment of the General Duty Clause under CAA section 112(r)(1). Most significantly, the rule provides greater certainty for sources navigating the NSR permitting process. EPA’s amendments are intended to ensure that NSR permitting decisions made through an approved public process are generally not revisited later through Title V permit proceedings. The rule responds to a circuit split between the U.S. Courts of Appeals for the Fifth and Tenth Circuits. In Environmental Integrity Project v. EPA, 969 F.3d 529 (5th Cir. 2020), the Fifth Circuit upheld EPA’s interpretation, concluding that it was consistent with the text, structure, and purpose of Title V. In contrast, the Tenth Circuit reached the opposite conclusion in Sierra Club v. EPA, 964 F.3d 882 (10th Cir. 2020), finding that the then-existing regulatory definition of “applicable requirement” did not support EPA’s position. By amending the regulatory language on which the Tenth Circuit relied and codifying the interpretation approved by the Fifth Circuit, EPA has established a nationwide framework governing the interaction between NSR and Title V. NSR and Title V: EPA Establishes a Uniform Nationwide Framework At the core of the rule is EPA’s effort to define the respective roles of NSR and Title V. The rule codifies the approach EPA has applied since 2017: once a source obtains an NSR permit under an EPA-approved permitting program, and that permit was issued following public notice with an opportunity for comment and judicial review, the permit establishes the NSR-related “applicable requirements” of the State Implementation Plan (“SIP”) or Federal Implementation Plan (“FIP”) for Title V purposes. Under this framework, Title V is not a vehicle for re-examining underlying NSR permitting decisions. EPA does not intend to use the Title V process to revisit applicability determinations, emissions calculations, control technology determinations, permit conditions, or other issues resolved through the NSR permitting process. This principle applies regardless of the stage of the Title V proceeding; whether the NSR permit was issued pursuant to a SIP or FIP; the type of NSR issue involved; or whether the NSR permit is incorporated into Title V sequentially or concurrently. Limited Exceptions EPA recognizes several circumstances in which NSR issues may still be reviewed through the Title V program: No NSR permit was issued at all; The permit was issued without public notice and an opportunity for comment and judicial review; or The issue involves substantive overlap between Title V and NSR requirements, such as the adequacy of monitoring provisions. As a result, the rule does not insulate unpermitted projects or foreclose review of matters that independently arise under Title V. Key Regulatory Amendments The rule revises the definition of “applicable requirement” in 40 C.F.R. §§ 70.2 and 71.2. Paragraph (1): Where an NSR permit is issued with public notice and an opportunity for comment and judicial review, the permit establishes and defines the applicable SIP or FIP requirements for Title V purposes. Paragraph (2): All NSR permit terms, including terms contained in minor NSR permits, constitute applicable requirements that must be incorporated into Title V permits. Paragraph (4): CAA section 112(r)(1) (the General Duty Clause) is expressly excluded from the definition of “applicable requirement,” while section 112(r)(7) Risk Management Program requirements remain included. EPA also amended 40 C.F.R. §§ 70.8 and 70.12 to clarify that alleged defects in requirements established outside the Title V process generally do not provide a basis for EPA objection to a Title V permit or for a Title V citizen petition. General Duty Clause Exclusion The rule also codifies EPA’s longstanding position that the General Duty Clause in CAA section 112(r)(1) is not an “applicable requirement” for Title V purposes. EPA points to several considerations supporting that conclusion, including the distinction between the General Duty Clause and Title V permit terms, the provision’s origins in the Occupational Safety and Health Act’s general duty clause, and the different enforcement structures applicable to the General Duty Clause and Title V permit requirements. Importantly, excluding section 112(r)(1) from the definition of “applicable requirement” does not eliminate EPA’s authority to enforce the General Duty Clause independently of the Title V program. The final rule instead clarifies that the General Duty Clause need not—and should not—be incorporated into Title V permits as an applicable requirement. Practical Implications for Regulated Sources Greater Finality for NSR Permits  For projects requiring PSD, nonattainment NSR, or minor NSR permits, the permitting process becomes the primary forum for resolving disputes regarding applicability determinations, emissions calculations, control technology requirements, offsets, and permit conditions. Once an NSR permit is issued through a qualifying public process, regulated sources should face substantially reduced risk that those same issues will be challenged years later through Title V permit proceedings. Reduced Risk of Collateral Permit Challenges Stakeholders have sometimes sought to use Title V permit issuance, renewal, revision, or citizen-petition proceedings to challenge underlying NSR determinations. The final rule makes clear that Title V is not the appropriate vehicle for challenging whether an applicable requirement was correctly established in the first instance. This should reduce the risk of permit delays and uncertainty associated with collateral challenges to previously issued NSR permits. The rule does not, however, eliminate all Title V challenges relating to an NSR permit. Challenges concerning the Title V permit itself—including whether it appropriately incorporates applicable requirements or contains adequate compliance provisions—remain possible. Increased Importance of the Initial NSR Proceeding Because Title V generally will not provide a second opportunity to challenge the substantive validity of an NSR determination, the administrative record developed during the NSR process becomes increasingly important. Permit applicants should ensure that applicability analyses, emissions calculations, control technology evaluations, modeling demonstrations, and supporting technical documentation are thoroughly developed during the original permitting proceeding. For significant projects, applicants may therefore have an additional incentive to identify and resolve potential permitting issues before the NSR permit is issued rather than assuming that unresolved issues can be addressed during a subsequent Title V proceeding. Potential Incentive for Broader Public Participation EPA also notes that permitting authorities may choose to provide public notice and an opportunity for comment for a broader range of NSR permits because permits issued through a qualifying public process receive the benefit of the finality framework established by the rule. Some permitting authorities may conclude that greater public participation at the NSR stage is preferable to uncertainty during subsequent Title V proceedings. Conclusion The final rule is principally a permitting-certainty measure. For sources that obtain NSR permits through a public process, EPA has substantially limited the ability of third parties to revisit underlying NSR determinations through the Title V program. As a result, regulated entities should benefit from greater finality regarding key permitting decisions, reduced risk of collateral permit challenges, and increased certainty when planning and implementing capital projects.

Insights

Energy Law: Month in Review - September 2026

Welcome to Dorsey’s Energy Law: Month in Review. We provide this update to our clients to identify significant developments in the previous month. Please reach out to any of the authors, listed above, to discuss these issues. Regulatory Developments Massachusetts Ratchets Up State and Local Regulation of AI Data Centers In early September, Governor Maura Healey of Massachusetts signed an executive order requiring that artificial intelligence data centers secure the approval of local communities as a precondition to proceeding with a given project. According to the terms of the order, data center developers will need to secure a “community benefits agreement” as a precondition to receiving permits from numerous state agencies, including the Department of Environmental Protection, the Energy Facilities Siting Board, and the Massachusetts Environmental Policy Act Office. Beyond requiring community benefits agreements, the order also mandates that developers mitigate utility costs to consumers, prohibits the use of nondisclosure agreements, and requires various state agencies to develop measures to limit data center impacts on the environment. North Carolina Regulators Decline Approval of Duke Energy Gas Turbine On September 18, 2026, North Carolina Utilities Commission (NCUC) denied Duke Energy’s application for a certificate of public convenience and necessity required to construct a gas-fueled combustion turbine at its Smith Energy Complex in North Carolina. The NCUC objected strongly to the $584 million price tag and noted that Duke appeared to be constructing the facility “based on anticipated data center customer additions.” The NCUC rejected that anticipated growth as “insufficiently reliable for the Commission to act at this point.” In rejecting Duke’s application, the NCUC also noted that Duke had signed the White House Ratepayer Protection Pledge, in which it represented that it would not shift data center costs to consumers. The NCUC observed that the record did not demonstrate how Duke “intends to adhere to its commitments under the Ratepayer Protection Pledge with regard to the Proposed Facility.” Notably, commission staff had actually supported the construction of the turbine, citing concerns about Duke’s reserve margins. The NCUC noted that it “understands the Public Staff’s expressed concerns,” but those concerns were outweighed by the NCUC’s reservations, including questions of demand. Department of Energy Approves Funds for Grid Improvement The U.S. Department of Energy (DOE) recently announced that it would fund 31 grid-improvement projects in 26 states. The funding initiative is part of the DOE’s “SPARK” initiative. The funding will include $1.9 billion in federal funding from DOE and $3.35 billion in recipient cost-sharing funding. The funds will go to projects designed to improve grid reliability and lower electricity costs. Recipients plan to reconductor over 1,500 miles of transmission lines and will deploy grid-enhancing technologies across approximately 21,000 miles. DOE stated that this initiative will make available over 23 additional gigawatts of electricity. Texas Moderates Rules Governing Data Center Interconnection The Texas Public Utility Commission adopted new regulations governing large-load interconnections. The rules impose a flat study fee of $100,000 for all proposed interconnections, which departs from the initial proposal to impose study fees using a tiered system based on project size. Additionally, the final rule eliminates the PUC’s previous proposal to impose a non-refundable interconnection fee of $50,000 per MW of contracted peak demand. The final rule also moderates the initially proposed regulations governing Electric Reliability Council of Texas (ERCOT) notifications for large-load customers’ non-utilized capacity. The proposed rules would have required notifying ERCOT within 30 days of missing a scheduled energization milestone by six months. The final rules, however, do not require informing ERCOT unless a scheduled energization milestone is missed by 24 months. FERC Denies TransAlta 202(c) Cost-Recovery Plan The Federal Energy Regulatory Commission (FERC) recently rejected TransAlta’s plan to recover $19.9 million in expenses stemming from a DOE order in which DOE prohibited TransAlta from retiring its coal-powered Centralia power plant. TransAlta had previously intended to retire the facility at the end of 2025. TransAlta’s cost recovery plan proposed spending an additional $23 million on repairs to continue operating the unit. FERC’s main objection had to do with geographic scope. TransAlta’s recovery plan called for recovering costs from California Independent System Operator (CAISO) and the Southwest Power Pool (SPP), but the DOE’s order requiring operation of the plant was designed to ensure reliability in the Northwest assessment area (Montana, Oregon, Washington, and parts of northern California and northern Idaho). Accordingly, FERC was unwilling to allow cost recovery from CAISO and SPP when the order that precipitated the additional costs only related to the Northwest assessment area. FERC informed TransAlta that it would only approve cost recovery from load-serving entities in the Northwest assessment area. FERC’s decision comes amid a rush of DOE emergency orders requiring the continued operation of coal-fired generating units. Litigation Appeals Court Upholds Washington Hydropower Plant With Caveats In a September 21, 2026, opinion, the Washington Court of Appeals largely upheld a Clean Water Act water quality certification by the Washington Department of Ecology for the Goldendale Energy Storage Project, a proposed pumped-water storage hydropower system adjacent to, but off-stream from, the Columbia River. A nonprofit (Columbia Riverkeeper) and the Confederated Tribes and Bands of the Yakama Nation appealed the certification, contending that it failed to impose necessary conditions and monitoring requirements to protect the water quality of the Columbia River. Most saliently, the plaintiffs argued that the project had the potential to leak 100 acre-feet of water per year into tributaries of the Columbia River. The Court of Appeals broadly rejected plaintiffs’ challenge to the state’s conclusion that “the project was designed not to leak.” That said, the Court of Appeals did reverse on one narrow issue. Specifically, the court determined that the state’s conclusion that “leakage from the project’s tunnels would be monitored and reported” was not supported by the evidence because the certification “does not explicitly require monitoring and reporting to determine whether there is any leakage.” Accordingly, the court remanded the matter to the state to impose monitoring and reporting requirements but otherwise affirmed the certification. Legislative Developments California Legislates Restrictions on Data Center Energy Use and Grid Costs On September 21, 2026, California Governor Gavin Newsom signed seven bills broadly regulating data centers in the state. SB 1168 directed the California Public Utilities Commission to assess the energy used by data centers. It also requires the PUC to pass costs of transmission and distribution upgrades and load increases on to data centers, rather than customers. SB 886 and SB 887 compel data centers to pay for infrastructure upgrade and generation costs, and wildfire mitigation costs, in addition to imposing environmental review. The statutes additionally increase local oversight of data centers. AB 1577 imposes a monthly reporting requirement that requires data centers to supply energy consumption and efficiency data to the California Energy Commission. AB 2383 contains incentives for data centers to use onsite clean energy generation. Finally, AB 2469 and AB 2619 require data center developments to assess water supply and develop a water scarcity plan. The statutes also mandate statewide water reporting as a precondition to obtaining and renewing business licenses.