Client Alert

Commerce Department Adopts Sweeping Changes in U.S. Export Controls

September 12, 2024

by Lawrence Ward, Dave Townsend, and T. Augustine Lo

Download as a PDF

Share this page

On September 6, the Bureau of Industry and Security (“BIS”) in the U.S. Commerce Department issued an interim final rule (“IFR”)[1] under the Export Administration Regulations (“EAR”) to add new export controls on semiconductor, quantum computing, and additive manufacturing items for national security and foreign policy reasons. The IFR’s effective date was September 6, 2024, subject to certain exceptions. The new IFR includes a number of novel export license requirements as well as the creation of an entirely new type of license exception that apply to countries that have adopted comparable export controls, which may signal a new turn by the United States toward plurilateral controls rather than traditional multilateral export control regimes among U.S. allies that agree with and support such measures.

The BIS announcement of the IFR included this statement from Alan Estevez, Under Secretary of Commerce: “Today’s action ensures our national export controls keep step with rapidly evolving technologies and are more effective when we work in concert with international partners, … Aligning our controls on quantum and other advanced technologies makes it significantly more difficult for our adversaries to develop and deploy these technologies in ways that threaten our collective security.” BIS is inviting public comment on the IFR through the U.S. Government’s online comment portal[2], and the official comment period will expire on November 5, 2024.

The IFR adds new Export Control Classification Numbers (“ECCNs”) to the EAR’s Commerce Control List (“CCL”), amends several existing ECCNs, creates a new license exception to authorize exports and reexports to and by other nations that have adopted comparable export controls for such added items, and adopts two new worldwide license requirements based upon national security and regional stability reasons. The IFR also includes new rules on deemed exports and deemed reexports[3] of related “technology” and computer source code related to the newly added hardware export controls.

Companies will need to review the IFR and immediately consider whether revisions or adjustments to their export control policies are needed, particularly with respect to the controls that will now apply to new or different hardware, software, or technology. In particular, U.S. and non-U.S. companies involved in quantum computing, semiconductor manufacturing, high-performance computing, and additive manufacturing should assess whether the new controls will limit their sales of hardware or software or whether non-U.S. person employees or partners must refrain from accessing source code and “technology” under the IFR.

Scope of New Export Controls

The IFR places worldwide export license requirements on specific items, including:

  • Quantum Computing Items: Quantum computers, related equipment, components, materials, software, and “technology” applicable to the development or maintenance of quantum computers;
  • Advanced Semiconductor Manufacturing Equipment: Tools and machines that are essential for the production of advanced semiconductor devices;
  • Gate All-Around Field-Effect Transistor (“GAAFET”) Technology:: “Technology” that produces or develops high-performance computing chips that can be used in supercomputers; and
  • Additive Manufacturing Items: Equipment, components and related “technology” and software designed to produce metal or metal alloy components through “3-D printing” or other similar additive manufacturing techniques.

It is significant that, beyond the newly enumerated hardware-focused export controls, the IFR emphasizes that these new export license requirements also apply to “technology” and source code under the EAR’s existing deemed export and deemed reexport requirements. The IFR then also spells out new exceptions and exclusions from those deemed export and deemed reexport rules as well as a general license, all of which will add to the complex compliance challenges for U.S. and non-U.S. companies in these particular technology sectors, especially those that operate on a multinational basis and that have multinational workforces, suppliers or customers.

Multilateral Approach & New License Exception IEC

BIS had previously announced earlier EAR changes in these same technology sectors beginning with two major rounds in October 2022 and October 2023, aiming to curb the advancement of advanced semiconductors, supercomputers, and artificial intelligence (“AI”) in certain nations, including the People’s Republic of China (“PRC”).[4] From the outset of those EAR changes, both industry and analysts had asked whether the United States would impose such expanded export controls on a purely unilateral basis while other advanced industrial nations with similar or comparable or even superior technology in Europe and Asia would allow their companies to continue their own unregulated exports to the PRC.

The new IFR provides a somewhat novel answer to that important question as BIS noted that several other nations have already adopted new export controls on quantum computing and advanced semiconductor manufacturing. Moreover, BIS said it expects more like-minded nations would soon also join in the adoption of comparable controls on a plurilateral basis but did not say such measures would be implemented through any multilateral control regime. Although these new U.S. controls were not adopted under an existing multilateral regime, the United States will now advocate for addition of these technologies to the list of items controlled by such a multilateral export control regime.

Significantly, BIS adds in this IFR a wholly new license exception in EAR § 740.24 that will be called “Implemented Export Controls” or simply “IEC.” Other nations that adopt measures compliant with the conditions of IEC will benefit because U.S. exporters of these newly controlled items will not need to file BIS export license applications to export such controlled items to other IEC-compliant nation. The stated goal of the new license exception IEC is to promote and encourage innovation among and between such like-minded nations that align their export controls with the United States and, in effect, to offer some “carrots” to offset the new “sticks” within this IFR.

Items eligible for export under license exception IEC will all be identified in the 900 series of ECCNs in the CCL. That is, IEC-eligible items will have ECCNs for which the third digit is the number 9 and the fourth digit is a number from 0 to 7 (for example, ECCN 3A901). Such items will have a worldwide license requirement and will be eligible for fewer conventional EAR license exceptions as compared to ECCNs that carry out multilateral regime controls.

BIS has posted on its website a table listing the IEC eligibility status for exports of certain items that are controlled by the new 900-series ECCNs and that are already deemed by BIS to be qualified for IEC license-free shipments as of September 6, 2024. A version of that BIS table with descriptions of the items controlled is shown below:

ITEMS CONTROLLED

ECCNs

ELIGIBLE DESTINATIONS

Additive manufacturing equipment for metal or metal alloy components

2B910

Italy, United Kingdom

“Software” n.s.e. “specially designed” or modified for “production” or “development” of ECCN 2B910 equipment

2D910

Italy, United Kingdom

“Technology” n.s.e. for “production” or “development” of “coating systems”

2E903

Italy, United Kingdom

‘Technology’’ n.s.e. ‘‘specially designed’’ or modified for ‘‘development’’ or ‘‘production’’ of ECCN 2B910 equipment

2E910

Italy, United Kingdom

Electronic items not specified by ECCN 3A001

3A901

Australia (ECCN 3A901.a only), Canada, France (ECCN 3A901.a only), Germany (ECCN 3A901.a & b.13 only), Italy, United Kingdom

Cryogenic cooling systems & components

3A904

Germany, Italy, United Kingdom

Equipment designed or modified for isotropic dry etching, having a largest ‘silicon germanium-to-silicon (SiGe:Si) etch selectivity’ of greater than or equal to 100:1

3B001.c.1.a

Australia, Germany, Canada, France, Italy, Japan, Spain, United Kingdom

Equipment designed or modified for anisotropic dry etching, having all of the following:

c.1.c.1. Radio Frequency (RF) power source(s) with at least one pulsed RF output;

c.1.c.2. One or more fast gas switching valve(s) with switching time < 300 milliseconds; and

c.1.c.3. Electrostatic chuck with 20 or more individually controllable variable temperature elements

3B001.c.1.c

Australia, Germany, Canada, France, Italy, Japan, Spain, United Kingdom,

‘‘EUV’’ masks and ‘‘EUV’’ reticles, designed for integrated circuits, not specified by 3B001.g, and having a mask ‘‘substrate blank’’ specified by ECCN 3B001

3B001.q

Italy, United Kingdom

Scanning Electron Microscope (“SEM”) equipment designed for imaging semiconductor devices or integrated circuits

3B903

Australia, Canada, France, Germany, Italy, Spain, United Kingdom

Cryogenic wafer probing equipment

3B904

Germany, Italy, United Kingdom

Epitaxial materials consisting of a ‘‘substrate’’ having at least one epitaxially grown layer and containing other specified materials

3C907

Italy, United Kingdom

Fluorides, hydrides, chlorides, of silicon or germanium, containing other specified materials

3C908

Italy, United Kingdom

Silicon, silicon oxides, germanium or germanium oxides, containing any other specified materials

3C909

Italy, United Kingdom

‘‘Software’’ ‘‘specially designed’’ for “development’’ or ‘‘production’’ of items controlled by ECCNs 3B001.c.1.a, 3B001.c.1.c, or 3B001.q

3D001

Japan (for ECCN 3B001.c.1.a and c.1.c only), Germany, Italy, United Kingdom

‘‘Software’’ ‘‘specially designed’’ for the ‘‘use’’ of equipment controlled by ECCN 3B001.a to .f and .j to .p, or 3B002

3D002

 

Australia, Japan (For ECCN 3b001.c.1.ac & c.1.c only), Canada, France, Germany, Italy, Spain, United Kingdom

‘‘Software’’ n.s.e. ‘‘specially designed’’ or modified for ‘‘development,’’ ‘‘production,’’ of items controlled by ECCNs 3A901.b, 3B903, or 3B904

3D901

Australia (for ECCN 3B903 only), Germany, Italy, United Kingdom

‘‘Software’’ designed to extract ‘‘GDSII’’ or equivalent standard layout data & perform layer-to-layer alignment from SEM images, & generate multi-layer ‘‘GDSII’’ data or circuit netlist

3D907

Australia, Canada, France, Germany, Italy, Spain, United Kingdom

‘‘Technology’’ according to EAR General Technology Note for ‘‘development’’ or ‘‘production’’ of items controlled by any 3A ECCN (except 3A901, 3A904, 3A980, 3A981, 3A991, 3A992, or 3A999), any 3B ECCN (except 3B903, 3B904, 3B991 or 3B992) or 3C ECCN (except 3C907, 3C908, 3C909, or 3C992)

3E001

Australia (for ECCN 3B001.c.1.a or c.1.c only), Canada, France (for ECCN 3B001.c.1.a or c.1.c only), Italy, United Kingdom

‘‘Technology’’ according to EAR General Technology Note for ‘‘development’’ or ‘‘production’’ of items controlled by ECCNs 3A901, 3A904, 3B903, 3B904, 3C907, 3C908, or 3C909

3E901

Australia (for ECCNs 3A901.a and 3B903 only), Canada, France, Germany (only for ECCN 3A901.a.1), Spain (only for ECCN 3B903), Italy, United Kingdom

‘‘Technology’’ according to EAR General Technology Note for ‘‘development’’ or ‘‘production’’ of integrated circuits or devices, using ‘‘Gate all-around Field-Effect Transistor (‘‘GAAFET’’) structures

3E905

Australia, Canada, France, Germany, Italy, Spain, United Kingdom

Quantum computers & related ‘‘electronic assemblies’’ and ‘‘components’’ therefor

4A906

Australia, Canada, France, Germany, Italy, Spain, United Kingdom

‘‘Software’’ ‘‘specially designed’’ or modified for ‘‘development’’ or ‘‘production”, of items controlled by ECCN 4A906.b or 4A906.c

4D906

Australia, Canada, France, Germany, Italy, United Kingdom

‘‘Technology’’ for ‘‘development’’ or ‘‘production’’ of items controlled by ECCNs 4A906.b, 4A906.c, or 4D906 or by and to control by ECCN 4E906.b; "technology’’ for ‘‘use’’ of ‘‘software’’ controlled by ECCN 4D906

4E906

Australia, Canada, France, Germany, Spain (only for ECCN 4A906), Italy. United Kingdom

Note: “n.s.e.” means “not specified elsewhere” within the Commerce Control List

New Deemed Export & Deemed Reexport Rules

In this IFR, BIS adopts a limited number of new deemed export and deemed reexport export license requirements in regard to quantum computers, materials, and related electronic assemblies; aerospace technology; and integrated circuit “development” or “production.” To help cope with these new requirements, BIS is also providing new exclusion clauses for deemed exports and deemed reexports to allow U.S. and non-U.S. companies to maintain ongoing research and development (“R&D”) of these vital emerging technologies. In two remarkably candid and revealing paragraphs within the IFR notice in the Federal Register[5], BIS writes:

The domestic development of quantum information science and technology (QIST) experts, including in quantum computing, is insufficient to fill the United States’ QIST strategic goals. The United States will continue to rely on foreign talent to fill critical workforce gaps. Currently, much of the QIST talent developed in the U.S. are foreign persons. Foreign persons are subject to visa requirements as administered by the Department of State. More than half of QIST-related degrees conferred in the U.S. are awarded to temporary U.S. residents. Additionally, stakeholders report that offshore companies are becoming increasingly attractive places to pursue a career in quantum computing, driven both by increases in public and private investments internationally, but also uncertainty in the ability to work in the United States due to immigration policies.

While the license requirements for deemed exports and deemed reexports of quantum technology and software only apply to foreign persons whose most recent country of citizenship or permanent residency is a destination specified in Country Group D:1 or D:5[6], this hardship would be devastating to the continued progress of future developments in the quantum field, which depends on foreign person employees from these destinations.

BIS is thus adding a new general license for deemed exports and deemed reexports of certain “technology” and software so that the new EAR export controls will be less disruptive to current R&D programs. However, reliance on that new general license will now entail some annual reporting to inform the U.S. Government so it can continue to monitor and oversee such deemed exports and reexports in regard to national security. Additionally, the IFR provides a 60-day delayed compliance date for quantum computing items to certain destinations so that U.S. exporters will have some limited time to file license applications with BIS and to update and amend their various internal compliance processes and policies in line with all these new requirements.

BIS Comment Requests

BIS urges the public to offer its input on three particular aspects of the IFR: (1) the proposed IEC license exception mechanism, particularly as it may affect U.S. industry supply chains and U.S. corporate compliance programs; (2), the scope and clarity of the new 900-series ECCNs; and (3) the scope of the license exceptions that will be allowed under the IFR. BIS is also seeking public input on the new deemed export and deemed reexport requirements in the IFR and the potential impacts that such new controls would have if they were to be applied to the quantum items and the new general license in General Order No. 6 in paragraph (f)(3) in Supplement No. 1 to EAR Part 736 were removed in this IFR or at some future date.

 


[1] https://www.bis.doc.gov/index.php/documents/federal-register-notices-1/3521-89-fr-72926-quantum-c-1-ifr-0694-aj60-9-6-2024/file

[2] www.regulations.gov. 

[3] EAR § 734.13(b) provides that “[a]ny release in the United States of ‘technology’ or source code to a foreign person is a deemed export to the foreign person’s most recent country of citizenship or permanent residency.”  In addition, EAR § 734.14(b) states that “[a]ny release outside of the United States of ‘technology’ or source code subject to the EAR to a foreign person of another country is a deemed reexport to the foreign person’s most recent country of citizenship or permanent residency, except as described in § 734.20.”

[4] See Biden Administration Restricts U.S. Exports of Advanced Computing and Semiconductor Manufacturing Equipment, Software, and Technology to China | News & Resources | Dorsey

[5] 89 Fed. Reg. 72926, -29 (Sept. 6, 2024).

[6] Country Group D:1 consists of those countries for which the EAR requires export licensing due to “national security” reasons, and Country Group D:5 is comprised of those countries for which the EAR mandates export licenses because they are subject to a U.S. arms embargo. Significantly, both Country Group D:1 and Country Group D:5 include the PRC.

Firm Highlights

Insights

EPA Limits Title V Re-Litigation of NSR Permits

Overview On September 25, 2026, the U.S. Environmental Protection Agency (“EPA”) published a final rule that significantly limits the ability of third parties to use the Clean Air Act (“CAA”) Title V permitting process to revisit New Source Review (“NSR”) permitting decisions years after those decisions were made. The rule establishes that NSR permitting determinations generally must be challenged during the original permitting proceeding, thereby providing regulated sources with greater permitting certainty and finality for major capital projects. Published in the Federal Register titled Clarifying the Scope of “Applicable Requirements” Under State Operating Permit Programs and the Federal Operating Permit Program (Docket ID No. EPA-HQ-OAR-2023-0401), the rule amends 40 C.F.R. Parts 70 and 71 to codify EPA’s interpretation regarding when requirements established under other CAA programs may be reviewed, modified, or implemented through the Title V operating permit program. The rule becomes effective 30 days after publication. The rule addresses two principal issues: (1) the relationship between NSR preconstruction permitting and Title V operating permits, and (2) the treatment of the General Duty Clause under CAA section 112(r)(1). Most significantly, the rule provides greater certainty for sources navigating the NSR permitting process. EPA’s amendments are intended to ensure that NSR permitting decisions made through an approved public process are generally not revisited later through Title V permit proceedings. The rule responds to a circuit split between the U.S. Courts of Appeals for the Fifth and Tenth Circuits. In Environmental Integrity Project v. EPA, 969 F.3d 529 (5th Cir. 2020), the Fifth Circuit upheld EPA’s interpretation, concluding that it was consistent with the text, structure, and purpose of Title V. In contrast, the Tenth Circuit reached the opposite conclusion in Sierra Club v. EPA, 964 F.3d 882 (10th Cir. 2020), finding that the then-existing regulatory definition of “applicable requirement” did not support EPA’s position. By amending the regulatory language on which the Tenth Circuit relied and codifying the interpretation approved by the Fifth Circuit, EPA has established a nationwide framework governing the interaction between NSR and Title V. NSR and Title V: EPA Establishes a Uniform Nationwide Framework At the core of the rule is EPA’s effort to define the respective roles of NSR and Title V. The rule codifies the approach EPA has applied since 2017: once a source obtains an NSR permit under an EPA-approved permitting program, and that permit was issued following public notice with an opportunity for comment and judicial review, the permit establishes the NSR-related “applicable requirements” of the State Implementation Plan (“SIP”) or Federal Implementation Plan (“FIP”) for Title V purposes. Under this framework, Title V is not a vehicle for re-examining underlying NSR permitting decisions. EPA does not intend to use the Title V process to revisit applicability determinations, emissions calculations, control technology determinations, permit conditions, or other issues resolved through the NSR permitting process. This principle applies regardless of the stage of the Title V proceeding; whether the NSR permit was issued pursuant to a SIP or FIP; the type of NSR issue involved; or whether the NSR permit is incorporated into Title V sequentially or concurrently. Limited Exceptions EPA recognizes several circumstances in which NSR issues may still be reviewed through the Title V program: No NSR permit was issued at all; The permit was issued without public notice and an opportunity for comment and judicial review; or The issue involves substantive overlap between Title V and NSR requirements, such as the adequacy of monitoring provisions. As a result, the rule does not insulate unpermitted projects or foreclose review of matters that independently arise under Title V. Key Regulatory Amendments The rule revises the definition of “applicable requirement” in 40 C.F.R. §§ 70.2 and 71.2. Paragraph (1): Where an NSR permit is issued with public notice and an opportunity for comment and judicial review, the permit establishes and defines the applicable SIP or FIP requirements for Title V purposes. Paragraph (2): All NSR permit terms, including terms contained in minor NSR permits, constitute applicable requirements that must be incorporated into Title V permits. Paragraph (4): CAA section 112(r)(1) (the General Duty Clause) is expressly excluded from the definition of “applicable requirement,” while section 112(r)(7) Risk Management Program requirements remain included. EPA also amended 40 C.F.R. §§ 70.8 and 70.12 to clarify that alleged defects in requirements established outside the Title V process generally do not provide a basis for EPA objection to a Title V permit or for a Title V citizen petition. General Duty Clause Exclusion The rule also codifies EPA’s longstanding position that the General Duty Clause in CAA section 112(r)(1) is not an “applicable requirement” for Title V purposes. EPA points to several considerations supporting that conclusion, including the distinction between the General Duty Clause and Title V permit terms, the provision’s origins in the Occupational Safety and Health Act’s general duty clause, and the different enforcement structures applicable to the General Duty Clause and Title V permit requirements. Importantly, excluding section 112(r)(1) from the definition of “applicable requirement” does not eliminate EPA’s authority to enforce the General Duty Clause independently of the Title V program. The final rule instead clarifies that the General Duty Clause need not—and should not—be incorporated into Title V permits as an applicable requirement. Practical Implications for Regulated Sources Greater Finality for NSR Permits  For projects requiring PSD, nonattainment NSR, or minor NSR permits, the permitting process becomes the primary forum for resolving disputes regarding applicability determinations, emissions calculations, control technology requirements, offsets, and permit conditions. Once an NSR permit is issued through a qualifying public process, regulated sources should face substantially reduced risk that those same issues will be challenged years later through Title V permit proceedings. Reduced Risk of Collateral Permit Challenges Stakeholders have sometimes sought to use Title V permit issuance, renewal, revision, or citizen-petition proceedings to challenge underlying NSR determinations. The final rule makes clear that Title V is not the appropriate vehicle for challenging whether an applicable requirement was correctly established in the first instance. This should reduce the risk of permit delays and uncertainty associated with collateral challenges to previously issued NSR permits. The rule does not, however, eliminate all Title V challenges relating to an NSR permit. Challenges concerning the Title V permit itself—including whether it appropriately incorporates applicable requirements or contains adequate compliance provisions—remain possible. Increased Importance of the Initial NSR Proceeding Because Title V generally will not provide a second opportunity to challenge the substantive validity of an NSR determination, the administrative record developed during the NSR process becomes increasingly important. Permit applicants should ensure that applicability analyses, emissions calculations, control technology evaluations, modeling demonstrations, and supporting technical documentation are thoroughly developed during the original permitting proceeding. For significant projects, applicants may therefore have an additional incentive to identify and resolve potential permitting issues before the NSR permit is issued rather than assuming that unresolved issues can be addressed during a subsequent Title V proceeding. Potential Incentive for Broader Public Participation EPA also notes that permitting authorities may choose to provide public notice and an opportunity for comment for a broader range of NSR permits because permits issued through a qualifying public process receive the benefit of the finality framework established by the rule. Some permitting authorities may conclude that greater public participation at the NSR stage is preferable to uncertainty during subsequent Title V proceedings. Conclusion The final rule is principally a permitting-certainty measure. For sources that obtain NSR permits through a public process, EPA has substantially limited the ability of third parties to revisit underlying NSR determinations through the Title V program. As a result, regulated entities should benefit from greater finality regarding key permitting decisions, reduced risk of collateral permit challenges, and increased certainty when planning and implementing capital projects.

Insights

SEC Proposes Expansion of Investment Adviser Performance-Based Compensation Rule

On September 30, 2026, the Securities and Exchange Commission (the “SEC”) proposed amendments to Rule 205-3 under the Investment Advisers Act of 1940, as amended (the “Advisers Act”), which provides an exemption from the general prohibition under Section 205(a)(1) of the Advisers Act on registered investment advisers receiving performance-based compensation (the “Proposal”) so long as performance-based compensation is limited to “qualified clients”.1 Most notably for private fund sponsors, the Proposal would expand the definition of “qualified client” to include any investors that satisfy the “accredited investor” definition under Regulation D. The Proposal may also have implications for private fund managers that rely on exemptions from investment adviser registration under state law because certain state-level investment adviser registration exemptions incorporate or otherwise reference the federal qualified client definition. Expansion of the Qualified Client Definition Under the current Rule 205-3, an investor generally may qualify as a qualified client if, among other alternatives, the investor has at least $1.4 million under management with the adviser or has a net worth exceeding $2.7 million. These thresholds are higher than the financial thresholds applicable to many accredited investors under Regulation D. As a result, an investor may currently qualify as an accredited investor for purposes of investing in a private offering without qualifying as a qualified client for purposes of paying performance-based compensation. The Proposal would expand the qualified client definition to include any natural person or legal entity investor that satisfies the accredited investor definition under Regulation D. The Proposal would also remove the assets under management and net worth thresholds under the current Rule 205-3 qualified client test. For private funds relying on Section 3(c)(1) of the Investment Company Act of 1940, this change could reduce the need to apply a separate qualified client standard to investors that already qualify as accredited investors. Dorsey Observations and Next Steps If adopted as proposed, the expanded qualified client definition could be particularly significant for private fund managers. Most private fund offerings are already limited to accredited investors under Regulation D. However, the Proposal could expand the pool of prospective investors available to emerging private fund managers while reducing the regulatory burden associated with complying with Rule 205-3. The Proposal could also benefit advisers operating below the SEC registration threshold that rely on a state private fund adviser exemption. A number of states have adopted exemptions modeled on the North American Securities Administrators Association (“NASAA”) private fund adviser exemption, which may condition relief for advisers to certain funds relying on Section 3(c)(1) on each beneficial owner satisfying the federal qualified client definition. However, state requirements vary, and any effect of the Proposal would depend on the text of the applicable state exemption and how it incorporates Rule 205-3. Many emerging private fund managers may have a larger network of accredited investor relationships than qualified client relationships during the early stages of their investment advisory business. Currently, under Rule 205-3, private fund managers may receive performance-based compensation from investors who do not satisfy the qualified client definition if those investors were admitted to their private funds prior to registration with the SEC. Following registration with the SEC, however, managers may continue to permit investors that are not qualified clients to invest in future private funds but may not receive performance-based compensation from those investors with respect to such investments. In addition, because the net worth and assets under management thresholds for qualified client status are adjusted for inflation every five years, the pool of qualified client investors may diminish over time as previously eligible investors no longer satisfy the applicable thresholds. The Proposal could provide the dual benefit of greater flexibility for private fund managers to establish and maintain relationships with accredited investors as their businesses scale and they become registered with the SEC, and greater flexibility for certain accredited investors to participate in investment strategies that historically have been restricted to much larger institutional investors. Unless and until the Proposal is adopted, investment advisers should continue to comply with the existing qualified client requirements. If the Proposal is adopted, private fund sponsors should consider whether corresponding changes are appropriate for their subscription documents, investor questionnaires, and other offering materials. Advisers that are state-registered or rely on a state-level exemption should also consult the laws and regulations of each relevant jurisdiction before changing investor eligibility standards or performance-based compensation practices, because adoption of the federal amendments may not automatically modify state requirements. Comments on the Proposal will be due 60 days after publication in the Federal Register. 1 Investment Adviser Performance-Based Compensation Modernization, Investment Advisers Act Release No. IA-7022 (Sept. 30, 2026), available at https://www.sec.gov/rules-regulations/2026/09/s7-2026-28#33-11443proposed.

Insights

The Supreme Court Update - October 8, 2026

On September 29, 2026, the Supreme Court granted certiorari in one case: Department of Homeland Security v. D.V.D., No. 26-426: This case concerns the Trump Administration’s “third-country removal” procedures, where immigrants are deported to countries not listed in the removal orders. In granting certiorari, the Court granted the Government’s application to stay a lower court decision halting the practice, which will allow third-country removals to continue pending resolution of the case. The issues presented are: (1) Whether the district court had jurisdiction over respondents’ claims; (2) whether the district court had authority to enter class-wide declaratory relief and APA vacatur under 8 U.S.C. § 1252(f)(1); (3) whether the Government’s guidance on third-country removals is unlawful under 8 U.S.C. § 1231(b), the due process clause, or FARRA/CAT and its implementing regulations; and (4) such other questions that the Government determines are appropriate for the proper disposition of the case. On October 1, 2026, the Court granted certiorari in three additional cases: Rhoney v. Barbosa da Cunha, No. 26-104: Immigration officials detained Ricardo Aparecido Barbosa da Cunha—a Brazilian citizen who had lived in the United States for approximately twenty years after entering without inspection—and denied him a bond hearing under 8 U.S.C. § 1225(b)(2)(A). The Second Circuit held that his detention was instead governed by § 1226(a), which permits release on bond, because § 1225(b)(2)(A)’s mandatory-detention requirement applies only to noncitizens apprehended while entering the country or shortly thereafter. The question presented is: Whether 8 U.S.C. § 1225(b)(2)(A) mandates the detention pending removal proceedings of aliens who, like Barbosa da Cunha, are present in the United States without having been admitted. Missionaries of St. John the Baptist, Inc. v. Frederic, No. 25-113: A Catholic religious organization sought to build a shrine to the Virgin Mary on land the organization owned adjacent to its church in Park Hills, Kentucky. Local zoning restrictions prohibited the proposed construction. The question presented is: Whether a land-use regulation that prohibits a religious institution from building a religious structure on its own property constitutes a “substantial burden” on religious exercise under the Substantial Burden Provision of the Religious Land Use and Institutionalized Persons Act, 42 U.S.C. § 2000cc(a). Marschner v. Marschner, No. 25-1349: Under the Uniformed Services Former Spouses’ Protection Act (“USFSPA”), a veteran’s longevity-based retirement pay can be divided in a divorce, but retirement pay based on disability and retirement pay that was waived to receive disability pay are indivisible. The question presented is: Does the USFSPA require state courts to refuse enforcement of indemnification provisions in a divorce settlement agreement?

Insights

Energy Law: Month in Review - September 2026

Welcome to Dorsey’s Energy Law: Month in Review. We provide this update to our clients to identify significant developments in the previous month. Please reach out to any of the authors, listed above, to discuss these issues. Regulatory Developments Massachusetts Ratchets Up State and Local Regulation of AI Data Centers In early September, Governor Maura Healey of Massachusetts signed an executive order requiring that artificial intelligence data centers secure the approval of local communities as a precondition to proceeding with a given project. According to the terms of the order, data center developers will need to secure a “community benefits agreement” as a precondition to receiving permits from numerous state agencies, including the Department of Environmental Protection, the Energy Facilities Siting Board, and the Massachusetts Environmental Policy Act Office. Beyond requiring community benefits agreements, the order also mandates that developers mitigate utility costs to consumers, prohibits the use of nondisclosure agreements, and requires various state agencies to develop measures to limit data center impacts on the environment. North Carolina Regulators Decline Approval of Duke Energy Gas Turbine On September 18, 2026, North Carolina Utilities Commission (NCUC) denied Duke Energy’s application for a certificate of public convenience and necessity required to construct a gas-fueled combustion turbine at its Smith Energy Complex in North Carolina. The NCUC objected strongly to the $584 million price tag and noted that Duke appeared to be constructing the facility “based on anticipated data center customer additions.” The NCUC rejected that anticipated growth as “insufficiently reliable for the Commission to act at this point.” In rejecting Duke’s application, the NCUC also noted that Duke had signed the White House Ratepayer Protection Pledge, in which it represented that it would not shift data center costs to consumers. The NCUC observed that the record did not demonstrate how Duke “intends to adhere to its commitments under the Ratepayer Protection Pledge with regard to the Proposed Facility.” Notably, commission staff had actually supported the construction of the turbine, citing concerns about Duke’s reserve margins. The NCUC noted that it “understands the Public Staff’s expressed concerns,” but those concerns were outweighed by the NCUC’s reservations, including questions of demand. Department of Energy Approves Funds for Grid Improvement The U.S. Department of Energy (DOE) recently announced that it would fund 31 grid-improvement projects in 26 states. The funding initiative is part of the DOE’s “SPARK” initiative. The funding will include $1.9 billion in federal funding from DOE and $3.35 billion in recipient cost-sharing funding. The funds will go to projects designed to improve grid reliability and lower electricity costs. Recipients plan to reconductor over 1,500 miles of transmission lines and will deploy grid-enhancing technologies across approximately 21,000 miles. DOE stated that this initiative will make available over 23 additional gigawatts of electricity. Texas Moderates Rules Governing Data Center Interconnection The Texas Public Utility Commission adopted new regulations governing large-load interconnections. The rules impose a flat study fee of $100,000 for all proposed interconnections, which departs from the initial proposal to impose study fees using a tiered system based on project size. Additionally, the final rule eliminates the PUC’s previous proposal to impose a non-refundable interconnection fee of $50,000 per MW of contracted peak demand. The final rule also moderates the initially proposed regulations governing Electric Reliability Council of Texas (ERCOT) notifications for large-load customers’ non-utilized capacity. The proposed rules would have required notifying ERCOT within 30 days of missing a scheduled energization milestone by six months. The final rules, however, do not require informing ERCOT unless a scheduled energization milestone is missed by 24 months. FERC Denies TransAlta 202(c) Cost-Recovery Plan The Federal Energy Regulatory Commission (FERC) recently rejected TransAlta’s plan to recover $19.9 million in expenses stemming from a DOE order in which DOE prohibited TransAlta from retiring its coal-powered Centralia power plant. TransAlta had previously intended to retire the facility at the end of 2025. TransAlta’s cost recovery plan proposed spending an additional $23 million on repairs to continue operating the unit. FERC’s main objection had to do with geographic scope. TransAlta’s recovery plan called for recovering costs from California Independent System Operator (CAISO) and the Southwest Power Pool (SPP), but the DOE’s order requiring operation of the plant was designed to ensure reliability in the Northwest assessment area (Montana, Oregon, Washington, and parts of northern California and northern Idaho). Accordingly, FERC was unwilling to allow cost recovery from CAISO and SPP when the order that precipitated the additional costs only related to the Northwest assessment area. FERC informed TransAlta that it would only approve cost recovery from load-serving entities in the Northwest assessment area. FERC’s decision comes amid a rush of DOE emergency orders requiring the continued operation of coal-fired generating units. Litigation Appeals Court Upholds Washington Hydropower Plant With Caveats In a September 21, 2026, opinion, the Washington Court of Appeals largely upheld a Clean Water Act water quality certification by the Washington Department of Ecology for the Goldendale Energy Storage Project, a proposed pumped-water storage hydropower system adjacent to, but off-stream from, the Columbia River. A nonprofit (Columbia Riverkeeper) and the Confederated Tribes and Bands of the Yakama Nation appealed the certification, contending that it failed to impose necessary conditions and monitoring requirements to protect the water quality of the Columbia River. Most saliently, the plaintiffs argued that the project had the potential to leak 100 acre-feet of water per year into tributaries of the Columbia River. The Court of Appeals broadly rejected plaintiffs’ challenge to the state’s conclusion that “the project was designed not to leak.” That said, the Court of Appeals did reverse on one narrow issue. Specifically, the court determined that the state’s conclusion that “leakage from the project’s tunnels would be monitored and reported” was not supported by the evidence because the certification “does not explicitly require monitoring and reporting to determine whether there is any leakage.” Accordingly, the court remanded the matter to the state to impose monitoring and reporting requirements but otherwise affirmed the certification. Legislative Developments California Legislates Restrictions on Data Center Energy Use and Grid Costs On September 21, 2026, California Governor Gavin Newsom signed seven bills broadly regulating data centers in the state. SB 1168 directed the California Public Utilities Commission to assess the energy used by data centers. It also requires the PUC to pass costs of transmission and distribution upgrades and load increases on to data centers, rather than customers. SB 886 and SB 887 compel data centers to pay for infrastructure upgrade and generation costs, and wildfire mitigation costs, in addition to imposing environmental review. The statutes additionally increase local oversight of data centers. AB 1577 imposes a monthly reporting requirement that requires data centers to supply energy consumption and efficiency data to the California Energy Commission. AB 2383 contains incentives for data centers to use onsite clean energy generation. Finally, AB 2469 and AB 2619 require data center developments to assess water supply and develop a water scarcity plan. The statutes also mandate statewide water reporting as a precondition to obtaining and renewing business licenses.