.

Steve represents energy companies before the Federal Energy Regulatory Commission (FERC) and in the courts on matters involving the electric energy, natural gas, and oil industries.

Steve brings decades of experience in federal energy regulation to clients in the electric power, natural gas, and oil industries. He handles FERC approvals for generation and transmission acquisitions, negotiated-rate authority for merchant transmission projects, and enforcement investigations for pipeline and utility clients, and related regulatory matters in other agencies and  the courts.

Much of Steve's work involves the Federal Power Act (FPA) and the Natural Gas Act (NGA). He advises electric utilities on generator and transmission interconnection matters, helps them obtain market-based rate authorization, prepares interconnection agreements, negotiates power purchase agreements.  He counsels natural gas companies on NGA Section 7(c) certificate proceedings for pipeline construction and capacity expansions, negotiates the commercial agreements that support those projects, and represents local distribution companies, producers, and marketers in pipeline rate proceedings.

Steve crafts regulatory compliance programs for electric and natural gas companies and defends them in FERC enforcement investigations.

Steve also advises on cross-border energy transactions with Canada and Mexico and helps clients obtain required permits.   His appellate experience spans the D.C. Circuit, the Seventh Circuit, and the Ninth Circuit.

Select Experience

  • ​​​​​​Guided new transmission, storage, and export projects (involving electricity, natural gas, liquefied natural gas (LNG), and petroleum) through the development process, including conducting open seasons, negotiating and drafting commercial agreements with anchor customers, preparing tariff filings, and coordinating interconnection.
  • Advised electric utilities, transmission developers, and generators on interconnection agreements and power purchase agreements.
  • Helped a local distribution company and a natural gas marketer recover significant damages in multiple federal court cases involving sellers’ failure to deliver gas.
  • Advised natural gas and electric companies on regulatory responsibilities, crafted compliance training programs, and successfully resolved FERC enforcement investigations.

Education

  • University of North Dakota (J.D., 1986)
    • Order of the Barristers
  • University of North Dakota (M.A., English, 1982)
    • summa cum laude
  • University of North Dakota (B.A., English and Honors Program, 1979)
    • magna cum laude

Bar Admissions

  • District of Columbia

Court Admissions

  • U.S. Court of Appeals for the District of Columbia Circuit
  • U.S. Court of Appeals for the Seventh Circuit
  • U.S. Court of Appeals for the Ninth Circuit

Professional Affiliations

Regularly teaches classes on electric regulation and FERC enforcement & compliance, including:

  • “Electricity 101,” Geopolitics of Energy, Georgetown University, November, 2020
  • “Electricity 202,” AGA 11th Annual Energy Market Regulatory Conference, Bellvue, Washington, September 27, 2018
  • “Electricity 201,” AGA 10th Annual Energy Market Regulatory Conference, Washington, DC, October 2017
  • “How Did We Get Here and Where Are We Going?: A Retrospective Study of Regulatory Oversight for the Development of Natural Gas and Oil Pipelines,” Florida Energy Pipeline Association’s Summer Symposium, July 2017
  • "Electricity 101," AGA 9th Annual Energy Market Regulatory Conference, Washington, DC, December 2016
  • “Clean Power Plan," 57th Annual Institute of Public Utilities Regulatory Studies Program (aka Camp NARUC), East Lansing, Michigan, August 2015
  • "Utility Mergers and Acquisitions," NAEMA-WSPP Fall Conference, Broomfield, CO, September 2014

Accolades

  • Repeatedly recognized by Super-Lawyers® in the areas of energy and natural resources law, administrative law and utilities law.

Insights

Articles

Construing Congressional Silence: With the Natural Gas Act’s Not Addressing Compensation in Pipeline Condemnations, Can Courts Use State Law to Award Attorney Fees?

October 29, 2026

On November 9, 2026, the Supreme Court will hear oral arguments in Leonard W. Hoffmann v. WBI Energy Transmission, Inc. to determine: “In private condemnations under the Natural Gas Act, should just compensation be determined by reference to state law?” North Dakota ranchers litigated the price of a natural gas pipeline easement during three years of condemnation proceedings, settled on the easement price, and were awarded attorney fees based on state law, but the fees were denied by Eighth Circuit, which held that because the Natural Gas Act (“NGA”) provision authorizing pipelines to use of eminent domain does not address compensation, the Fifth Amendment standard must necessarily apply, that is, “just compensation” for property, but not attorney fees.1 Four other circuits disagree. The Court will resolve the circuit split, likely making some pipeline condemnations less expensive and quicker or, alternatively, more expensive and take longer. Whatever the result, Congressional action could follow. Background Section 7(c) of the NGA requires the Federal Energy Regulatory Commission (“FERC”) to issue a certificate of public convenience and necessity, before new interstate natural gas pipeline facilities can be constructed and operated.2 Significantly, only a private party – not the federal government, not a state, nor a municipality – can obtain certificate authorization.3 The NGA did not initially address property acquisition, leaving certificate holders to rely on state condemnation law to secure necessary property rights to develop their projects, rendering some with “only an illusory right to build.”4 Congress resolved that by enacting NGA Section 7(h), which vests certificate holders with the ability to exercise eminent domain in a federal or state court where the property is located.5 Yet Section 7(h) does not address compensation: it does not indicate whether attorney fees can be recovered; “it does not even expressly require that just compensation be provided.”6 Litigation over the meaning of the Congressional compensation silence ensued. After Years of Litigation, Parties Agreed on Easement Price, but Not Attorney Fees In February 2018, WBI Energy Transmission, Inc. (“WBI”) received certificate authorization to construct and operate approximately 12 miles of 24-inch diameter pipeline through ranch land in western North Dakota, in the heart of the oil and gas producing Bakken formation of the Williston Basin.7 WBI and the ranchers could not agree on an easement price: the ranchers had recently negotiated easement prices with oil pipelines (which do not have eminent domain rights and must pay “market” prices to obtain easements) and sought a similar deal,8 but WBI was unwilling, instead offering only what it paid for a parallel natural gas line easement years earlier.9 So WBI filed in federal district court a complaint to take by eminent domain a permanent easement and temporary rights-of-way to construct the pipeline. Shortly thereafter, with the agreement of the ranchers, the court ordered that WBI could have immediate use and possession of the easements necessary for construction, leaving for trial the amount of compensation.10 The Fifth Amendment guarantees that private property shall not be taken for public use without just compensation.11 WBI and the ranchers disagreed on what constitutes “just compensation.” WBI maintained that compensation should be determined solely by the “before and after rule” – i.e., the difference between the market value of the land free of the easement and the market value burdened with the easement.12 The ranchers argued that other factors should also be considered, such as market rate paid by oil pipelines for easements on the properties.13 WBI filed a motion in limine to exclude evidence and testimony of such payment information, which the trial judge denied,14 leading to a confidential settlement on the value of the easement, with the ranchers’ reserving their right to seek attorney fees and expenses and WBI’s reserving its right to contest. After three years of litigation, the ranchers sought to recover $383,375.76 – that is, $332,274.96 in legal fees and $50,650.86 in costs and expenses.15 WBI claimed that the amount was unreasonable and should be limited to $220,625.52.16 The trial court, recognizing that the NGA was silent on compensation issues, relied on United States v. Kimbell Foods, Inc.17 to analyze whether to “fill in the gap” with North Dakota condemnation law and ultimately concluded it could award attorney fees and costs.18 WBI appealed. Four Circuits Rely on Kimbell Foods and State Law to Award Attorney Fees Courts have recognized the difference between condemnations by the federal government and a private party: “the sovereign need only pay for what it actually takes rather than for all that the owner has lost.”19 “[W]here the federal government is the condemnor there exists a significant concern about the spending of federal dollars, one that does not exist when a private entity is the condemnor . . . pursuing the condemnation ‘for purposes of profit.’”20 As such, four circuit courts have applied federal common law to allow recovery of attorney fees and costs in condemnations under the NGA.21 “In crafting such federal common law, courts need not inevitably … resort to federal rules,”22 but rather, after weighing various considerations set forth in the Supreme Court’s 1979 opinion in Kimbell Foods, can apply state law.23 In particular, the four circuits answered “no” to each of the following three questions posed in Kimbell Foods: “(1) whether the federal program, by its very nature, required uniformity; (2) whether application of state law would frustrate specific objectives of the federal program; and (3) whether application of uniform federal law would disrupt existing commercial relationships predicated on state law.”24 The Eighth Circuit took a different tack. Eighth Circuit Reversed and Barred Attorney Fees, Breaking with Sister Circuits The Eighth Circuit framed the issue this way: “Under North Dakota law, as the district court points out, attorney fees are available in condemnation proceedings. WBI’s view is that federal law applies because it was exercising the eminent-domain power of the United States, which would owe no attorney fees if it did the condemning.”25 The court then held: “Just compensation” under the Fifth Amendment has a well-established legal meaning that usually equates to “market value,” the “full monetary equivalent of the property taken.” * * * But the focus is always on the value of the property itself, not what the owner spends trying to keep it. * * * Under the Fifth Amendment, property owners cannot recover for “indirect costs” like attorney fees and expenses. Only a statute can require more. * * * [T]he Natural Gas Act says nothing about the measure of compensation due to a property owner.  It does not even use the words “just compensation,” let alone say that attorney fees are available or that an agency or state law can provide them. Without such an exercise of “legislative grace,” the default rules applies: “just compensation” under the Fifth Amendment.26 The Eighth Circuit recognized “that different concerns are at stake when the United States is exercising its own power under the Fifth Amendment…. But these are policy arguments better addressed to Congress.”27 Petition For Writ of Certiorari Granted to Resolve Circuit Split The ranchers filed with the Supreme Court a petition for a writ of certiorari to resolve the split between the Eighth Circuit and four other circuits.28 WBI initially opposed the petition,29 but relented after the Solicitor General urged the court to grant petition and uphold the Eighth Circuit opinion.30 The attorneys general of ten states31 and a national network of eminent domain and property lawyers filed amici curiae (friends of the court) briefs in support of the ranchers’ petition.32 Shortly after WBI and ranchers filed supplemental briefs,33 the Supreme Court granted the petition for certiorari on June 26, 2026.34 Ranchers Focused on Statutory Interpretation, Six Amici on Economic Fairness Rather than rely primarily on Kimbell Foods, the ranchers’ merits brief used statutory interpretation to argue that private condemnation lawsuits under the NGA should use state law compensation rules.35 They contend that, in contrast to various ways that the federal government can take land,36 NGA Section 7(h) grants a limited “delegation of power to take property through a condemnation lawsuit – to file what is sometimes called “a straight condemnation,”37 where authorization to take property is not sought, but instead for the court to adjudicate the value of the property: “If the condemnor wants to buy the property at the court’s price, it tenders payment; if not, it can abandon the condemnation.”38 Thus, the ranchers submit that their rights to compensation under the NGA flow not from the Fifth Amendment, but rather from the NGA’s authorizing “the filing of a lawsuit whose purpose is to adjudicate how much they must be paid for their land.”39 If the condemnor were the federal government, compensation would not be greater than the Fifth Amendment minimum, absent statutory authorization;40 but that does not require the same to result in a private condemnation. The ranchers suggest that several additional reasons support using state law to resolve property compensation issues. First, given that real property law “lies at the core of traditional state authority”,41 compensation should consider “North Dakota’s rule that property owners cannot be made to bear the cost of their condemnation….”42 Second, based on the “Court’s longstanding practice of borrowing state substantive law,” the issue is not whether NGA Section 7(h) incorporates state land valuation rules, but “whether the statute preempts them.”43 Third, unless an easement’s value is above a statutory minimum,44 the condemnor can only file in state court: “If Congress expected those state courts to look to a source of law other than the one they would ordinarily look to in a property case, one could expect it to have left some hint to that effect in the text. But there isn’t one.”45 Fourth, awarding attorney fees under state law is consistent with the purpose of NGA Section 7(h): Respondent suggests that Congress, out of a desire to fix a problem in Missouri (where interstate natural-gas companies lacked an eminent-domain cause of action), also decided to take some money away from farmers and ranchers in places like Iowa (where the companies already had a cause of action). Surely not.46 Six groups filed amicus briefs supporting the ranchers.47 Among them, Florida property owners, who were involved in a different condemnation proceeding,48 contend that (1) compensation rules for federal government acting in its own name should not apply to private, for-profit companies acting under a limited delegation of eminent domain,49 and (2) “property owners who are without economic wherewithal proceed in an unrepresented fashion and are typically forced to accept a compromise close to the amount of the private licensee company’s low offers because they are not otherwise with the means to prepare their own valuation estimates and defend their respective constitutional entitlement to compensation.”50 This was reinforced by a group of property lawyers: In 2016, under the auspices of the Natural Gas Act (“NGA”), the Sabal Trail natural gas pipeline project in Florida took land from Ryan B. Thomas and offered him $6,800 in exchange. A Florida jury later determined that the measure of compensation for Sabal Trail’s taking was $463,439. Sabal Trail had thus initially offered Mr. Thomas 1.4% of his land’s value. Between the initial offer and the jury’s determination of compensation lay months of litigation work by Mr. Thomas and his attorney.51 The property lawyers also argued that affirming the Eighth Circuit’s decision would strip property owners of state law protections in 21 states.52 WBI Argued NGA Silence on Attorney Fees Intentional, Supported by Three Amici WBI’s merits brief contends that condemnation by a private party is nothing new and does not require a different set of rules from the Federal government’s condemning land: “For as long as the eminent domain power has been exercised by the United States, it has also been delegated to private parties.”53 These private delegatees “knitted together the expanding nation by building railroads, bridges, roads, and telegraph and telephone lines”54 and, absent a Congressional directive, paid the fair market value of the property taken, as required by the Fifth Amendment.55 WBI points to a 1943 case, United States ex rel. Tennessee Valley Auth. v. Powelson,56 which summarized then existing law: “[i]n the absence of a statutory mandate, the sovereign must pay only for what it takes, not for the opportunities which the owner may lose”.57 Indeed, Congress knew how to depart from the Fifth Amendment’s fair-market-value measure of condemnation compensation: “One year before enacting Section 717f(h), in the General Bridge Act of 1946, Congress authorized private parties to condemn land for bridges and expressly required that compensation ‘be ascertained and paid according to the laws of [the] State’ where the property sits.”58 Additionally, WBI argues that the ranchers essentially urge the court to adopt a patchwork of individual state compensation laws, which would undermine what Congress did in enacting NGA Section 7(h) --“eliminate state-by-state variation in NGA condemnations so that certificate-holders could efficiently construct interstate pipelines.”59 Three amicus briefs were filed in support of WBI, including one from the Attorney General, who reiterated: “Just compensation under the Fifth Amendment ‘is for the property, and not the owner. Accordingly, ‘indirect costs to the property owner caused by the taking of his land,’ such as ‘attorneys fees’ are ‘generally not part of the just compensation to which his is constitutionally entitled.’”60 Another amicus brief filed by trade associations claimed that interstate natural gas pipelines are responsible stewards of eminent domain, exercising it only as a last resort, as evinced by a survey indicating that, over a recent nine-year period FERC-certificated pipeline projects more than ten miles in length (25,268 tracts) resulted in only 10% of the tracts requiring condemnation and less than one percent (1%) required litigation.61 Finally, the US Chamber of Commerce emphasized the importance of natural gas to businesses,62 and urged the Court not to create obstacles that would “chill investment in essential infrastructure….”63 Crystal Ball Judicial Tension between “Strict Construction” and Support for Property Rights? Hoffmann could set up a clash between a favored method of the Supreme Court for resolving conflicts and a centuries’ long commitment to protecting a fundamental right. Questions during oral arguments could foreshadow which way the Court will lean. On one hand, the Court could rely on NGA Section 7(h)’s “’plain meaning’ derived from an ordinary understanding of the words and structure of the statutory text.”64 Consider the Supreme Court’s rationale in Dobbs v. Jackson Women’s Health Organization,65 which overruled the landmark Roe v. Wade:66 “The Constitution makes no reference to abortion, and no such right is implicitly protected by any constitutional provisions including . . . the Due Process Clause of the Fourteenth Amendment.”67 This type of “strict construction”68 aligns most closely with WBI’s argument that Section 7(h) does not specifically provide for attorney fees, and the silence was intentional, given that Congress expressly permitted recovery of attorney fees in eminent domain actions under the General Bridge Act of 1946, the year before enactment of NGA Section 7(h).69 On the other hand, the ranchers’ arguments resonate with a long line of cases protecting property rights. More than 130 years ago, the Court in Monongahela Nav. Co. v. U.S.70 explained that in condemnation cases the courts should adhere to “the rule that constitutional provisions for the security of person and property should be liberally construed.  A close and literal construction deprives them of half their efficacy, and leads to gradual depreciation of the right….”71 Half a century ago, the Supreme Court, in Lynch v. Household Fin. Corp,72 emphasized: “Property does not have rights. People have rights.”73 Three years ago, all nine justices, in Tyler v. Hennepin County, Minnesota,74 ruled for a property owner, holding that a local government cannot keep the surplus profit after selling a seized home for unpaid taxes.75 The policies in these (and other cases cited by the ranchers) would appear to support landowners’ recovering the costs incurred to defend their property in condemnation proceedings. Whether a strict construction of NGA Section 7(h) permits those policies to be realized in Hoffmann remains to be seen. Implications and Possible Congressional Action The amount of compensation offered by pipelines and the length of condemnation proceedings may change, depending on how the Supreme Court rules. If the Court upholds the Eighth Circuit opinion – and concludes that attorney fees and costs cannot be recovered –a landowner may be presented with an unsavory decision: accept the pipeline’s offer or, alternatively, refuse the offer, go to court, and watch legal fees erode any compensation ultimately received. Worse yet, with litigation unlikely, pipelines may submit “low ball” offers, believing that the landowner will not likely want to risk costly litigation. Conversely, if the Supreme Court reverses the Eighth Circuit and holds that attorney fees and costs can be recovered, the number of condemnation cases could increase, as landowners’ eyeing large payouts reject pipeline offers and take their chances in court. This in turn could increase pipeline costs (that are passed on to ratepayers). In short, depending on the Supreme Court rules, pipeline condemnations could become less expensive and quicker or, alternatively, more expensive and take longer. No matter how the Supreme Court rules, Congressional action could (and arguably should) follow. If the Eighth Circuit opinion is affirmed, Congress may be pressured to protect landowner property rights by amending NGA Section 7(h) to provide for the recovery of attorney and fees and costs. Under similar circumstances in 1954, Congress responded to an unpopular Supreme Court opinion on federal regulatory jurisdiction by amending the NGA.76 But even if the Eighth Circuit opinion is reversed, the result would be a geographical crazy quilt of federal common law stitched together from applicable state condemnation statutes, tying recovery of attorney fees in NGA condemnations to the state law in which the property is located, possibly leading to disparate cost recovery by landowners for the same pipeline project, prompting calls for a clear, uniform rule. 1 Click on the hyperlink in the body to access all motions and briefs submitted in the Supreme Court proceeding. 2 NGA § 7(c), 15 U.S.C. § 717(c)(1)(A) (“No natural-gas company … shall … undertake construction of extension of facilities … unless there is in force with respect to such natural gas-company a certificate of public convenience and necessity….). 3 Id. § 2, 15 U.S.C. § 717a (“’Natural-gas company’ means a person engaged in the transportation of natural gas in interstate commerce….; ‘Person’ includes an individual or a corporation.”). 4 PennEast Pipeline Co. v. New Jersey, 594 U.S. 482, 489 (2021). 5 NGA § 7(h), 15 U.S.C. § 717f(h), Pub. Law No. 80-245, 61 Stat. 459 (1947). Section 7(h), in pertinent part, provides: When any holder of a certificate of public convenience and necessity cannot acquire by contract, or is unable to agree with the owner of property to the compensation to be paid for, the necessary right-of-way to construct, operate, and maintain a pipe line or pipe lines for the transportation of natural gas, and the necessary land or other property . . . , it may acquire the same by the exercise of the right of eminent domain in the district court of the United States for the district in which such property may be located, or in the State courts. Id. 6 Tennessee Gas Pipeline Company, LLC v. Permanent Easement for 7.053 Acres, 931 F.3d 237, 243 (3d Cir. 2019). 7 Under FERC’s regulations, once issued a “blanket certificate,” an interstate natural gas pipeline may file a “prior notice” for certificate authorization to construct and operate facilities of limited cost, which, if not protested within 60 days after publication in the Federal Register, is authorized by operation of law. 18 C.F.R. § 157.205. On November 30, 2017, WBI filed a prior notice request to construct and operate certain facilities in McKenzie County, North Dakota; because no protests were filed, certificate authorization for the pipeline project was granted by operation of law. WBI estimated the project cost to be $27.2 million (WBI’s Prior Notice Request, Docket No. CP18-21-000 (Nov. 30, 2017) at 8), including $1,115,153 in pipeline right-of-way costs. WBI’s Supplemental Prior Notice Filing, Docket No. CP18-21-000, Exhibit K (Dec. 7, 2017) (Estimated Cost of Facilities). 8 “Leonard Hoffman was offered roughly half the market rate for gas pipeline access across his pastureland….” Chris Bennett, “Lowballed by Eminent Domain, ND Farmers Appeal Landmark Case to Supreme Court,” AG Web (Sept. 16, 2025) https://www.agweb.com/news/business/farmland/lowballed-eminent-domain-nd-farmers-appeal-landmark-case-supreme-court. 9 The pipeline at issue would run parallel to an existing pipeline on the ranchers’ land, which WBI uses to transport gas from the Wild Basin and Garden Creek processing plants to an interconnection with the pipeline system of Northern Border Pipeline Company. Brief of Respondent, Leonard W. Hoffman v. WBI Energy Transmission, Inc., No. 25-159 (filed Sept. 14, 2026) (“Respondent’s Brief”) at 7; id. (“Despite having earlier reached voluntary agreements for WBI’s immediately parallel pipeline at substantially lower rates, petitioners rejected WBI’s compensation offers.”) (citation omitted). 10 WBI Energy Transmission Inc. v. Easement and Right-of-Way Across, 189.9 rods, more or less, Case No. 1:18-cv-078, slip op. (D.N.D. May 7, 2018) (order adopting stipulation). 11 U.S. Const. amend. V (takings clause). 12 See United States v. 1129.75 Acres of Land, 473 F.2d 996, 998 (8th Cir. 1973) (“When land is taken by eminent domain, and the title acquired is not a fee, but merely an easement, the proper measure of damages is the difference between the market value of the land free of the easement and the market value burdened with the easement.”). 13 WBI Energy Transmission, Inc., v. Easement and Rights-of-Way Across 189.9 rods, more less, Case No. 1:18-cv-078, slip op. at 3 (D. ND, April 1, 2021) (Order Denying Plaintiff’s Motion in Limine to Exclude Evidence of Other Transactions). 14 Id. at 17 (“In this case, it may be appropriate for the fact finder to consider comparable pipeline easement transactions, particularly based on the unique natura of pipeline development in the Bakken oil field development occurring in McKenzie County, North Dakota.”). 15 The legal fees were “based upon a total of 1,295.4 hours, billed at hourly rates ranging from $115 to $350.” WBI Energy Transmission, Inc. v. Easement and Right-of-Way Across 189.9 rods, more or less . . . ., 2024 WL 1477719 (D. ND March 5, 2024). “The expenses include payments for court fees, travel expenses, legal research, and expert witness fees.” Id. 16 Each party and various amici curiae have expended considerable time and money to resolve the slightly more than $150,000 difference between the attorney fees and costs actually incurred ranchers and what WBI considered reasonable, underscoring that from the start this appeal has been about whether attorney fees should be awarded, not whether the ranchers’ attorney fees were reasonable. 17 440 U.S. 715 (1979). 18 WBI Energy Transmission, Inc., 2024 WL 1477719. 19 Tennessee Gas Pipeline, 931 F.3d at 244 (citations omitted); cf. Georgia Power, 617 F.2d at 1118 (“Thus by definition a licensed project does not implicate the interests of the United States to the degree that is thought desirable that the project be undertaken by the United States itself.”). 20 Tennessee Gas Pipeline, 931 F. 3d at 249 (citation omitted). 21 See Tennessee Gas Pipeline Company, LLC v. Permanent Easement for 7,053 Acres, 931 F.3d 237, 245 (3d Cir. 2019). The court explained: “Federal common law refers to the development of legally binding federal rules articulated by a federal court which cannot be easily found on the face of a constitutional or statutory provision.” The need for common lawmaking “stems from the inability of legislators to anticipate every possible contingency and the impracticality of judges[‘] returning all unanswered questions to the legislature.” Id. (citations omitted). The Third Circuit explained that “when Congress has not spoken in an area comprising issues substantially related to an established program of government operation, … the Supreme Court has direct[ed] federal courts to fill the interstices of federal legislation according to their own standards.” Id. (internal quotations and citations omitted). 22 Id. (citation omitted). 23 Id. The Supreme Court in Kimbell Foods was tasked with either crafting a uniform, national rule or, alternatively, utilizing state law, to determine whether contractual liens under federal loan programs take precedence over private liens. After establishing and applying a three-part test, the Court ultimately decided that nondiscriminatory state laws should be utilized. 440 U.S. at 740. The 3rd Circuit in Tennessee Gas Pipeline ruled that Kimbell Foods “and its progeny reflect a presumption in favor of state law, one not rebutted here.” 931 F.3d at 255. 24 The 5th Circuit applied Kimbell Foods first in a condemnation involving the Federal Power Act (Georgia Power Co. v. 138.30 Acres of Land, 617 F.2d 1112 (5th Cir. 1980)) and later in an NGA condemnation. Mississippi River Transmission Corp. v. Goerge S. Tabor, 757 F.2d 662 (5th Cir. 1985). The 6th Circuit (Columbia Gas Transmission Corp. v. Exclusive Natural Gas Storage Easement, 962 F. 2d 1192 (6th Cri. 1992), 3rd Circuit (Tennessee Gas Pipeline Co., 931 F. 3d at 245-46), and 11th Circuit also followed suit. Sabal Trail Transmission, LLC v. 18.27 Acres of Land in Levy County, 59 F.4th 1158 (11th Cir. 2023). The geographic footprint of each of these four circuits include significant oil and gas formations and, therefore, associated pipeline transportation systems: Third Circuit (Marcellus Formation), Fifth Circuit (Eagle Ford, Haynesville, and Permian Formations), Sixth (Devonian, Marcellus, and Utica Formations), and Eleventh Circuit (transmission from Marcellus and Utica Formations). These formations account for approximately 75% of the natural gas produced in the U.S. Ryan Bellafontaine, “Mapped: Where is U.S. Natural Gas Produced?” (Aug. 17, 2026) (Sources: EIA 2026) https://www.visualcapitalist.com/sp/sc02-mapped-where-is-u-s-natural-gas-produced/. 25 WBI Energy Transmission, Inc. v. 189.9 Rods, More or Less, 1332 F.4th 1058, 1060 (8th Cir. 2025). 26 Id. at 1060-61. 27 Id. at 1062. 28 Leonard W. Hoffmann v. WBI Energy Transmission, Inc., petition for cert. filed, No. 25-159 (U.S. Aug. 7, 2025) at 8-11. The petition was a long shot. Each year, the Court reportedly receives more than 7,000 petitions for a writ of certiorari, but only hears oral argument for 100 or less. Nora Collins, “The serious decline in petitions before the Supreme Court,” SCOTUS Blog (May 11, 2026) https://www.scotusblog.com/2026/05/the-serious-decline-in-petitions-before-the-supreme-court/. 29 WBI argued that “this case is a poor vehicle for review of the question presented” because North Dakota does not require, but merely allows the award of attorney fees (Brief in Opposition of WBI Energy Transmission, Inc. No. 25-159 (Oct. 2025) at 2) and urged the Court to wait and see if other courts agree with the 8th Circuit. Id. 30 Brief for the United States as Amici Curiae, No. 25-159 (May 22. 2026) at 2. 31 The ten states on brief included North Dakota, Alabama, Arkansas, Florida, Idaho, Indiana, Louisiana, Nebraska, South Carolina, South Dakota, Tennessee, and Texas. Brief of North Dakota, as Amici Curiae in Support of Petitioners, No. 25-159 (Sept. 8, 2025) at 4 (“just compensation” should be determined under state law because, among other things, the NGA “was not intended to displace traditional state authority for assessing real property value.”). 32 Owners’ Counsel of America as Amici Curiae in Support of Petitioners, No. 25-159 (Sept. 10, 2025) at 8 (presenting a survey showing that property owners in nearly half the states “would be stripped of their guaranteed rights if the Eighth Circuit’s choice-of-law analysis were adopted nationwide.”). 33 Respondent’s Supplemental Brief, No. 25-159 (June 8, 2026) at 1 (agreeing that cert should be granted, but “reserv[ing] the right to argue on remand, should it become relevant, that North Dakota law does not in fact include attorneys’ fees in the state’s measure of just compensation.”); Petitioners’ Supplemental Brief, No. 25-159 (June 5, 2026) at 2 (contrary to the Attorney General’s argument, requiring condemnors to pay for attorney fees would not incentivize landowners to draw out disputes to increase a potential fee award, any more than the status quo encourages condemnors to make unreasonable compensation offers). 34 https://www.supremecourt.gov/qp/25-00159qp.pdf; Sup. Ct. R. 16. (if a petition for certiorari is granted, “[t]he case then will be scheduled for briefing and oral argument.”). 35 The ranchers’ merits brief argues that the Kimbell Foods analysis leads to the same result as the statutory interpretation analysis. Brief of Petitioner, Leonard W. Hoffman v. WBI Energy Transmission, Inc., No. 25-159 (filed August 13, 2026) (“Petitioners’ Brief”) at 37-42. 36 Id. at 13-14 (unlike private parties, the federal government can take property by (1) seizing private property directly, leaving the owners to sue for compensation or (2) invoking the Declaration of Taking Act, where a condemnor takes immediate title to property, leaving compensation litigation for another day). 37 Id. at 14, citing Kirby Forest Indus., Inc. v. U.S., 467 U.S. 1, 3 (1984). 38 Petitioners’ Brief at 14. 39 Id. at 15. 40 Petitioners’ Brief at 15-16, citing Library of Congress v. Shaw, 478 U.S. 310, 317 & n.5 (1986). 41 Petitioner’s Brief at 17, quoting Sackett v. EPA, 598 U.S. 651, 679 (2023). 42 Petitioners’ Brief at 18; see also id. at 24 (arguing that, for nearly two centuries, Congress has known that the Supreme Court routinely interpreted federal claims by applying substantive state law), citing McCluny v. Silliman, 3 Pet. 270, 276, 278 (1830 (applying state limitations period to plaintiff’s rights under federal law). 43 Petitioners’ Brief at 26; see Agency Holding Corp. V. Malley-Duff & Associates, Inc., 483 U.S. 143, 158 (1987) (Scalia concurring). Thus, for example, “congressional silence on the [statute of] limitations issue is ordinarily insufficient to pre-empt state statutes….” Agency Holding Corp., 483 U.S. at 162. 44 See NGA § 7(h), 15 U.S.C. § 717f(h) (“the United States district courts shall only have jurisdiction of cases when the amount claimed by the owner of the property to be condemned exceeds $3,000.”). 45 Petitioners’ Brief at 29. 46 Id. at 32. 47 Six amicus briefs supporting the ranchers were filed on August 13, 2026 in Leonard W. Hoffman v. WBI Energy Transmission, Inc., No. 25-159: Brief of Florida Property Owners Ryan Thomas, Lee Thomas Trust, and Sunderman Groves, Inc. (“Florida Property Owners Brief”); Brief of Gary R. Erb and Lynda Like (“Pennsylvania Property Owners’ Brief”); Brief of Owners Counsel of America (“Owners Counsel Brief”); Brief of Landowner Groups, (“Landowner Groups’ Brief”); Brief of Pacific Legal Foundation (“PLF Brief”); Brief of National Association of Realtors, American Farm Bureau Federation, and Realtors Land Institute (“Realtors Brief”). 48 The Florida property owners report that ten years ago Sabal Trail Transmission, LLC (“Sabal Trail”) filed 263 condemnation cases in federal courts for a 247-mile corridor to construct a 36-inch pipeline to transport 1 Bcf/day. Florida Property Owners Brief at 13-14. In August 2026, the Florida property owners received notice that Sabal Trail is evaluating expansion pipeline project running near or along the current route for 482 miles, (id. at 14) increasing the stakes at issue in Hoffmann. 49 Id. at 8-9 (“Federal actors are ultimately accountable to federal officials, sworn to uphold the Constitution, charged with promoting the public good, and held accountable by the voters on Election Day. * * * And, in direct federal condemnations, the federal government retains a continued ownership interest in the property taken . . . .”); see Pennsylvania Property Owners’ Brief” at 2 (while NGA § 7(h) delegates the power to condemn, “it does not transfer every rule or governmental protection that accompanies condemnation by the United States.”); id. at 7, citing U.S. v. Carmack, 329 U.S. 230, 243, n.13 (1946) (distinguishing federal officers acting for the sovereign from private entities authorized to condemn “on behalf of themselves”, whose grants “are, in their very natural grants and of limited powers” that “do not include sovereign powers greater than those expressed or necessarily implied.”). 50 Florida Property Owners’ Brief at 4; id. at 5 (for private licensee companies exercising eminent domain rights under the NGA, “the Fifth Amendment’s measure of compensation should serve as a floor and not a ceiling” -- to do otherwise, “state created rights to attorneys’ fees will be stricken in six of the seven states of the Eighth Circuit, and will be at serious risk in at least 15 other states if the Eighth Circuit’s new-fashioned split widens.”). 51 Owners Counsel Brief at 2 (internal citations omitted). “In the Sabal Trail pipeline litigation, condemnors spent a combined $8.3 million on appraisal work alone across the project.” Id. at 6 (citation omitted); see also Landowner Groups’ Brief at 5 (“The Eighth Circuit’s decision threatens to alter that bargaining framework well before any condemnation proceedings begin. If a company exercising eminent domain … may disregard state compensation protections and pay only the federal constitutional minimum, its fallback position becomes less costly, changing the baseline against which voluntary easement negotiations occur.”). 52 Owners Counsel Brief at 10-17 (list of 21 state statutes providing condemnation protection); see PLF Brief at 4 (distinguishing cases relied on by the 8th Circuit); see also Realtors Brief at 5 (cautioning that the 8th Circuit’s reasoning could incentivize “advocates for more public control of private interests….”) (citation omitted). 53 Respondent’s Brief” at 2, quoting PennEast, 594 U.S. at 495; see Respondent’s Brief at 2, quoting Luxton v. North River Bridge Co., 153 U.S. 525, 530 (1894) (Congress “may at its discretion, use its sovereign powers, directly or through a corporation * * * for the accommodation of interstate commerce.”). 54 Respondent’s Brief at 4. 55 Id. at 2, United States v. Miller, 317 U.S. 369, 374 (1943) (“[T]he courts early adopted, and have retained the concept of fair market value” as the appropriate compensation); United States v. New River Collieries Co., 262 U.S. 341 344 (1923) (“More would be unjust to the United States, and less would deny the owner what he is entitled to.”). 56 United States ex rel. Tennessee Valley Auth. v. Powelson, 391 U.S. 266 (1943). 57 319 U.S. at 281-82. 58 Respondent’s Brief at 2, quoting 33 U.S.C. § 532. 59 Respondent’s Brief at 28 (citation omitted). 60 Brief for the United States, Leonard W. Hoffman v. WBI Energy Transmission, Inc., No. 25-159 (filed Sept. 21, 2026) at 12 (citations omitted). The Attorney General also noted that the Supreme Court had recently ruled that eminent domain power delegated to a certificate holder is “categorical,” that is, absolute and unconditional. Id. at 10, citing PennEast Pipeline Co., 594 U.S. at 498. 61 Brief of the Interstate Natural Gas Association of America and American Petroleum Institute, Leonard W. Hoffman v. WBI Energy Transmission, Inc., No. 25-159 (filed Sept. 21, 2026) at 11. “INGAA” is the natural gas pipeline trade association, while “API” represents all aspects of the oil and gas industry. Id. at 1. 62 Brief of the Chamber of Commerce of the US, Leonard W. Hoffman v. WBI Energy Transmission, Inc., No. 25-159 (filed Sept. 21, 2026) at 4-6. 63 Id. at 9. 64 Bradley C. Karkkainen, “Plain Meaning”: Justice Scalia’s Jurisprudence of Strict Statutory Construction,” 17 Harv. J.L. & Pub. Pol’y 401 (1994). 65 597 U.S. 215 (2022). 66 410 U.S. 113 (1973). 67 Id. at 231. 68 See id. at n.9 (strict construction “refers to a construction that narrows the scope of coverage or application of a statute….”). 69 See West Virginia v. EPA, 597 U.S. 697, 723 (2022) (“We presume that ‘Congress intends to make major policy decisions itself, ….”) (citation omitted). In applying the “major question doctrine,” the Court explained: “The question there [American Elec. Power. Co. v. Connecticut, 564 U.S. 131 (2011)] however, was whether Congress wanted district court judges to decide, under unwritten federal nuisance law, ‘whether and how to regulate carbon dioxide emissions from powerplants. We answered no….”’ 597 U.S. at 731. Another reason supports the efficacy of WBI’s argument: the Roberts Court has been labeled “business friendly,” with business winning on average 71% of the cases before the Supreme Court from 2010-20. Lee Epstein and Mitu Gulati, “A Century of Business in the Supreme Court, 1920-2020,” 107 Minn. L. Rev. 49, 59 & n.36-37 (2022). 70 148 U.S. 312 (1893). 71 Id. at 325. The Court concluded that if the government condemns a series of locks and dams built by a company to make a river navigable, whose passage is compensated with tolls, it must compensate a company not just for the value of the tangible property, but also for the franchise to take tolls. Id. at 344-45. 72 405 U.S. 538 (1972). 73 Id. at 552. After lower courts allowed a credit union to seize a woman’s savings account (without notice) for failure to repay a loan, the Court remanded and explained: “The right to enjoy property without unlawful deprivation, no less than the right to speak or the right to travel, is in truth a ‘personal’ right ….” Id. (emphasis added). 74 598 U.S. 631 (2023) (J. Gorsuch and J. Jackson concurring). 75 After Hennepin County sold her condominium $40,000 to satisfy a $15,000 tax bill and kept the surplus, a 94-year-old woman filed claims (under the takings clause of the Fifth Amendment and Excessive Fines Clause of the 8th Amendment) against the county, which the trial court dismissed for failure to state a claim, and the 8th Circuit affirmed. 598 U.S. at 635-36. In a companion case, Sackett v. EPA, 598 U.S. 651 (2023), landowners wanting to build a house used sand and gravel to fill in a lot next to a ditch, but the Environmental Protection Agency (“EPA”) considered their land protected wetlands under the Clean Water Act, told the landowners that they could not build, directed them to remove the sand and gravel or face $40,000/day fines. Id. at 662. The Supreme Court reversed the underlying opinion siding with the EPA and limited the scope of the “waters of the United States,” allowing the landowners to build their house. Id. at 684. 76 NGA § 1(c), P.L. 83-323, 68 Stat. 36 (1954) (exempting from federal regulation natural gas companies operating entirely within a single state, effectively overturning FPC v. East Ohio Gas Co., 338 U.S. 464 (1950) that had ruled an otherwise local, in-state gas company was subject to federal regulation because it crossed state lines to receive gas).

Client Alert

Supreme Court to Reconsider the Chevron Doctrine: Does the Bell Toll for Judicial Deference to Administrative Agencies?

October 16, 2023

Early next year, the Supreme Court will hear oral arguments in a pair of cases, which could overrule the Chevron doctrine and thereby end nearly forty years of judicial deference to federal administrative agencies’ interpretations of statutes they administer. While the cases involve regulatory compliance costs imposed on Atlantic herring fishermen, the Court’s decision will have broad and significant consequences, including the outcome of a pending appeal involving the extent to which an electric utility is obligated to purchase all the output from a renewable energy generator. Without Specific Statutory Authorization, Agency Tells Fishermen to Pay for Monitors Congress enacted the Magnuson-Stevens Fishery Conservation and Management Act to conserve coastal fishery resources, but also to promote commercial and recreational fishing.[1] The Secretary of Commerce, in particular her designee the National Marine Fisheries Service, promulgates regulations that implement the Act. The Service issued a rule outlining how and when New England herring fishing vessels must carry and pay for an on-board monitor, a cost which the Service recognizes will reduce fishing vessel profits by approximately 20%.[2] Several fishermen objected and sought judicial review: one group filed suit in Washington, DC, the other in Rhode Island. In each case, the fishermen argued that the Service exceeded its authority, because the Act contains no language authorizing the Service to force fishermen to pay for the salaries of monitors. Neither case made it to trial: each court granted the Service’s motion for summary judgment, after invoking the Chevron doctrine and determining that the Act’s authorization of the Service to act as “necessary and appropriate” was sufficient to withstand the fishermen’s claims.[3] The fishermen appealed to the DC Circuit and First Circuit, where they lost again. Citing Chevron, a split DC Circuit panel explained: “When Congress has not ‘directly spoken to the precise question at issue,’ the agency may fill this gap with a reasonable interpretation of the statutory text.”[4] The DC Circuit also noted: “When an agency establishes regulatory requirements, regulated parties generally bear the costs of complying with them.”[5] The First Circuit echoed the DC Circuit’s analysis, then concluded: “we have no trouble finding that the Agency’s interpretation of its authority to require at-sea monitors who are paid for by owners of regulated vessels does not ‘exceed[] the bounds of the permissible.'"[6]  Each group of fishermen filed a petition for a writ of certiorari, presenting multiple issues on appeal. The Supreme Court granted each petition, but only to address one issue: “Whether the Court should overrule Chevron or at least clarify that statutory silence concerning controversial power expressly but narrowly granted elsewhere in the statute does not constitute an ambiguity requiring deference to the agency.”[7] Oral arguments on the cases – Loper Bright Enterprises v. Raimondo (Secretary of Commerce) and Relentless, Inc. v. Department of Commerce – will be held in tandem in the January 2024 argument session. Chevron Doctrine In Chevron, U.S.A., Inc. v. Natural Resources Defense Council, Inc.,[8] the Supreme Court established a two-step process to determine if a court should defer to a federal agency decision:       1.  If the statute is clear (on its face or by using interpretive tools, e.g., rules of statutory construction), the court must give effect to the unambiguous, stated intent of Congress. 2.  If the statute is silent or ambiguous, an agency’s reasonable interpretation of the statue is entitled to deference. The doctrine is limited. Although deference can be afforded to a federal agency’s formal “notice and comment” rulemaking proceeding under the Administrative Procedures Act, non-binding agency guidance, such as policy statements, are not entitled to deference.[9] Likewise, the Supreme Court has never “deferred to an agency’s conclusion that state law is preempted.”[10]  Significantly, last year the Supreme Court in West Virginia v. EPA did not defer to the Environmental Protection Agency’s reading of the Clean Air Act, but rather struck down EPA’s Clean Power Plan by invoking the major questions doctrine.[11] The antithesis of deference, the major questions doctrine requires a federal agency to show “clear congressional authorization”[12] when claiming the power to make decisions of vast “economic and political significance.”[13] Notwithstanding the above, application of the Chevron doctrine often results in a court’s upholding a federal agency’s action, which in turn deters legal challenges to administrative orders. Pros and Cons Supreme Court Justice John Paul Stevens, who wrote the Chevron opinion, gave three reasons for establishing the doctrine. One, by not specifically addressing an issue, Congress implicitly vests an agency with a limited delegation to act (reasonably). Two, agencies (rather than courts) have greater institutional competence and expertise in an esoteric subject matter. Three, the executive branch of government, not the judicial branch, should make policy choices.[14] Justice Elena Kagan has expressed her support for the doctrine this way: “Members of Congress often don’t know enough— and know they don’t know enough—to regulate sensibly on an issue. Of course, Members can and do provide overall direction. But then they rely . . . on people with greater expertise and experience. Those people are found in agencies.”[15] However, Justice Neil Gorsuch contends that the doctrine is unfair: “[O]ur courts have long and often understood that, ‘as between the government and the individual, the benefit of the doubt’ about the meaning of an ambiguous law must be ‘given to the individual, not to authority….'" [16] Yet, he claims that the Chevron doctrine has the opposite effect: “We place a finger on the scales of justice in favor of the most powerful of litigants, the federal government, and against everyone else.”[17] He therefore concludes: “At this late hour, the whole project deserves a tombstone no one can miss.”[18] Justice Clarence Thomas also opposes the doctrine: it forces judges “to abandon what they believe is ‘the best reading of an ambiguous statute’ in favor of an agency's construction. It thus wrests from Courts the ultimate interpretative authority to ‘say what the law is,’ and hands it over to the Executive.”[19] Context The 1984 Chevron opinion was unanimous, but with only six justices participating: Justices Marshall, Rehnquist, and O’Connor did not participate. Before October 13, only eight justices were scheduled to participate in the Loper Bright decision: Justice Ketanji Brown Jackson was recused, because she was on the DC Circuit panel that heard arguments in Loper Bright. However, granting certiorari to Relentless allows all nine justices (including Justice Brown Jackson) to help decide the fate of Chevron. The Chevron doctrine was established in a case upholding a regulation promulgated by the Reagan administration’s EPA. The EPA administrator during the rulemaking was Ann Gorsuch. Her son, Supreme Court Justice Neil Gorsuch, is ardently opposed to the doctrine. The herring fishermen have already beaten the odds by the Supreme Court’s deciding to hear their cases. Absent a few instances where parties have a right to appeal to the Supreme Court (not applicable here), an aggrieved party seeking the Supreme Court to review a lower court decision must file a petition for a writ of certiorari. “Writ” means a written command, while “certiorari” is Latin for “to be more fully informed.” By filing a request for a writ of certiorari, a petitioner asks the Court to order a lower court to send up the record of the case for review. The Supreme Court is not obligated to grant the requested review, but rather carefully chooses cases that might have national significance or harmonize conflicting circuit court decisions. If four of the nine Justices agree, the Court grants the request. Each year, the Supreme Court reportedly receives about 7,000 petitions for a writ of certiorari, but only hears oral argument for 100. Implications As noted above, the Supreme Court granted the fishermen’s writs of certiorari to determine whether to overrule or curtail Chevron. More and more the Court has been using the doctrine less and less, but trial and appellate courts still regularly apply the doctrine. Overruling Chevron would lift “the finger on the scales of justice ... in favor… of the federal government” and, thereby, arguably reduce the number of federal agency victories involving legal challenges to agency regulations and spur litigation objecting to the terms of administrative oversight. This could have a deleterious effect on aspects of the Biden administration’s “whole-of-government” approach to combatting climate change, such as the Securities and Exchange Commission’s proposal to require registered companies to include climate-related information in registration statements and periodic reports. On the other hand, the practical effect of the Court’s simply pruning the Chevron doctrine is unclear. Utilities’ Obligation to Purchase Green Energy from Small Generators This summer, the Edison Electric Institute (an electric utility trade association) and NorthWestern Energy (an electric utility in Montana) filed a petition for writ of certiorari regarding the Federal Energy Regulatory Commission’s interpretation of the Public Utility Regulatory Policies Act of 1978 (“PURPA”). PURPA requires electric utilities to purchase all the output of small power production “qualifying facilities” or QFs, which are defined by statute and regulation as renewable fuel generators with a “power production capacity” not greater than 80 MW. At issue is whether an integrated 160 MW solar project and 50 MW battery storage system qualifies as a QF, requiring NorthWestern to purchase all the QF’s energy output. FERC initially found that the solar project was not a QF because it could produce more than 80 MW.[20] On rehearing, FERC reversed course, explaining that the 80 MW limit does not apply to the amount of power a generator could produce, but rather how much could be delivered.[21] FERC reasoned that the solar developer was a QF because it intends to limit energy delivery to 80 MW: the solar array would generate direct current power, but inverters (which change the DC power from the array and the battery into alternating current power before delivery) would be designed to limit the amount of power that can be delivered to 80 MW. On appeal, the DC Circuit applied Chevron and by a two-to-one vote deferred to FERC.[22] EEI and NorthWestern argue that the DC Circuit majority opinion misapplied Chevron, by finding that PURPA is ambiguous (because the statute does not define “power production capacity”) without performing the full Chevron “step one” analysis. The petitioners ask the Supreme Court to grant certiorari or, alternatively, delay deciding until the fate of Chevron is determined. FERC agrees. Ultimately, if Chevron is upheld, so too will FERC’s QF order.  But, if the doctrine is overruled, the Supreme Court would likely remand the proceeding to the DC Circuit to determine (without agency deference) whether FERC reasonably interpreted PURPA. [1] 16 U.S.C. § 1801(b)(1) & (3). Congress also found and declared: “Commercial and recreational fishing constitutes a major source of employment and contributes significantly to the economy of the Nation.” Id. § 1801(a)(3). [2] Loper Bright Enterprises, Inc. v. Raimondo, 544 F. Supp.3d 82, 97 (D. DC 2021). [3] Id. at 104; Relentless, Inc., v. U.S. Dep’t of Commerce, 561 F.Supp.3d 226, 244 (D. R.I. 2021). [4] Loper Bright Enterprises, Inc. v. Raimondo, 45 F.4th 359, 365 (D.C. Cir. 2022), citing Chevron, 467 U.S. at 842; but see 45 F.4th at 373 (J. Walker dissenting) (“I would reverse the judgment of the district court because the Magnuson-Stevens Act unambiguously does not authorize the Fisheries Service to force the fishermen to pay the wages of federally mandated monitors”); id. (“Agencies are creatures of Congress, so they have no authority apart from what Congress bestows.”) (footnote omitted). [5] Loper Bright, 45 F.4th at 366. [6] Relentless, Inc. v. U.S. Dep’t of Commerce, 62 F.4th 621, 633-34 (1st Cir. March 16, 2023). [7] Loper Bright’s Petition for Writ of Certiorari, No. 22-451 (filed Nov. 10, 2022); Supreme Court’s Order (May 1, 2023); see Relentless’ Petition for Writ of Certiorari, No. 22-1219 (filed June 4, 2023); Supreme Court’s Order (October 13, 2023).    [8] 476 U.S. 355 (1984). [9] Christensen v. Harris County, 529 U.S. 576, 587 (2000). [10] Wyeth v. Levine, 555 U.S. 555, 576 (2009) (emphasis in original). [11] 142 S. Ct. 2587 (2022). [12] Utility Air Regulatory Group v. EPA, 573 U.S. 302, 324 (2014). [13] FDA v. Brown & Williamson Tobacco Corp., 529 U.S. 120, 160 (2000). [14] Chevron, 476 U.S. at 864-65. [15] West Virginia v. EPA, 142 S. Ct. at 2642 (J. Kagan dissenting). [16] Buffington v. McDonough, No. 21-972, slip op. at 10 (Nov. 7, 2022) (J. Gorsuch dissenting to denial of writ of certiorari) (citation omitted). [17] Id. at 9. [18] Id. at 16. [19] Michigan v. EPA, 576 U.S. 743, 761 (2015) (J. Thomas concurring) (citations omitted). [20] Broadview Solar, LLC, 172 FERC ¶ 61,194, P 25 (2020). [21] Broadview Solar, LLC, 174 FERC ¶ 61,199, P 40 (2021); but see id. Commissioner Danly dissent at P 4 (The Broadview facility “is 75.5 MW above the statutory maximum allowable power production capacity for a QF. The Facility does not meet the statutory requirement to be a QF.”).     [22] Solar Energy Industries Association v. FERC, 59. F. 4th 1287, 1291-94 (D. C. Cir. 2023); but see id. at 1299 (J. Walker dissenting) (“Applying   the   normal   tools   of   statutory   interpretation, Broadview is not a “small facility” under the Public Utility Act because its “power production capacity” is greater than 80 megawatts.”).

Legal Writings

Washington Watch, a bi-monthly column in North American Oil and Gas Pipelines

Steven A. Weiler and Marcia A. Stanford, New York’s Denial of Water Quality Certification for Three FERC-Authorized Pipelines: Flagrant Fiat or Valid Veto?, 39 Energy Law Journal 503 (2018)

Firm Highlights

Insights

Minnesota Consumer-Fraud Enforcement: Disclaimers Won’t Cure Deception, and Penalties Can Add Up

Misleading advertising claims can lead to costly consequences. In State of Minnesota ex rel. Ellison v. Wall & Associates, Inc., No. A25-2064, 2026 WL 3118291 (Minn. App. Oct. 19, 2026), the Minnesota Court of Appeals recently affirmed a bench trial verdict against a tax-relief company and two executives for violations of the Minnesota Consumer Fraud Act (“MCFA”) and the Minnesota Deceptive Trade Practices Act (“MDTPA”). The decision, which affirmed a substantial restitution and civil penalty judgment, underscores the broad power of the Minnesota Attorney General to act against deceptive sales practices. The decision also offers practical lessons for businesses seeking to reduce liability risks in consumer-facing communications. Background Wall & Associates (“W&A”), a Virginia-based tax-relief company, marketed assistance to taxpayers seeking relief from outstanding federal and state tax liabilities, often with offers in compromise—agreements to settle tax liabilities for less than the amount owed. In its extensive advertising campaigns, W&A represented that its average client received a 90% reduction in their tax debt, that it was a local company with Minnesota offices, that it provided legal services, and that it would “Solve ALL Tax Problems.” In reality, W&A’s promises bore little resemblance to what many clients received. Most of W&A’s clients saw just a 9.5% reduction in federal tax debt and 1.2% in state tax debt. W&A had no permanent Minnesota offices. And W&A provided neither legal representation nor assistance with filing tax returns—those services required referrals to separate firms for an additional fee. All the while, W&A clients paid upfront and recurring fees, including during periods when W&A did no work on their cases. Minnesota Attorney General Keith Ellison sued W&A, its founder and owner Ernest Kenneth Wall, and its president and CEO Patrick Mark Yates, alleging violations of, among other laws, the MCFA and the MDTPA. Following a 12-day bench trial, the district court determined that W&A violated the MCFA and MDTPA through its false and embellished advertising. The district court also held Wall and Yates individually liable for those violations because they directed, participated in, and acquiesced in the violations. The district court ordered injunctive relief, $2.7 million in restitution (with Wall and Yates jointly and severally liable for $1.3 million), and civil penalties of $786,517 against W&A, $415,500 against Wall, and $207,750 against Yates. The district court also awarded over $2.5 million in attorneys’ fees and costs to the state. W&A, Wall, and Yates appealed to the Minnesota Court of Appeals, which affirmed the district court’s decision on October 19, 2026. Although W&A, Wall, and Yates challenged the judgment on numerous grounds, several highlights of the decision provide important takeaways for consumer-facing businesses. Individual Reliance Is Not Required for Statutory Liability W&A argued that Attorney General Ellison had to prove a causal nexus between each violation of the MCFA and MDTPA and the injury to a particular consumer to establish liability. In W&A’s view, this required proof that each injured consumer had personally relied on W&A’s false representation. The Court of Appeals rejected this argument based on the MCFA’s and MDTPA’s plain language, which requires no proof of actual deception or confusion by consumers. The Court of Appeals finally pointed to the Minnesota Supreme Court’s decision in State v. Minnesota School of Business, Inc., which held that when a defendant’s misrepresentations are directed at and affected “a broad group of consumers, proof of direct individual reliance is not required to establish a causal nexus between MCFA violations and the harm suffered by consumers.” 935 N.W.2d 124, 135 (Minn. 2019). The Court of Appeals affirmed, however, that a causal nexus is necessary to support an award of damages under the MCFA and MDTPA. In making that determination, district courts look to various factors, including whether the misrepresentations were “longstanding, pervasive, and widespread in communications directed to consumers,” whether the seller intended and understood that consumers would rely on the misrepresentations, and whether the information was of a kind on which consumers would typically rely. The Court of Appeals’ decision continues Minnesota School of Business’s broad interpretation of liability under the MCFA and the MDTPA. Coordinated marketing campaigns to a “broad group of consumers” may expose businesses to MCFA and MDTPA liability without customer-by-customer proof of injury. That said, a causal nexus remains an element of an MCFA and MDTPA claim, and businesses involved in litigation should build a clear record at trial and on appeal showing how each of the relevant factors bears on the causal-nexus inquiry. Contractual Disclaimers Are Not an Automatic Defense to a Misleading Pitch W&A next argued that disclaimers in its client contracts prevented consumers from claiming they had been misled by its advertising. Reiterating that individual reliance is not required under the MCFA and MDTPA, the Court of Appeals held that a contractual disclaimer does not necessarily defeat a claim based on a conflicting oral representation. And on the facts of this case, the Court of Appeals agreed with the district court that W&A’s contractual disclaimers were insufficient given the extensive misrepresentations by W&A and the unequal bargaining power between it and its customers. This holding confirms that contractual disclaimers are not a cure-all for misleading advertising or sales practices. Businesses should review the entire customer journey, including pre-contract representations, as those representations may survive a contractual disclaimer to the contrary. And if faced with litigation, businesses should build a strong record, both at trial and on appeal, showing why any disclaimer is effective in context. The State Has Broad Authority to Seek Restitution W&A also challenged Attorney General Ellison’s authority to seek restitution under the state’s parens patriae authority to protect residents’ collective interests, arguing that injury to only 228 Minnesotans did not affect a sufficiently substantial segment of the population. The Court of Appeals rejected a simple headcount approach, instead explaining that the state had a legitimate interest in protecting residents’ economic well-being as a whole. In any event, the Court of Appeals held that if restitution was not appropriate under the state’s parens patriae authority, then it would still be appropriate under the Attorney General’s enforcement powers under Minn. Stat. § 8.31. The decision reinforces that the broader and more sustained the deceptive advertising, the stronger the case for restitution to protect Minnesotans’ economic interests. Civil Penalties Accrue Per Violation, Not Per Defendant The Court of Appeals finally rejected W&A’s claim that the Attorney General’s enforcement powers under Minn. Stat. § 8.31 permit only civil penalties of up to $25,000 for each defendant. Rather, the Court of Appeals explained that penalties are limited to $25,000 per violation. Multiple violations can therefore produce substantially greater penalties. The Court of Appeals also rejected the argument that restitution made penalties unnecessary: repaying consumers does not eliminate the need to address gains from deceptive conduct and deter future violations. Final Takeaways Align every consumer-facing communication. Broad and extensive marketing campaigns can expose businesses to stronger enforcement standards under the MCFA and MDTPA, making it critical that consumer communications remain accurate and consistent from the first advertisement through the final sale. Plan for layered enforcement exposure. Penalties under the MCFA and MDTPA can add up quickly: W&A, Wall, and Yates ultimately faced more than $6 million in civil penalties, restitution, and attorneys’ fees. The decision continues a line of Minnesota cases recognizing the Attorney General’s broad consumer-protection authority. Details matter. Although the Attorney General’s enforcement power is broad, it is not boundless. As the Court of Appeals explained, issues of causation, the effectiveness of contractual disclaimers, and the availability of restitution and civil penalties all turn on the specific facts of the case. Effective advocacy at trial and on appeal is critical to developing the facts relevant to liability and damages.

Insights

Observations on the SEC’s 2027 Examination Priorities

The SEC’s Division of Examinations (the “Division”) recently announced its examination priorities (“Exam Priorities”) for fiscal year 2027.1 Although many of the Division’s core areas of focus remain consistent with fiscal year 2026, the 2027 Exam Priorities include notable changes and refinements, which we discuss below, along with other key 2027 examination priorities. Dorsey Observations Renewed focus on economic conflicts of interest. After certain economic-incentive topics received less emphasis in the 2026 Exam Priorities2, the Division has again expressly identified economic conflicts as an examination focus. The 2027 Exam Priorities indicate that the Division will prioritize reviewing advisers’ fiduciary obligations relating to economic conflicts of interest raised by fee rebates, fee and expense calculations, cash management, quid pro quo arrangements, and deposits and withdrawals. Greater emphasis on private-fund practices. Building on the private-fund items in the 2026 Exam Priorities, the 2027 Exam Priorities indicate that the Division will assess private-fund disclosures and controls relating to investment allocations, leverage, affiliated service providers, and fees and expenses. The Division also identified investments in private companies through special purpose vehicles (“SPVs”) and loans provided by private funds and business development companies (“BDCs”) as products the Division will scrutinize. Advisers, particularly private-fund advisers, should evaluate whether their disclosures and compliance programs address these areas. Expanded focus on AI-related cybersecurity risks. While the 2026 Exam Priorities focused on advisers’ use of and representations regarding artificial intelligence (“AI”), the 2027 Exam Priorities specifically highlight AI-enabled cybersecurity threats, including AI-generated phishing and synthetic or “deepfake” voice and video used for social engineering. The shift signals that registrants should consider whether their cybersecurity policies and controls adequately address these evolving threats. New focus on proxy advisory firms. The 2027 Exam Priorities state that the Division will examine advisers that rely on proxy advisory firms, including how those advisers evaluate the firms’ recommendations, assess the bases for those recommendations, identify potential conflicts of interest, and determine whether that reliance satisfies applicable legal obligations. Advisers that rely on proxy advisory firms may wish to consider whether their compliance programs address these areas. Updated focus on Regulation S-P and Regulation S-ID. The 2026 Exam Priorities stated that the Division would engage firms during examinations regarding their progress in preparing incident response programs ahead of the compliance dates for the amendments to Regulation S-P and would examine compliance with the amended rule after those dates. The 2027 Exam Priorities indicate that examinations will focus on whether firms have developed, implemented, and maintained reasonably designed policies and procedures addressing administrative, technical, and physical safeguards to protect customer information and that, in accordance with the amended rule, staff will evaluate response program policies and procedures for unauthorized access to or use of customer information, including customer notification procedures and oversight of service providers. With respect to Regulation S-ID, the 2027 Exam Priorities indicate that examiners will assess whether firms are updating their Identity Theft Prevention Program to address emerging risks, such as those related to AI and stolen credentials. Advisers may wish to consider whether their compliance programs address these areas, as applicable. Summary of Other 2027 Examination Priorities Beyond the developments discussed above, many of the Division’s core examination priorities remain consistent with fiscal year 2026. These include investment adviser fiduciary obligations and compliance programs, examinations of never-examined and recently registered advisers, and cybersecurity and operational resiliency. The Exam Priorities are not exhaustive, and examinations will vary based on each registrant’s business, activities and risks. Advisers should consider the 2027 Exam Priorities in reviewing their compliance programs and preparing for potential examinations, including by: Reviewing risk disclosures and controls. The Division states that, when examining advisers to private funds, it will assess whether investment-related risk disclosures are consistent with fiduciary standards and whether compliance policies, procedures, and controls are designed to address both fund-level and investment-level risks. Reviewing disclosures on allocations, leverage, and affiliated service providers. The 2027 Exam Priorities identify disclosures related to certain investments and allocations, the use of debt and fund-level lines of credit, and the use of affiliated service providers as examples. Confirming the accuracy of fee and expense calculations. The Division states that it will assess the accuracy of fee and expense calculations at both the fund and investment levels, and it identifies fee rebates, cash management, quid pro quo arrangements, deposits, and withdrawals as areas in which economic conflicts of interest may affect the impartiality of advice. Reviewing recommendations of illiquid or hard-to-trade products. The Division states that it will prioritize advisers that recommend products that are difficult to trade, have unusual features, or are illiquid, including loans provided by private funds or BDCs and investments in private companies through SPVs. Confirming that the compliance program is implemented and reviewed. The Division states that it will review compliance program components such as marketing, valuation, and custody, as appropriate, and will typically analyze the annual compliance review. It will also focus on compliance practices when advisers have started advising new asset classes or clients or grown through mergers or acquisitions. 1 SEC Division of Examinations 2027 Examination Priorities. 2 See Dorsey’s Client Alert on the SEC’s fiscal year 2026 exam priorities.

Event/Resource

Corporate Counsel Symposium 2026 Materials Hub

Materials Symposium Agenda Sessions 8:30 am - 9:30 am CT Session A: The Corporate Compass: Finding True North When Ethical Duties Conflict Philip Kaplan, Senior Legal Counsel, Howden Re Lucia Suljic, Vice President, Corporate Legal, Canon USA Nicole Stanton, Partner & Deputy General Counsel, Dorsey & Whitney LLP This panel addresses ethical obligations of in-house counsel, including balancing obligations and duties that may conflict with each other. How should a responsible in-house lawyer deal with those challenging situations? Rather than stick to an academic discussion, this panel will revolve around a series of practical scenarios that are designed to be realistic and timely, including situations where counsel is asked to represent both the company and an individual, how and when to disclose uncomfortable facts and inconvenient documents, issues involving changing firms and companies, and multijurisdictional practice. The panel will feature discussion from two experienced in-house lawyers and Dorsey’s Deputy General Counsel. Session B: Managing Rapid Regulatory Change in International Trade and Cross-Border Investment Nathan Brower, Executive Vice President, General Counsel, Nature’s Sunshine Greg Ogunsanya, Senior Vice President, General Counsel and Corporate Secretary, H.B. Fuller Kathryn Wood, Senior Vice President & General Counsel, DecoPac, Inc. Dave Townsend and Lawrence Ward, Dorsey & Whitney LLP This program is designed for attorneys advising on cross-border transactions, international trade, regulatory compliance, and corporate governance matters. Panelists will examine recent developments in U.S. trade and investment law and policy, as well as their impact on international collaborations, corporate compliance, and mergers and acquisitions. The discussion will explore how general counsel and in-house legal teams assess and manage evolving trade-related risks within their organizations. Particular focus will be given to developments during the first two years of the second Trump Administration, including changes in tariff policy, tariff refunds, export controls, economic sanctions, and national security reviews of foreign investment. Through a discussion of regulatory trends and practical case studies, attendees will gain a deeper understanding of the legal risks and compliance obligations associated with cross-border business activities, and hear about practical strategies for advising clients and managing compliance obligations in a rapidly changing trade and investment environment. 9:45 am - 10:45 am CT Session A: The Elon Musk Cases: What Tesla and Twitter Can Teach Your Board of Directors Loren Unterseher, Managing Partner, Oxbow Industries, LLC Shulamite White, Chief Legal Officer and Head of People, Motive Technologies Kirsten Schubert, Tom Swigert, and Jonathan Van Horn, Dorsey & Whitney LLP Recent cases involving Elon Musk and his businesses have had significant impact on principles governing board of directors’ fiduciary duties and corporate processes. This panel will examine recent litigation involving Elon Musk, Tesla, and Twitter, and its effects on the law governing the duties of directors and executives, including the executive compensation and director compensation processes, conflicts that may arise when a single executive has control over multiple businesses, and the ramifications of tweets or other public statements by an executive. Session B: All Eyes on DEI: Managing Diversity Efforts Amid Regulatory Scrutiny and Potential Litigation Maggie Dalton, Senior Commercial Attorney, Cargill; Board Co-Chair, Twin Cities Diversity in Practice Laura A. Vannelli, Legal Counsel, Mayo Clinic Susan Lorenc and Jack Sullivan, Dorsey & Whitney LLP The legal and regulatory landscape surrounding diversity, equity, and inclusion (DEI) initiatives has changed dramatically over the past two years. Law firms and legal departments are continuing to grapple with how to recruit, retain, and develop talent from a wide range of personal backgrounds, in a world where previously accepted recruiting and employment practices are facing increased scrutiny and litigation. This program will provide a practical overview of the current legal regime, including recent federal enforcement actions and litigation trends associated with DEI initiatives. Panelists will discuss practical ways in which organizations can pursue and retain legal talent and increase inclusion while minimizing legal, business, and reputational risk. 11:00 am - 12:00 pm CT Session A: Governance in an Age of Increasing Unpredictability James Chosy, Senior Executive Vice President and General Counsel, U.S. Bancorp Todd Hartman, Executive Vice President and Chief Legal and Risk Officer, Best Buy Co., Inc. Alan Rosselot, Associate General Counsel & Assistant Secretary, Delta Air Lines, Inc. Cam Hoang and Robert Rosenbaum, Dorsey & Whitney LLP More than ever, ensuring that boards are well-informed and forward-thinking is critical to a company’s success. Join our panel of corporate governance experts as they share their experiences advising boards through crisis and unpredictable events; capitalizing on, but also checking, disruptive technologies; and positioning the company to succeed in an environment of shifting government priorities. Session B: A Day in the Life of a Trademark, Copyright & Advertising Attorney: A Hypothetical Case Study Alexander Kim, Vice President and General Counsel, Binks Nate Whitaker, Chief Legal Officer and General Counsel, Crumbl Cathy Dahl and Tiffany Shimada, Dorsey & Whitney LLP What issues are companies facing daily while developing rights in intellectual property, protecting those rights, and staying in compliance with myriad potential issues related to advertising, social media, relationships with influencers, and environmental or governmental claims? This panel will feature two in-house counsel who are navigating these issues, utilizing a hypothetical case study, with the support of two Dorsey attorneys helping to develop a roadmap for meeting business objectives and minimizing the risk of claims. 12:00 pm - 1:15 pm CT Keynote Address Dr. Rebecca Heiss, Stress Physiologist Dr. Rebecca Heiss is a stress physiologist, author, and sought-after speaker who helps audiences transform fear and stress into fuel for greater performance and resilience. Her research has been recognized as “transformative” by the National Science Foundation, and she is the author of two books, Springboard and Instinct. Through her Fear(less) message, Rebecca inspires audiences with practical, science-based strategies to train our brains to work for us – not against us – and navigate change and uncertainty with greater confidence.

News

Dorsey & Whitney Advises Beijing Xunzhong on Two Consecutive H Share Placings Raising HK$418.5 Million

International law firm Dorsey & Whitney LLP acted as Hong Kong legal advisors to Beijing Xunzhong Communication Technology Co., Ltd. (“Xunzhong”) as to Hong Kong law in connection with two consecutive placings of new H shares under general mandate (the “First Placing” and the “Second Placing”, respectively, and together, the “Placings”). Xunzhong’s H shares are listed on the Main Board of the Hong Kong Stock Exchange (Stock Code: 2597). Winbull Securities International (Hong Kong) Limited acted as sole overall coordinator and placing agent on both Placings. The First Placing of 11,190,000 new H shares at HK$28.20 each was completed on September 17, 2026, followed by the Second Placing of 3,550,000 new H shares at HK$29.00 each on October 30, 2026. The Placings raised approximately HK$315.56 million and HK$102.95 million in gross proceeds, respectively, or approximately HK$418.51 million in aggregate (approximately HK$415.96 million in aggregate net proceeds). Both Placings were conducted under the same general mandate granted by shareholders at Xunzhong’s 2025 annual general meeting, and each was completed within one week of the signing of its placing agreement. Completing placings in consecutive months is relatively uncommon in the Hong Kong market, and doing so called on the technical depth of Dorsey’s Hong Kong Capital Markets team. Working closely with Xunzhong to understand its business needs and prepare the transaction documents, the team addressed in quick succession the remaining capacity under the general mandate, disclosure of the use of proceeds and the maintenance of Xunzhong’s public float, enabling both Placings to be completed seamlessly. “We are pleased to have advised Xunzhong on both Placings,” said Rachel Han, Partner and Co-Head of Dorsey’s Asia Capital Markets practice. “We appreciate the trust placed in our team and the close collaboration among all parties involved. We look forward to supporting Xunzhong as it continues to execute its growth strategy and pursue future capital markets opportunities.” Xunzhong is principally engaged in cloud-based communications services and enterprise digitalization services in the PRC. As disclosed in its announcements, the net proceeds of the First Placing are allocated to developing Xunzhong’s new computing power operation services business, while those of the Second Placing will be used to integrate model-as-a-service (MaaS) and AI agent capabilities into its existing cloud communications platform-as-a-service (PaaS) platform and software-as-a-service (SaaS) products. Approximately 55% of the net proceeds of the Second Placing will be used for computing power equipment upgrades for the MaaS system, approximately 35% for MaaS, PaaS and SaaS platform upgrades, and approximately 10% for working capital and general corporate purposes. With a single MaaS platform and shared computing power supporting its PaaS and SaaS offerings, Xunzhong intends for its MaaS, PaaS and SaaS capabilities to complement and reinforce one another, and to address customer needs from multiple angles, from embedding AI in customer communications and business workflows to maintaining stable performance at scale and keeping customer data within controlled environments. Partner and Co-Head of Dorsey’s Asia Capital Markets practice Rachel Han and Of Counsel in the Capital Markets and Corporate Compliance group Carlton Ng, along with Associate Kristy Ting, led the Dorsey Hong Kong Capital Markets & Corporate Compliance group in advising Xunzhong on both Placings.