Articles

Examining the Uniform Commercial Real Estate Receivership Act in Shaping Arizona’s Real Estate Receiverships

December 15, 2023

by W. Scott Jenkins Jr.

Download as a PDF

Share this page

This article is authored by Peter S. Davis, Andrew H. Short, Sara Beretta & William Johnston (J.S. Held), and W. Scott Jenkins, Jr., Esq. & Hannah-Kaye Fleming, Esq. (Dorsey & Whitney, LLP).

Introduction: History of Real Estate Receivership Authority in Arizona

Historically, Arizona courts have granted receivers certain powers and duties related to commercial real estate and certain residential property in accordance with A.R.S. § 12-1241, [1] and A.R.S. § 12-1242. [2] For example, receivers are appointed where real property is being subjected to or is in danger of:

  • waste, loss, transfer, dissipation, or impairment;
  • has been or is about to be the subject of a voidable transaction; or
  • the property or rights of the parties must be preserved and protected.

However, prior to the adoption of the Uniform Commercial Real Estate Receivership Act (“UCRERA”), there was no standard or uniform set of receivership rules, and courts applied widely varying standards with respect to receiverships.

This article examines the impact of UCRERA in Arizona and analyzes the important differences between UCRERA and Arizona's pre-UCRERA receivership process, as well as the potential legal issues and / or pitfalls that may arise. The insights on UCRERA provided by this article will prove helpful to lenders, lawyers, title insurance companies, receivers, secured creditors and other firms or professionals operating in the receivership space in Arizona.

In 2015, the Uniform Law Commission (ULC) finalized a model Uniform Commercial Real Estate Receivership Act with hopes that it would be adopted across the United States. UCRERA is intended to provide a standard set of rules for courts to apply in receiverships involving commercial real estate with the goal of resulting in greater predictability for litigants, lenders, and other parties doing business with a company subject to receivership. [3] In 2019, Arizona adopted UCRERA at A.R.S. § 33-2601 et seq. Since the ULC passed UCRERA (the “Act"”), 12 states, including Arizona, have adopted versions of the Act. [4]

Benefits of UCRERA in Receiverships

The circumstances under which an Arizona court may appoint a receiver under UCRERA are enumerated in A.R.S. § 33-2605. These include situations such as:

  • prior to judgment to protect a party that demonstrates an apparent right, title or interest in the real property that is the subject of the action,
  • after judgment to carry out the effect of the judgment or to preserve real property pending appeal,
  • in actions where a receiver may be appointed on equitable grounds, and
  • to preserve real property sold in an execution or foreclosure sale and to secure rents to the person entitled to the rents.

Moreover, under A.R.S. § 33-2605(B.3), lenders can include language in the deed of trust or mortgage that requires the borrower to agree to the appointment of a receiver in the event of a default.

As adopted in Arizona, UCRERA creates a standardized and more efficient method for conducting receiverships. UCRERA includes many of the powers historically given to receivers by the courts in receivership orders. The Act also grants receivers additional powers and protections typically granted to bankruptcy trustees. This hybrid approach allows for many of the benefits and protections granted in bankruptcy court at a lower cost while maintaining many of the elements of a traditional receivership.

UCRERA grants greater flexibility to senior lenders who seek to appoint a receiver over their collateral. In Arizona, one of UCRERA’s most significant powers is codified in A.R.S. § 33-2613, which states that (with certain exceptions) an order appointing a receiver operates as an automatic stay against collection and lien enforcement actions against the receivership property, and the court may enjoin any act, action or proceeding against or relating to the receivership property if the injunction is necessary to protect the property or facilitate the administration of the receivership. Other significant powers vested in the receiver under UCRERA in Arizona include:

  • Granting the receiver the status of a lien creditor (A.R.S. § 33-2608);
  • Authority to engage professionals to assist the receiver in performing duties or exercising powers (A.R.S. § 33-2614);
  • Operate a business constituting receivership property; incur unsecured debt and pay expenses incidental to the receiver’s preservation, collection, or disposition of receivership property; assert a right, claim, cause of action or defense of the owner that relates to the receivership property (A.R.S. § 33-2611);
  • With court approval, incur debt for the use or benefit of the receivership property other than in the ordinary course of business and make improvements to the receivership property (A.R.S. § 33-2611);
  • Use or transfer receivership property other than in the ordinary course of business (A.R.S. § 33-2615);
  • Adopt or reject executory contracts of the owner (A.R.S. § 33-2616); and
  • Pay compensation to the receiver (A.R.S. § 33-2619) and professionals engaged by the receiver.

Receivers are also allowed to sell property free and clear of liens under A.R.S. § 33-2615, including liens of junior lenders and judgment creditors. In addition, the senior lender can use a receivership to strip away junior liens from the property to allow the sale of collateral to occur. Prior to the adoption of UCRERA, a free and clear sale of collateral that was subject to multiple liens was not possible without the consent of all the lienholders. Under UCRERA, a receiver can sell collateral free and clear of junior liens with court approval. Any junior liens will attach to the proceeds of the sale.

Interpreting UCRERA: Important Provisions and Pitfalls

There has been little — if any — interpretative guidance from state legislatures or courts since Arizona’s Act went into effect in 2019, leaving practitioners, receivers, and other stakeholders wondering how the statute will be applied and whether pre-UCRERA receivership flexibility still exists. [5]

Courts and the ULC rely on the Bankruptcy Code for guidance in interpreting certain provisions of UCRERA given the many similarities between the two. [6] The ULC’s comments on UCRERA suggest that while the Act provides more predictability to the receivership process, courts still retain discretion via their equitable powers to fashion relief. [7] According to the ULC’s comments, a party requesting the appointment of receiver may seek court approval to clarify, supplement, or condition a receiver’s powers under the Act through a well-crafted receivership order. [8] Accordingly, the importance of a robust receivership order to clarify any ambiguities under the Act cannot be overstated.

The ULC’s comments on UCRERA shed light on how the major provisions of Arizona’s UCRERA will work in practice, the risks to avoid, and why proceeding under UCRERA may be a favorable option for a lender seeking to protect its real estate collateral and maximize value.

Retention of Professionals and Compensation

Prior to UCRERA, there was no statutory scheme in Arizona regarding the hiring and / or compensation of a receiver or their professionals. Receivers routinely paid themselves and their professionals without court oversight. [9] Under Arizona's UCRERA, the court is more involved in the process of hiring and compensating the receiver and his or her professionals, providing a new level of transparency to the receivership process. [10[

A.R.S. § 33-2614(A) provides that a receiver may engage professionals only with court approval after disclosing (1) the identity and qualifications of the professional, (2) any potential conflict of interest, (3) the scope and nature of the proposed engagement, and (4) the proposed compensation. [11]

The ULC's comments make clear that while a court has discretion to approve “de minimis conflicts of interest,” a court should not approve the engagement of a professional where “serious or substantial conflicts of interest exist.” [12] A.R.S. § 33-2614(B) expressly allows a receiver to serve two roles during the receivership by providing other professional services. For example, a receiver’s firm may also serve as the broker of the receivership property. Allowing a receiver to serve two roles during the receivership process may allow for certain efficiencies and costs savings but raises the question of when a conflict or the appearance of a conflict rises to an inappropriate level under A.R.S. § 33-2614(A). UCRERA leaves this question up to the courts based on the particular facts of the case. However, the ULC’s comments on UCRERA make clear that an “inappropriate conflict” would exist where a receiver also serves as the appraiser of receivership property. [13] A receiver should think through potential conflicts that could arise before his or her firm agrees to provide professional services outside of their role as a receiver. [14]

Moreover, the receiver and their professionals must adequately document the work they perform. [15] Under UCRERA, a receiver and his or her professionals must provide the court with an “itemized statement” documenting their time, the work performed, and the expenses incurred so that the court may assess the reasonableness of the professionals’ fees. [16] The increased oversight over a receiver and their professionals’ compensation, while providing greater transparency, also provides an avenue for interested parties to challenge the “reasonableness” of the professionals’ fees. For example, receivers and their advisors should break up tasks, identify time spent, provide sufficiently detailed descriptions for each individual task performed and avoid “block billing” that combines several tasks into one time entry. Receivers may competitively bid out and negotiate pricing for vendors to secure appropriate pricing.

Finally, A.R.S. § 32-2619(B) provides that the person who requested the receiver’s appointment or the party whose actions necessitated the receivership may be held liable for the receiver’s fees and those of his or her professionals if the receivership does not produce sufficient funds. [17] Accordingly, before seeking appointment of a receiver, a lender should assess the value of the receivership property, determine the amount of all liens and encumbrances, and have a detailed conversation with the potential receiver regarding fees and costs.

Sale Free and Clear

A.R.S. § 33-2615 expressly provides that the receiver may sell receivership property “free and clear” of all liens, including “the lien of the person that obtained appointment of the receiver, any subordinate lien and any right of redemption…” [18] Any lien on the property attaches to the sale proceeds with the same validity and priority it had on the transferred assets. [19] However, a receiver may not sell property free and clear of a senior lien unless the senior lien is extinguished by the transfer. [20]

By statutorily granting courts power to approve a sale, A.R.S. § 33-2615 provides more confidence in the receivership sale process than existed pre-UCRERA. Moreover, the sale process under UCRERA may increase buyer interest given the good faith protections provided by A.R.S. § 33-2615(E). The biggest advantage afforded lenders under A.R.S. § 33-2615 is the ability to sell and market the property via private channels, which are more orderly and often produce prices closer to market value than distressed sales.

However, a title company may be reticent to issue a title insurance policy for a property sold through a receivership due to concerns regarding the validity of the sale and the court’s ability to conduct a sale free and clear of junior encumbrances. This reticence may present hurdles during the sale process. The receiver and the lender who sought the appointment of the receiver should think proactively about title issues. Additionally, the sale order issued by the court should include language that provides the title company assurances, including A.R.S. § 33-2615(E)’s good faith purchaser language and free and clear language, similar to a bankruptcy court’s sale order. The receivership order itself should also clearly state that the receiver has the power to sell or convey the property. Finally, lenders should include the right to sell the property through a receivership as a post-default remedy in their loan documents.

Automatic Stay

Before UCRERA, a receiver had to seek an injunction from the receivership court to stay an action against receivership property. Under A.R.S. § 33-2613(A), any action to enforce a judgment or a lien over receivership property or obtain possession or control over receivership property is automatically stayed upon the appointment of a receiver. [21]

Additionally, under A.R.S. § 33-2613(C), any person may seek relief from the automatic stay upon showing “cause.” While UCRERA leaves the definition of “cause” to judicial discretion, the ULC’s comments clarify that “the right of a senior lienholder to obtain the appointment of a receiver under [the] Act or to proceed with a foreclosure after default” constitutes sufficient “cause” to lift the stay. [22] Under the Restatement (Third) of Property, a receiver appointed at the request of a junior lienholder may apply rents collected to the junior lienholder’s lien until the senior lienholder takes appropriate steps to enforce its right to collect the rents. [23] Accordingly, a senior lender should move quickly to seek relief from the automatic stay where a junior lienholder requests the appointment of a receiver under UCRERA. [24]

While the automatic stay under UCRERA mirrors the automatic stay applicable in bankruptcy under 11 U.S.C. § 362, there are important differences. First, under UCRERA, the court may void an action that violates the stay or injunction. [25] Unlike the Bankruptcy Code, violations of the stay are not considered automatically void. As a result, UCRERA places the burden on the receiver to ensure that additional steps to secure the benefit of the Act's automatic stay are taken. [26]

Second, a receiver may recover actual damages, including costs and attorneys’ fees, from a person that knowingly violates the stay. [27] There is no authority or legislative guidance on what constitutes a knowing violation of the stay under UCRERA. Applying the literal definition of the word would result in a heightened mens rea compared to that of 11 U.S.C. § 362 of the Bankruptcy Code, which does not require a creditor to have actual knowledge of the automatic stay. [28] Consequently, a prudent lender seeking the appointment of a receiver should ensure that the receivership order references the automatic stay as well as provide notice of the automatic stay and the receivership order to all creditors with an interest in the receivership property. The receiver should also record the receivership order with the applicable county recorder’s office so as to provide constructive notice to interested parties.

Executory Contracts

Like the Bankruptcy Code, UCRERA gives the receiver the power to “adopt” and “reject” executory contracts and unexpired leases with court approval. Currently there is no guidance on how the process for rejecting and assuming executory contracts occurs in practice under A.R.S. § 33-2616. Unlike the Bankruptcy Code, A.R.S. § 33-2616 does not provide a timeframe by which the receiver must adopt or reject an executory contract. [29] From a practical standpoint, the receiver will want to evaluate how to proceed with executory contracts and unexpired leases early to get an idea of the potential value of the property.

Furthermore, the Act does not specify the requirements for the assumption of an unexpired lease or executory contract. [30]

A court may condition a receiver’s assumption of an existing contract based on the “terms appropriate under the circumstances,” including providing the counterparty adequate assurance of the receiver’s ability to perform. [31]

Given the provision's similarity to 11 U.S.C. § 365(b), a court may condition the receiver's assumption of a contract in default on the purchaser curing the default and assuring future performance of the contract. [32]

The ULC’s comments on other bankruptcy-like provisions of UCRERA rely on the Bankruptcy Code for interpretative guidance. [33]

The receiver should proactively discuss the terms and conditions for assumption with the counterparty and document the terms of any agreement in an order approved by the court.

Issues that May Arise in a UCRERA Environment

There is potential for situations in which UCRERA may be too rigid for a receivership. Previously, rules governing receiverships were not as well-defined, and the receiver would only act in accordance with the instructions and authorizations from the Court. The role of the receiver may vary case by case; and UCRERA receiverships may apply a cookie-cutter approach that does not fit every situation. Receivers may be appointed to serve in a limited capacity rather than to take over the operations of a company.

Additionally, junior lenders may be unaware of the provision that eliminates subordinated liens, leaving them fighting to receive proceeds from any sales or nothing. Junior lenders are left in a weakened position under UCRERA and need to be vigilant in monitoring their collateral before they are left empty-handed.

Finally, it is possible courts could narrowly interpret the real estate component of UCRERA receiverships with the idea that one must own real estate rather than be a commercial landlord.

Advantages of Applying UCRERA’s Principles to Non-Real Estate Receiverships

Many of the features advantageous to receivers under UCRERA may also be beneficial to receiverships in a non-UCRERA (i.e., non-commercial real estate) setting. The ability to retain professionals, sell assets free and clear of liens, accept or reject executory contracts, and obtain an automatic stay may help receivers appointed to run a company in commercial disputes between owners. This authority may also help a receiver tasked with winding down the business. Receivers should familiarize themselves with UCRERA’s provisions so they can seek to have these powers incorporated into a receivership order where appropriate.

Conclusion

UCRERA is an underutilized and powerful tool that has provided a much-needed standardized approach for receivers who are appointed in certain real estate matters. With Arizona’s adoption of UCRERA in 2019, lenders, debtors, and any party with an interest in certain distressed real property in Arizona now have better expectations and a standardized framework to operate within a receivership setting. Lenders can draft security documents that allow for the application of UCRERA, and receivers can use the range of powers granted to them to operate businesses containing receivership property to preserve and maximize asset value. Alternatively, receivers can use their authority under UCRERA to transfer or dispose of receivership property outside of the ordinary course of business in a manner that maximizes value for lenders. Junior lenders and other creditors with claims on the property need to be aware of risks, including having liens eliminated by senior secured creditors, and determine the best way to protect their rights.

-----

References

[1] A.R.S. § 12-1241 grants the superior court the power to appoint receivers to generally protect and preserve property or the rights of parties therein.

[2] A.R.S. § 12-1242 governs the application process for the appointment of a receiver.

[3] See National Conference of Commissioners on Uniform State Laws, Uniform Commercial Real Estate Receivership Act (Jul. 29, 2016).

[4] See National Conference of Commissioners on Uniform State Laws, Uniform Commercial Real Estate Receivership Act (Oct. 17, 2023).

[5] Before UCRERA, Arizona courts relied on their equitable powers when making decisions regarding the extent of a receiver’s powers. A receiver unsure of his or her power to take a certain action would simply seek court approval. As long as the receiver acted within the scope of the receivership order, the receiver enjoyed quasi-judicial immunity.

[6] See National Conference of Commissioners on Uniform State Laws, Uniform Commercial Real Estate Receivership Act, (July 29, 2016) (comparing adequate protection under UCRERA to 11 U.S.C. § 361, and comparing a receiver’s turnover powers to a trustee or debtor-in-possession under 11 U.S.C. § 541(b); see also Nerko, L.L.C., v. Blue Bridge Benefits LLC, 2022 LEXIS 141 (N.C. Sup. Ct. Nov. 28, 2022) (finding the Bankruptcy Code’s framework is instructive when interpreting UCRERA).

[7] See A.R.S. § 33-2603 and Section 4 of UCRERA stating "[u]nless displaced by a particular provision of this chapter, the principles of law and equity supplement this chapter"; see also Bero v. Name Intelligence, Inc., 195 Wash. App. 170, 178 (Wash. Ct. App. 2016) (finding that the court retains broad discretion and provides a general receiver with broad authority to manage receivership property under Washington's receivership statute).

[8] See National Conference of Commissioners on Uniform State Laws, supra note 3, at sec. 16, cmt. 3 (stating a senior lender can ask the court to condition the receiver’s power under the Act in the receivership order to prevent the receiver from selling the property at a price that does not satisfy the senior debt); see also National Conference of Commissioners on Uniform State Laws, supra note 3, sec. 14(a) (noting the default rule unless otherwise "ordered by the court").

[9] Christopher Kaup, Arizona's New Receivership Statute: Reviewed, Interpreted and Applied, (2020).

[10] Id.

[11] A.R.S. § 33-2614(A).

[12] National Conference of Commissioners on Uniform State Laws, supra note 3, at sec. 15, cmt. 2.

[13] Id.

[14] While the authors were unable to find any court opinions discussing professional conflicts under UCRERA's new statutory scheme, the ULC’s comments make clear that it would not be appropriate for a receiver to also serve as an "appraiser" where the receiver seeks to sell commercial real estate property through the receivership.

[15] See Mony Life Ins. Co. v. Cissne Family L.L.C., 135 Wash. App. 948 (Ct. App. Wash. 2006) (challenging the receiver's compensation under RCW 7.60.180(4) because the receiver did not provide adequate documentation).

[16] A.R.S. § 33-2614(C).

[17] A.R.S. § 32-2619 (B).

[18] A.R.S. § 33-2615(B).

[19] A.R.S. § 33-2615(C).

[20] A.R.S. § 33-2615(B).

[21] A.R.S. § 33-2613(A).

[22] National Conference of Commissioners on Uniform State Laws, supra note 3, at sec. 14, cmt. 3.

[23] Restatement (Third) of Property: Mortgages § 4.5(b).

[24] Kaup, supra note 7, at 19.

[25] A.R.S. § 33-2613(F).

[26] See In re Shwartz, 954 F.2d 569 (9th Cir. 1992) (“[T]he Bankruptcy Code does not burden the debtor with a duty to take additional steps to secure the benefit of the automatic stay”).

[27] A.R.S § 33-2613(E).

[28] Under 11 U.S.C. § 362, a creditor does not have to intend to violate the automatic stay or have knowledge he is violating the stay so long as he intended the action that violated the stay. See In re Shwartz, 954 F.2d 569 (9th Cir. 1992); see also City of Chicago v. Fulton, 141 S. Ct. 585 (2021); Taggart v. Lorenzen, 139 S. Ct. 1795 (2019).

[29] The Bankruptcy Code sets forth special rules regarding the timing by which the trustee must act and the effect of not acting. For example, leases of nonresidential real property must be assumed or rejected within 120 days of the filing of the bankruptcy petition. Compare A.R.S. § 33-2616, with 11 U.S.C § 365.

[30] Compare A.R.S. § 33-2616, with 11 U.S.C. § 365(b)(1).

[31] A.R.S. § 33-2616(A); see also National Conference of Commissioners on Uniform State Laws, supra note 3.

[32] See 11 U.S.C. § 365(b)(1).

[33] See National Conference of Commissioners on Uniform State Laws, supra note 3, at sec. 11, cmt. 3.

Firm Highlights

Insights

EPA Limits Title V Re-Litigation of NSR Permits

Overview On September 25, 2026, the U.S. Environmental Protection Agency (“EPA”) published a final rule that significantly limits the ability of third parties to use the Clean Air Act (“CAA”) Title V permitting process to revisit New Source Review (“NSR”) permitting decisions years after those decisions were made. The rule establishes that NSR permitting determinations generally must be challenged during the original permitting proceeding, thereby providing regulated sources with greater permitting certainty and finality for major capital projects. Published in the Federal Register titled Clarifying the Scope of “Applicable Requirements” Under State Operating Permit Programs and the Federal Operating Permit Program (Docket ID No. EPA-HQ-OAR-2023-0401), the rule amends 40 C.F.R. Parts 70 and 71 to codify EPA’s interpretation regarding when requirements established under other CAA programs may be reviewed, modified, or implemented through the Title V operating permit program. The rule becomes effective 30 days after publication. The rule addresses two principal issues: (1) the relationship between NSR preconstruction permitting and Title V operating permits, and (2) the treatment of the General Duty Clause under CAA section 112(r)(1). Most significantly, the rule provides greater certainty for sources navigating the NSR permitting process. EPA’s amendments are intended to ensure that NSR permitting decisions made through an approved public process are generally not revisited later through Title V permit proceedings. The rule responds to a circuit split between the U.S. Courts of Appeals for the Fifth and Tenth Circuits. In Environmental Integrity Project v. EPA, 969 F.3d 529 (5th Cir. 2020), the Fifth Circuit upheld EPA’s interpretation, concluding that it was consistent with the text, structure, and purpose of Title V. In contrast, the Tenth Circuit reached the opposite conclusion in Sierra Club v. EPA, 964 F.3d 882 (10th Cir. 2020), finding that the then-existing regulatory definition of “applicable requirement” did not support EPA’s position. By amending the regulatory language on which the Tenth Circuit relied and codifying the interpretation approved by the Fifth Circuit, EPA has established a nationwide framework governing the interaction between NSR and Title V. NSR and Title V: EPA Establishes a Uniform Nationwide Framework At the core of the rule is EPA’s effort to define the respective roles of NSR and Title V. The rule codifies the approach EPA has applied since 2017: once a source obtains an NSR permit under an EPA-approved permitting program, and that permit was issued following public notice with an opportunity for comment and judicial review, the permit establishes the NSR-related “applicable requirements” of the State Implementation Plan (“SIP”) or Federal Implementation Plan (“FIP”) for Title V purposes. Under this framework, Title V is not a vehicle for re-examining underlying NSR permitting decisions. EPA does not intend to use the Title V process to revisit applicability determinations, emissions calculations, control technology determinations, permit conditions, or other issues resolved through the NSR permitting process. This principle applies regardless of the stage of the Title V proceeding; whether the NSR permit was issued pursuant to a SIP or FIP; the type of NSR issue involved; or whether the NSR permit is incorporated into Title V sequentially or concurrently. Limited Exceptions EPA recognizes several circumstances in which NSR issues may still be reviewed through the Title V program: No NSR permit was issued at all; The permit was issued without public notice and an opportunity for comment and judicial review; or The issue involves substantive overlap between Title V and NSR requirements, such as the adequacy of monitoring provisions. As a result, the rule does not insulate unpermitted projects or foreclose review of matters that independently arise under Title V. Key Regulatory Amendments The rule revises the definition of “applicable requirement” in 40 C.F.R. §§ 70.2 and 71.2. Paragraph (1): Where an NSR permit is issued with public notice and an opportunity for comment and judicial review, the permit establishes and defines the applicable SIP or FIP requirements for Title V purposes. Paragraph (2): All NSR permit terms, including terms contained in minor NSR permits, constitute applicable requirements that must be incorporated into Title V permits. Paragraph (4): CAA section 112(r)(1) (the General Duty Clause) is expressly excluded from the definition of “applicable requirement,” while section 112(r)(7) Risk Management Program requirements remain included. EPA also amended 40 C.F.R. §§ 70.8 and 70.12 to clarify that alleged defects in requirements established outside the Title V process generally do not provide a basis for EPA objection to a Title V permit or for a Title V citizen petition. General Duty Clause Exclusion The rule also codifies EPA’s longstanding position that the General Duty Clause in CAA section 112(r)(1) is not an “applicable requirement” for Title V purposes. EPA points to several considerations supporting that conclusion, including the distinction between the General Duty Clause and Title V permit terms, the provision’s origins in the Occupational Safety and Health Act’s general duty clause, and the different enforcement structures applicable to the General Duty Clause and Title V permit requirements. Importantly, excluding section 112(r)(1) from the definition of “applicable requirement” does not eliminate EPA’s authority to enforce the General Duty Clause independently of the Title V program. The final rule instead clarifies that the General Duty Clause need not—and should not—be incorporated into Title V permits as an applicable requirement. Practical Implications for Regulated Sources Greater Finality for NSR Permits  For projects requiring PSD, nonattainment NSR, or minor NSR permits, the permitting process becomes the primary forum for resolving disputes regarding applicability determinations, emissions calculations, control technology requirements, offsets, and permit conditions. Once an NSR permit is issued through a qualifying public process, regulated sources should face substantially reduced risk that those same issues will be challenged years later through Title V permit proceedings. Reduced Risk of Collateral Permit Challenges Stakeholders have sometimes sought to use Title V permit issuance, renewal, revision, or citizen-petition proceedings to challenge underlying NSR determinations. The final rule makes clear that Title V is not the appropriate vehicle for challenging whether an applicable requirement was correctly established in the first instance. This should reduce the risk of permit delays and uncertainty associated with collateral challenges to previously issued NSR permits. The rule does not, however, eliminate all Title V challenges relating to an NSR permit. Challenges concerning the Title V permit itself—including whether it appropriately incorporates applicable requirements or contains adequate compliance provisions—remain possible. Increased Importance of the Initial NSR Proceeding Because Title V generally will not provide a second opportunity to challenge the substantive validity of an NSR determination, the administrative record developed during the NSR process becomes increasingly important. Permit applicants should ensure that applicability analyses, emissions calculations, control technology evaluations, modeling demonstrations, and supporting technical documentation are thoroughly developed during the original permitting proceeding. For significant projects, applicants may therefore have an additional incentive to identify and resolve potential permitting issues before the NSR permit is issued rather than assuming that unresolved issues can be addressed during a subsequent Title V proceeding. Potential Incentive for Broader Public Participation EPA also notes that permitting authorities may choose to provide public notice and an opportunity for comment for a broader range of NSR permits because permits issued through a qualifying public process receive the benefit of the finality framework established by the rule. Some permitting authorities may conclude that greater public participation at the NSR stage is preferable to uncertainty during subsequent Title V proceedings. Conclusion The final rule is principally a permitting-certainty measure. For sources that obtain NSR permits through a public process, EPA has substantially limited the ability of third parties to revisit underlying NSR determinations through the Title V program. As a result, regulated entities should benefit from greater finality regarding key permitting decisions, reduced risk of collateral permit challenges, and increased certainty when planning and implementing capital projects.

Insights

The Supreme Court Update - October 8, 2026

On September 29, 2026, the Supreme Court granted certiorari in one case: Department of Homeland Security v. D.V.D., No. 26-426: This case concerns the Trump Administration’s “third-country removal” procedures, where immigrants are deported to countries not listed in the removal orders. In granting certiorari, the Court granted the Government’s application to stay a lower court decision halting the practice, which will allow third-country removals to continue pending resolution of the case. The issues presented are: (1) Whether the district court had jurisdiction over respondents’ claims; (2) whether the district court had authority to enter class-wide declaratory relief and APA vacatur under 8 U.S.C. § 1252(f)(1); (3) whether the Government’s guidance on third-country removals is unlawful under 8 U.S.C. § 1231(b), the due process clause, or FARRA/CAT and its implementing regulations; and (4) such other questions that the Government determines are appropriate for the proper disposition of the case. On October 1, 2026, the Court granted certiorari in three additional cases: Rhoney v. Barbosa da Cunha, No. 26-104: Immigration officials detained Ricardo Aparecido Barbosa da Cunha—a Brazilian citizen who had lived in the United States for approximately twenty years after entering without inspection—and denied him a bond hearing under 8 U.S.C. § 1225(b)(2)(A). The Second Circuit held that his detention was instead governed by § 1226(a), which permits release on bond, because § 1225(b)(2)(A)’s mandatory-detention requirement applies only to noncitizens apprehended while entering the country or shortly thereafter. The question presented is: Whether 8 U.S.C. § 1225(b)(2)(A) mandates the detention pending removal proceedings of aliens who, like Barbosa da Cunha, are present in the United States without having been admitted. Missionaries of St. John the Baptist, Inc. v. Frederic, No. 25-113: A Catholic religious organization sought to build a shrine to the Virgin Mary on land the organization owned adjacent to its church in Park Hills, Kentucky. Local zoning restrictions prohibited the proposed construction. The question presented is: Whether a land-use regulation that prohibits a religious institution from building a religious structure on its own property constitutes a “substantial burden” on religious exercise under the Substantial Burden Provision of the Religious Land Use and Institutionalized Persons Act, 42 U.S.C. § 2000cc(a). Marschner v. Marschner, No. 25-1349: Under the Uniformed Services Former Spouses’ Protection Act (“USFSPA”), a veteran’s longevity-based retirement pay can be divided in a divorce, but retirement pay based on disability and retirement pay that was waived to receive disability pay are indivisible. The question presented is: Does the USFSPA require state courts to refuse enforcement of indemnification provisions in a divorce settlement agreement?

Insights

SEC Proposes Expansion of Investment Adviser Performance-Based Compensation Rule

On September 30, 2026, the Securities and Exchange Commission (the “SEC”) proposed amendments to Rule 205-3 under the Investment Advisers Act of 1940, as amended (the “Advisers Act”), which provides an exemption from the general prohibition under Section 205(a)(1) of the Advisers Act on registered investment advisers receiving performance-based compensation (the “Proposal”) so long as performance-based compensation is limited to “qualified clients”.1 Most notably for private fund sponsors, the Proposal would expand the definition of “qualified client” to include any investors that satisfy the “accredited investor” definition under Regulation D. The Proposal may also have implications for private fund managers that rely on exemptions from investment adviser registration under state law because certain state-level investment adviser registration exemptions incorporate or otherwise reference the federal qualified client definition. Expansion of the Qualified Client Definition Under the current Rule 205-3, an investor generally may qualify as a qualified client if, among other alternatives, the investor has at least $1.4 million under management with the adviser or has a net worth exceeding $2.7 million. These thresholds are higher than the financial thresholds applicable to many accredited investors under Regulation D. As a result, an investor may currently qualify as an accredited investor for purposes of investing in a private offering without qualifying as a qualified client for purposes of paying performance-based compensation. The Proposal would expand the qualified client definition to include any natural person or legal entity investor that satisfies the accredited investor definition under Regulation D. The Proposal would also remove the assets under management and net worth thresholds under the current Rule 205-3 qualified client test. For private funds relying on Section 3(c)(1) of the Investment Company Act of 1940, this change could reduce the need to apply a separate qualified client standard to investors that already qualify as accredited investors. Dorsey Observations and Next Steps If adopted as proposed, the expanded qualified client definition could be particularly significant for private fund managers. Most private fund offerings are already limited to accredited investors under Regulation D. However, the Proposal could expand the pool of prospective investors available to emerging private fund managers while reducing the regulatory burden associated with complying with Rule 205-3. The Proposal could also benefit advisers operating below the SEC registration threshold that rely on a state private fund adviser exemption. A number of states have adopted exemptions modeled on the North American Securities Administrators Association (“NASAA”) private fund adviser exemption, which may condition relief for advisers to certain funds relying on Section 3(c)(1) on each beneficial owner satisfying the federal qualified client definition. However, state requirements vary, and any effect of the Proposal would depend on the text of the applicable state exemption and how it incorporates Rule 205-3. Many emerging private fund managers may have a larger network of accredited investor relationships than qualified client relationships during the early stages of their investment advisory business. Currently, under Rule 205-3, private fund managers may receive performance-based compensation from investors who do not satisfy the qualified client definition if those investors were admitted to their private funds prior to registration with the SEC. Following registration with the SEC, however, managers may continue to permit investors that are not qualified clients to invest in future private funds but may not receive performance-based compensation from those investors with respect to such investments. In addition, because the net worth and assets under management thresholds for qualified client status are adjusted for inflation every five years, the pool of qualified client investors may diminish over time as previously eligible investors no longer satisfy the applicable thresholds. The Proposal could provide the dual benefit of greater flexibility for private fund managers to establish and maintain relationships with accredited investors as their businesses scale and they become registered with the SEC, and greater flexibility for certain accredited investors to participate in investment strategies that historically have been restricted to much larger institutional investors. Unless and until the Proposal is adopted, investment advisers should continue to comply with the existing qualified client requirements. If the Proposal is adopted, private fund sponsors should consider whether corresponding changes are appropriate for their subscription documents, investor questionnaires, and other offering materials. Advisers that are state-registered or rely on a state-level exemption should also consult the laws and regulations of each relevant jurisdiction before changing investor eligibility standards or performance-based compensation practices, because adoption of the federal amendments may not automatically modify state requirements. Comments on the Proposal will be due 60 days after publication in the Federal Register. 1 Investment Adviser Performance-Based Compensation Modernization, Investment Advisers Act Release No. IA-7022 (Sept. 30, 2026), available at https://www.sec.gov/rules-regulations/2026/09/s7-2026-28#33-11443proposed.

Insights

Energy Law: Month in Review - September 2026

Welcome to Dorsey’s Energy Law: Month in Review. We provide this update to our clients to identify significant developments in the previous month. Please reach out to any of the authors, listed above, to discuss these issues. Regulatory Developments Massachusetts Ratchets Up State and Local Regulation of AI Data Centers In early September, Governor Maura Healey of Massachusetts signed an executive order requiring that artificial intelligence data centers secure the approval of local communities as a precondition to proceeding with a given project. According to the terms of the order, data center developers will need to secure a “community benefits agreement” as a precondition to receiving permits from numerous state agencies, including the Department of Environmental Protection, the Energy Facilities Siting Board, and the Massachusetts Environmental Policy Act Office. Beyond requiring community benefits agreements, the order also mandates that developers mitigate utility costs to consumers, prohibits the use of nondisclosure agreements, and requires various state agencies to develop measures to limit data center impacts on the environment. North Carolina Regulators Decline Approval of Duke Energy Gas Turbine On September 18, 2026, North Carolina Utilities Commission (NCUC) denied Duke Energy’s application for a certificate of public convenience and necessity required to construct a gas-fueled combustion turbine at its Smith Energy Complex in North Carolina. The NCUC objected strongly to the $584 million price tag and noted that Duke appeared to be constructing the facility “based on anticipated data center customer additions.” The NCUC rejected that anticipated growth as “insufficiently reliable for the Commission to act at this point.” In rejecting Duke’s application, the NCUC also noted that Duke had signed the White House Ratepayer Protection Pledge, in which it represented that it would not shift data center costs to consumers. The NCUC observed that the record did not demonstrate how Duke “intends to adhere to its commitments under the Ratepayer Protection Pledge with regard to the Proposed Facility.” Notably, commission staff had actually supported the construction of the turbine, citing concerns about Duke’s reserve margins. The NCUC noted that it “understands the Public Staff’s expressed concerns,” but those concerns were outweighed by the NCUC’s reservations, including questions of demand. Department of Energy Approves Funds for Grid Improvement The U.S. Department of Energy (DOE) recently announced that it would fund 31 grid-improvement projects in 26 states. The funding initiative is part of the DOE’s “SPARK” initiative. The funding will include $1.9 billion in federal funding from DOE and $3.35 billion in recipient cost-sharing funding. The funds will go to projects designed to improve grid reliability and lower electricity costs. Recipients plan to reconductor over 1,500 miles of transmission lines and will deploy grid-enhancing technologies across approximately 21,000 miles. DOE stated that this initiative will make available over 23 additional gigawatts of electricity. Texas Moderates Rules Governing Data Center Interconnection The Texas Public Utility Commission adopted new regulations governing large-load interconnections. The rules impose a flat study fee of $100,000 for all proposed interconnections, which departs from the initial proposal to impose study fees using a tiered system based on project size. Additionally, the final rule eliminates the PUC’s previous proposal to impose a non-refundable interconnection fee of $50,000 per MW of contracted peak demand. The final rule also moderates the initially proposed regulations governing Electric Reliability Council of Texas (ERCOT) notifications for large-load customers’ non-utilized capacity. The proposed rules would have required notifying ERCOT within 30 days of missing a scheduled energization milestone by six months. The final rules, however, do not require informing ERCOT unless a scheduled energization milestone is missed by 24 months. FERC Denies TransAlta 202(c) Cost-Recovery Plan The Federal Energy Regulatory Commission (FERC) recently rejected TransAlta’s plan to recover $19.9 million in expenses stemming from a DOE order in which DOE prohibited TransAlta from retiring its coal-powered Centralia power plant. TransAlta had previously intended to retire the facility at the end of 2025. TransAlta’s cost recovery plan proposed spending an additional $23 million on repairs to continue operating the unit. FERC’s main objection had to do with geographic scope. TransAlta’s recovery plan called for recovering costs from California Independent System Operator (CAISO) and the Southwest Power Pool (SPP), but the DOE’s order requiring operation of the plant was designed to ensure reliability in the Northwest assessment area (Montana, Oregon, Washington, and parts of northern California and northern Idaho). Accordingly, FERC was unwilling to allow cost recovery from CAISO and SPP when the order that precipitated the additional costs only related to the Northwest assessment area. FERC informed TransAlta that it would only approve cost recovery from load-serving entities in the Northwest assessment area. FERC’s decision comes amid a rush of DOE emergency orders requiring the continued operation of coal-fired generating units. Litigation Appeals Court Upholds Washington Hydropower Plant With Caveats In a September 21, 2026, opinion, the Washington Court of Appeals largely upheld a Clean Water Act water quality certification by the Washington Department of Ecology for the Goldendale Energy Storage Project, a proposed pumped-water storage hydropower system adjacent to, but off-stream from, the Columbia River. A nonprofit (Columbia Riverkeeper) and the Confederated Tribes and Bands of the Yakama Nation appealed the certification, contending that it failed to impose necessary conditions and monitoring requirements to protect the water quality of the Columbia River. Most saliently, the plaintiffs argued that the project had the potential to leak 100 acre-feet of water per year into tributaries of the Columbia River. The Court of Appeals broadly rejected plaintiffs’ challenge to the state’s conclusion that “the project was designed not to leak.” That said, the Court of Appeals did reverse on one narrow issue. Specifically, the court determined that the state’s conclusion that “leakage from the project’s tunnels would be monitored and reported” was not supported by the evidence because the certification “does not explicitly require monitoring and reporting to determine whether there is any leakage.” Accordingly, the court remanded the matter to the state to impose monitoring and reporting requirements but otherwise affirmed the certification. Legislative Developments California Legislates Restrictions on Data Center Energy Use and Grid Costs On September 21, 2026, California Governor Gavin Newsom signed seven bills broadly regulating data centers in the state. SB 1168 directed the California Public Utilities Commission to assess the energy used by data centers. It also requires the PUC to pass costs of transmission and distribution upgrades and load increases on to data centers, rather than customers. SB 886 and SB 887 compel data centers to pay for infrastructure upgrade and generation costs, and wildfire mitigation costs, in addition to imposing environmental review. The statutes additionally increase local oversight of data centers. AB 1577 imposes a monthly reporting requirement that requires data centers to supply energy consumption and efficiency data to the California Energy Commission. AB 2383 contains incentives for data centers to use onsite clean energy generation. Finally, AB 2469 and AB 2619 require data center developments to assess water supply and develop a water scarcity plan. The statutes also mandate statewide water reporting as a precondition to obtaining and renewing business licenses.