GENERAL

There have been a number of key developments in the evolution of the UK’s national security regime since our e-bulletin earlier this year (UK to Adopt New Powers Over M&A Activity To Protect National Security). First and foremost, the National Security and Investment Bill has now taken its place on the UK Statute Book as the National Security and Investment Act 2021 (the “Act”).  The new legislation is set to come into force on the 4th January 2022.

The Act and its associated secondary legislation will confer powers on the Secretary of State for Business, Energy and Industrial Strategy (“BEIS”), acting through the newly established Investment Security Unit (the “ISU”), to “call-in” transactions involving the acquisition of control or material influence over entities and assets where those transactions involve national security considerations. The Act will also mandate the prior notification and clearance of any acquisitions of material influence over entities which are active in one or more of 17 prescribed “sensitive” sectors.  Those prescribed sectors are considered in more detail below but we would highlight at the outset that (in addition to defence, civil nuclear and military and dual use technologies) they include advanced materials, artificial intelligence, communications, data infrastructure, suppliers to the emergency services and transport. The new notification and clearance regime will therefore have application to a broad range of acquisitions and investments.

Significantly, once the Act comes into force, the call-in powers referred to above will apply to any qualifying transaction completed from the 12th November 2020 onwards. We discuss the implications of this for current investment and M&A activity later in this note. 

WHICH ACQUISITIONS AND INVESTMENTS ARE CAUGHT BY THE ACT?

It is notable that whilst a principal objective of the Act is to retain domestic control over sensitive assets, information and technology, the new regime does not specifically target overseas purchasers and investors.  Instead, the Act will apply to any transaction which results in either an individual, or a UK or overseas entity, acquiring control over a qualifying entity or qualifying asset. Any such acquisition is defined in the Act as a “Trigger Event”, and the same definition has been adopted within this e-bulletin.

For this purpose, a “qualifying entity” includes any company, partnership, unincorporated association or trust which provides goods or services within or to the UK, regardless of its geographical base. A “qualifying asset” includes intangible assets such as trade secrets, designs and other intellectual property which are either used in connection with activities carried on in the UK or in the supply of goods or services to persons in the UK.

Since the Act focuses on the nature of the underlying activities or assets being acquired, no monetary thresholds apply.

The Act defines “control” in the broadest terms. With regards to qualifying entities, the definition captures any situation in which a buyer or investor is able to exercise material influence over the activities of that qualifying entity. In the case of qualifying assets, the term “control” means the ability to use, or direct or control the use of, that asset (or the ability to do so to a greater extent than before the acquisition).

More specifically, the Act provides that control over qualifying entities will be acquired where:

  • the acquirer’s percentage interest in the shares or voting rights exercisable in the qualifying entity increases: (i) from 25% or less to over 25%; or (ii) from less than 50% to over 50%; or (iii) from less than 75% to over 75%. In the case of a partnership or other business medium which does not have shares, these thresholds relate to rights in the percentage shares of the surplus assets on a winding up; or
  • the acquirer gains the ability to control sufficient voting rights in the qualifying entity with the power to pass or block resolutions governing the entity’s affairs; or
  • the acquirer gains the ability to exercise material influence over the policy of the qualifying entity, such as by acquiring the right to appoint members of the board to influence its strategic direction.  Notably, a holding of 15% or less of shares or voting rights may suffice here when considered alongside other material factors such as the acquirer’s status and sector expertise.

Control may therefore be acquired through a broad range of transactions including share transfers, share allotments, share buybacks and joint venture arrangements.

The Act specifically addresses numerous types of interests in qualifying entities, including joint holdings, holdings by connected persons, persons who share a common purpose, acquisitions of shares in holding companies in which a chain of control exists down to the qualifying entity and acquisitions of interests in nominees and in controllers of rights and interests over qualifying entities.

Importantly, an interest will not generally arise from the granting of security over shares unless the terms of the security allow the holder to direct how the rights attaching to those shares are exercised prior to the occurrence of an event of default. The Act also contains a general exemption for rights exercised by administrators and creditors.

APPLICATION OF THE ACT TO OVERSEAS ENTITIES AND ASSETS

The Act applies to entities which carry on activities or supply goods or services to persons in the UK, regardless of their geographical base.

BEIS-issued guidance makes it clear that the Act also captures overseas entities which carry out research and development activities in the UK, have UK-based offices or branches or whose supervisory functions are performed in the UK, as well as those which supply goods to a UK hub (unless such hub only places orders to be sent elsewhere). The same guidance also explains that an overseas target will not be treated as a qualifying entity where its only nexus with the UK is one or more of the following:

  • it has staff based in the UK who are working remotely from a non-UK office; or
  • it has owners or investors based in the UK; or
  • it buys goods or services from UK-based suppliers; or
  • it has a parent with other subsidiaries that carry on activities in the UK; or
  • its securities are listed on a regulated or exchange-regulated market in the UK.

If a qualifying asset is based outside the UK, it remains a qualifying asset if it is either used in connection with activities carried on in the UK or in the supply of goods or services to persons in the UK.

CONSEQUENCES OF ACQUIRING CONTROL OVER A QUALIFYING ENTITY OR A QUALIFYING ASSET

Categorisation of Transactions

Having established that a transaction constitutes or will constitute a Trigger Event, the next step is to determine:

  • whether the transaction must be notified to, and thereafter cleared by, the ISU under the mandatory notification regime once this comes into force on the 4th January 2022 (the Act defines such transactions as “notifiable acquisitions”). The mandatory notification regime and its application is discussed later in this e-bulletin;
  • whether the transaction, whilst not falling within one of the sensitive sectors, is one which might reasonably be regarded as having implications for national security and which may therefore be susceptible to the issue of a call-in notice if (and when) it comes to the attention of the ISU; or
  • whether the transaction is neither a notifiable acquisition nor one which may be susceptible to the issue of a call-in notice.

In the last of these three cases, no action is required under the Act. However, where it is concluded that the transaction may be susceptible to the issue of a call-in notice, consideration should be given to the making of a voluntary notification.

We discuss the impending mandatory notification regime, the new call-in powers and the concept of notifiable transactions below.

Mandatory Notification Regime

When the Act and attendant regulations (which are currently in draft form and can be found here) come into force, acquisitions of qualifying entities which operate in one or more of 17 designated sensitive sectors must be notified and given advance clearance before proceeding to completion.

The 17 sensitive sectors are as follows:

Advanced materials     Critical suppliers to government     Quantum technologies
Advanced robotics     Cryptographic authentication     Satellite and space technologies
Artificial intelligence     Data infrastructure     Suppliers to the emergency services
Civil nuclear     Defence     Synthetic biology
Communications      Energy     Transport
Computing hardware     Military and dual-use

On the 15th November 2021, the Government issued a Guidance Note on notifiable acquisitions. This provides essential information on each of the above sectors and should be consulted in all cases where there is a concern that the target’s activities may bring it within the mandatory notification regime.

After receiving notification of a transaction or proposed transaction in the prescribed online form, the ISU will have an initial review period of 30 working days to either clear the transaction or call it in for a full national security assessment. The ISU can also make requests for further information or ask to hold meetings with a party’s representatives within this period.

If a call-in notice is served, a further 30 working days is allotted for the ISU to carry out a full risk assessment of the transaction. This assessment period is subject to an extension of up to a further 45 working days. Further extensions are possible, but will require the acquirer’s agreement.

Notifiable acquisitions must not be completed until they have been notified and cleared. As such, a notifiable transaction which is completed without clearance will be void. Given the severity of this sanction, the Act provides for a retrospective validation process which, in appropriate cases, will alleviate the consequences of an initial failure to notify and obtain clearance. However, sanctions for non-compliance may still be levied.

Exercise of Call-In Powers

The Act will confer power on the Secretary of State to issue call-in notices in respect of any transactions completed on or after the 12th November 2020, where he or she reasonably suspects that either a Trigger Event has taken place (being an acquisition of control over a qualifying entity or a qualifying asset, as above) or where arrangements are in progress which, if carried into effect, would give rise to a Trigger Event taking place. In either case, the acquisition must be considered to pose an actual or potential risk to national security.

A call-in notice may be issued at any time prior to the fifth anniversary of a transaction and must, in any event, be issued no later than 6 months after the Secretary of State (acting through the ISU) becomes aware of the deal. The call-in power cannot be exercised where the deal was previously approved following the making of either a mandatory or voluntary notification.

On the 2nd November 2021, the Government issued a statement providing information on how the Secretary of State expects to utilise the call-in power. The statement makes it clear that the Secretary of State will primarily (but not exclusively) focus on acquisitions involving one or more of the 17 sensitive sectors, and that the following three principal risk factors will be applied in making an assessment of risk to national security:

  • Target risk: whether the target of the qualifying acquisition (the entity or asset being acquired) is being used, or could be used, in such a way that poses a risk to national security;
  • Acquirer risk: whether the acquirer possesses characteristics which suggest that there is, or may be, a risk to national security as a result of the acquirer having control of the target; and
  • Control risk: assessing the amount of control that has been, or will be, acquired through the qualifying acquisition, it being assumed that a higher level of control may increase the level of national security risk.

Sanctions and Penalties

Where national security risks are identified, the ultimate sanction available to the Secretary of State will be to unwind the transaction or otherwise block it from proceeding to completion. In practice, it is more likely that sanctions such as limiting the number of target shares that an investor can acquire or exercise voting rights over, restricting access to operational works or particular sites or forbidding access to certain commercial information will be utilised.

It is worth noting that failure to comply with the requirements of the Act could lead to fines of the greater of £10 million or up to 5% of worldwide turnover, a maximum 5 year prison sentence and director disqualification for up to 15 years.

Voluntary Notification

Whilst the Act does not require parties to notify or seek clearance for transactions which fall outside the scope of the mandatory notification regime, it does contain provisions which enable an acquirer to voluntarily notify acquisitions of qualifying entities or qualifying assets to the ISU. The same time periods apply here as for assessments made under the mandatory notification regime.

We believe that voluntary notification and clearance will become a useful tool for managing transaction risk. In particular, it has the potential to enable parties to create certainty around closing conditions and to dispense with, or at least limit, indemnification and escrow arrangements which might otherwise prove to be a stumbling block in negotiations.

PLANNING AHEAD

Despite the likelihood that only a fraction of deals will present real national security risks and thereby become subject to the full weight of the new regime, the Act will have a significant impact on the planning and implementation of transactions.

Clients contemplating any acquisition or investment (including transactions projected to complete before the 4th January 2022) should review the activities undertaken by the target and, where appropriate, seek guidance as to whether those activities might make the deal susceptible to being called-in once the Act comes into force or, if the timetable projects beyond 4th January 2022, require it to be notified and cleared as a condition to closing. We can assist clients with this analysis and will also advise on matters such as closing conditions and on the process for seeking informal guidance from the ISU on the likelihood of the deal being called-in.

As no formal notification procedure is currently in place, discussions with the ISU conducted prior to the 4th January 2022 will, at best, result in a non-binding indication from the ISU as to whether the proposed transaction is potentially at risk of being called in.  However, such discussions carry the incidental benefit of limiting the period for serving a call-in notice to 6 months from the 4th January 2022, once the Act is in force.

We have advised numerous clients on the implications of the new regime and we will be happy to discuss any concerns that you may have around the application or potential application of the Act to any proposed or concluded transactions.

Please call Tim Maloney or Mark Taylor for further information.

This e-bulletin is issued to provide general guidance on the above topic. It is not comprehensive or exhaustive and does not constitute legal advice given by this Firm.

 

Firm Highlights

Insights

Energy Law: Month in Review - September 2026

Welcome to Dorsey’s Energy Law: Month in Review. We provide this update to our clients to identify significant developments in the previous month. Please reach out to any of the authors, listed above, to discuss these issues. Regulatory Developments Massachusetts Ratchets Up State and Local Regulation of AI Data Centers In early September, Governor Maura Healey of Massachusetts signed an executive order requiring that artificial intelligence data centers secure the approval of local communities as a precondition to proceeding with a given project. According to the terms of the order, data center developers will need to secure a “community benefits agreement” as a precondition to receiving permits from numerous state agencies, including the Department of Environmental Protection, the Energy Facilities Siting Board, and the Massachusetts Environmental Policy Act Office. Beyond requiring community benefits agreements, the order also mandates that developers mitigate utility costs to consumers, prohibits the use of nondisclosure agreements, and requires various state agencies to develop measures to limit data center impacts on the environment. North Carolina Regulators Decline Approval of Duke Energy Gas Turbine On September 18, 2026, North Carolina Utilities Commission (NCUC) denied Duke Energy’s application for a certificate of public convenience and necessity required to construct a gas-fueled combustion turbine at its Smith Energy Complex in North Carolina. The NCUC objected strongly to the $584 million price tag and noted that Duke appeared to be constructing the facility “based on anticipated data center customer additions.” The NCUC rejected that anticipated growth as “insufficiently reliable for the Commission to act at this point.” In rejecting Duke’s application, the NCUC also noted that Duke had signed the White House Ratepayer Protection Pledge, in which it represented that it would not shift data center costs to consumers. The NCUC observed that the record did not demonstrate how Duke “intends to adhere to its commitments under the Ratepayer Protection Pledge with regard to the Proposed Facility.” Notably, commission staff had actually supported the construction of the turbine, citing concerns about Duke’s reserve margins. The NCUC noted that it “understands the Public Staff’s expressed concerns,” but those concerns were outweighed by the NCUC’s reservations, including questions of demand. Department of Energy Approves Funds for Grid Improvement The U.S. Department of Energy (DOE) recently announced that it would fund 31 grid-improvement projects in 26 states. The funding initiative is part of the DOE’s “SPARK” initiative. The funding will include $1.9 billion in federal funding from DOE and $3.35 billion in recipient cost-sharing funding. The funds will go to projects designed to improve grid reliability and lower electricity costs. Recipients plan to reconductor over 1,500 miles of transmission lines and will deploy grid-enhancing technologies across approximately 21,000 miles. DOE stated that this initiative will make available over 23 additional gigawatts of electricity. Texas Moderates Rules Governing Data Center Interconnection The Texas Public Utility Commission adopted new regulations governing large-load interconnections. The rules impose a flat study fee of $100,000 for all proposed interconnections, which departs from the initial proposal to impose study fees using a tiered system based on project size. Additionally, the final rule eliminates the PUC’s previous proposal to impose a non-refundable interconnection fee of $50,000 per MW of contracted peak demand. The final rule also moderates the initially proposed regulations governing Electric Reliability Council of Texas (ERCOT) notifications for large-load customers’ non-utilized capacity. The proposed rules would have required notifying ERCOT within 30 days of missing a scheduled energization milestone by six months. The final rules, however, do not require informing ERCOT unless a scheduled energization milestone is missed by 24 months. FERC Denies TransAlta 202(c) Cost-Recovery Plan The Federal Energy Regulatory Commission (FERC) recently rejected TransAlta’s plan to recover $19.9 million in expenses stemming from a DOE order in which DOE prohibited TransAlta from retiring its coal-powered Centralia power plant. TransAlta had previously intended to retire the facility at the end of 2025. TransAlta’s cost recovery plan proposed spending an additional $23 million on repairs to continue operating the unit. FERC’s main objection had to do with geographic scope. TransAlta’s recovery plan called for recovering costs from California Independent System Operator (CAISO) and the Southwest Power Pool (SPP), but the DOE’s order requiring operation of the plant was designed to ensure reliability in the Northwest assessment area (Montana, Oregon, Washington, and parts of northern California and northern Idaho). Accordingly, FERC was unwilling to allow cost recovery from CAISO and SPP when the order that precipitated the additional costs only related to the Northwest assessment area. FERC informed TransAlta that it would only approve cost recovery from load-serving entities in the Northwest assessment area. FERC’s decision comes amid a rush of DOE emergency orders requiring the continued operation of coal-fired generating units. Litigation Appeals Court Upholds Washington Hydropower Plant With Caveats In a September 21, 2026, opinion, the Washington Court of Appeals largely upheld a Clean Water Act water quality certification by the Washington Department of Ecology for the Goldendale Energy Storage Project, a proposed pumped-water storage hydropower system adjacent to, but off-stream from, the Columbia River. A nonprofit (Columbia Riverkeeper) and the Confederated Tribes and Bands of the Yakama Nation appealed the certification, contending that it failed to impose necessary conditions and monitoring requirements to protect the water quality of the Columbia River. Most saliently, the plaintiffs argued that the project had the potential to leak 100 acre-feet of water per year into tributaries of the Columbia River. The Court of Appeals broadly rejected plaintiffs’ challenge to the state’s conclusion that “the project was designed not to leak.” That said, the Court of Appeals did reverse on one narrow issue. Specifically, the court determined that the state’s conclusion that “leakage from the project’s tunnels would be monitored and reported” was not supported by the evidence because the certification “does not explicitly require monitoring and reporting to determine whether there is any leakage.” Accordingly, the court remanded the matter to the state to impose monitoring and reporting requirements but otherwise affirmed the certification. Legislative Developments California Legislates Restrictions on Data Center Energy Use and Grid Costs On September 21, 2026, California Governor Gavin Newsom signed seven bills broadly regulating data centers in the state. SB 1168 directed the California Public Utilities Commission to assess the energy used by data centers. It also requires the PUC to pass costs of transmission and distribution upgrades and load increases on to data centers, rather than customers. SB 886 and SB 887 compel data centers to pay for infrastructure upgrade and generation costs, and wildfire mitigation costs, in addition to imposing environmental review. The statutes additionally increase local oversight of data centers. AB 1577 imposes a monthly reporting requirement that requires data centers to supply energy consumption and efficiency data to the California Energy Commission. AB 2383 contains incentives for data centers to use onsite clean energy generation. Finally, AB 2469 and AB 2619 require data center developments to assess water supply and develop a water scarcity plan. The statutes also mandate statewide water reporting as a precondition to obtaining and renewing business licenses.

Insights

The Supreme Court Update - October 8, 2026

On September 29, 2026, the Supreme Court granted certiorari in one case: Department of Homeland Security v. D.V.D., No. 26-426: This case concerns the Trump Administration’s “third-country removal” procedures, where immigrants are deported to countries not listed in the removal orders. In granting certiorari, the Court granted the Government’s application to stay a lower court decision halting the practice, which will allow third-country removals to continue pending resolution of the case. The issues presented are: (1) Whether the district court had jurisdiction over respondents’ claims; (2) whether the district court had authority to enter class-wide declaratory relief and APA vacatur under 8 U.S.C. § 1252(f)(1); (3) whether the Government’s guidance on third-country removals is unlawful under 8 U.S.C. § 1231(b), the due process clause, or FARRA/CAT and its implementing regulations; and (4) such other questions that the Government determines are appropriate for the proper disposition of the case. On October 1, 2026, the Court granted certiorari in three additional cases: Rhoney v. Barbosa da Cunha, No. 26-104: Immigration officials detained Ricardo Aparecido Barbosa da Cunha—a Brazilian citizen who had lived in the United States for approximately twenty years after entering without inspection—and denied him a bond hearing under 8 U.S.C. § 1225(b)(2)(A). The Second Circuit held that his detention was instead governed by § 1226(a), which permits release on bond, because § 1225(b)(2)(A)’s mandatory-detention requirement applies only to noncitizens apprehended while entering the country or shortly thereafter. The question presented is: Whether 8 U.S.C. § 1225(b)(2)(A) mandates the detention pending removal proceedings of aliens who, like Barbosa da Cunha, are present in the United States without having been admitted. Missionaries of St. John the Baptist, Inc. v. Frederic, No. 25-113: A Catholic religious organization sought to build a shrine to the Virgin Mary on land the organization owned adjacent to its church in Park Hills, Kentucky. Local zoning restrictions prohibited the proposed construction. The question presented is: Whether a land-use regulation that prohibits a religious institution from building a religious structure on its own property constitutes a “substantial burden” on religious exercise under the Substantial Burden Provision of the Religious Land Use and Institutionalized Persons Act, 42 U.S.C. § 2000cc(a). Marschner v. Marschner, No. 25-1349: Under the Uniformed Services Former Spouses’ Protection Act (“USFSPA”), a veteran’s longevity-based retirement pay can be divided in a divorce, but retirement pay based on disability and retirement pay that was waived to receive disability pay are indivisible. The question presented is: Does the USFSPA require state courts to refuse enforcement of indemnification provisions in a divorce settlement agreement?

Insights

SEC Proposes Expansion of Investment Adviser Performance-Based Compensation Rule

On September 30, 2026, the Securities and Exchange Commission (the “SEC”) proposed amendments to Rule 205-3 under the Investment Advisers Act of 1940, as amended (the “Advisers Act”), which provides an exemption from the general prohibition under Section 205(a)(1) of the Advisers Act on registered investment advisers receiving performance-based compensation (the “Proposal”) so long as performance-based compensation is limited to “qualified clients”.1 Most notably for private fund sponsors, the Proposal would expand the definition of “qualified client” to include any investors that satisfy the “accredited investor” definition under Regulation D. The Proposal may also have implications for private fund managers that rely on exemptions from investment adviser registration under state law because certain state-level investment adviser registration exemptions incorporate or otherwise reference the federal qualified client definition. Expansion of the Qualified Client Definition Under the current Rule 205-3, an investor generally may qualify as a qualified client if, among other alternatives, the investor has at least $1.4 million under management with the adviser or has a net worth exceeding $2.7 million. These thresholds are higher than the financial thresholds applicable to many accredited investors under Regulation D. As a result, an investor may currently qualify as an accredited investor for purposes of investing in a private offering without qualifying as a qualified client for purposes of paying performance-based compensation. The Proposal would expand the qualified client definition to include any natural person or legal entity investor that satisfies the accredited investor definition under Regulation D. The Proposal would also remove the assets under management and net worth thresholds under the current Rule 205-3 qualified client test. For private funds relying on Section 3(c)(1) of the Investment Company Act of 1940, this change could reduce the need to apply a separate qualified client standard to investors that already qualify as accredited investors. Dorsey Observations and Next Steps If adopted as proposed, the expanded qualified client definition could be particularly significant for private fund managers. Most private fund offerings are already limited to accredited investors under Regulation D. However, the Proposal could expand the pool of prospective investors available to emerging private fund managers while reducing the regulatory burden associated with complying with Rule 205-3. The Proposal could also benefit advisers operating below the SEC registration threshold that rely on a state private fund adviser exemption. A number of states have adopted exemptions modeled on the North American Securities Administrators Association (“NASAA”) private fund adviser exemption, which may condition relief for advisers to certain funds relying on Section 3(c)(1) on each beneficial owner satisfying the federal qualified client definition. However, state requirements vary, and any effect of the Proposal would depend on the text of the applicable state exemption and how it incorporates Rule 205-3. Many emerging private fund managers may have a larger network of accredited investor relationships than qualified client relationships during the early stages of their investment advisory business. Currently, under Rule 205-3, private fund managers may receive performance-based compensation from investors who do not satisfy the qualified client definition if those investors were admitted to their private funds prior to registration with the SEC. Following registration with the SEC, however, managers may continue to permit investors that are not qualified clients to invest in future private funds but may not receive performance-based compensation from those investors with respect to such investments. In addition, because the net worth and assets under management thresholds for qualified client status are adjusted for inflation every five years, the pool of qualified client investors may diminish over time as previously eligible investors no longer satisfy the applicable thresholds. The Proposal could provide the dual benefit of greater flexibility for private fund managers to establish and maintain relationships with accredited investors as their businesses scale and they become registered with the SEC, and greater flexibility for certain accredited investors to participate in investment strategies that historically have been restricted to much larger institutional investors. Unless and until the Proposal is adopted, investment advisers should continue to comply with the existing qualified client requirements. If the Proposal is adopted, private fund sponsors should consider whether corresponding changes are appropriate for their subscription documents, investor questionnaires, and other offering materials. Advisers that are state-registered or rely on a state-level exemption should also consult the laws and regulations of each relevant jurisdiction before changing investor eligibility standards or performance-based compensation practices, because adoption of the federal amendments may not automatically modify state requirements. Comments on the Proposal will be due 60 days after publication in the Federal Register. 1 Investment Adviser Performance-Based Compensation Modernization, Investment Advisers Act Release No. IA-7022 (Sept. 30, 2026), available at https://www.sec.gov/rules-regulations/2026/09/s7-2026-28#33-11443proposed.

Insights

EPA Limits Title V Re-Litigation of NSR Permits

Overview On September 25, 2026, the U.S. Environmental Protection Agency (“EPA”) published a final rule that significantly limits the ability of third parties to use the Clean Air Act (“CAA”) Title V permitting process to revisit New Source Review (“NSR”) permitting decisions years after those decisions were made. The rule establishes that NSR permitting determinations generally must be challenged during the original permitting proceeding, thereby providing regulated sources with greater permitting certainty and finality for major capital projects. Published in the Federal Register titled Clarifying the Scope of “Applicable Requirements” Under State Operating Permit Programs and the Federal Operating Permit Program (Docket ID No. EPA-HQ-OAR-2023-0401), the rule amends 40 C.F.R. Parts 70 and 71 to codify EPA’s interpretation regarding when requirements established under other CAA programs may be reviewed, modified, or implemented through the Title V operating permit program. The rule becomes effective 30 days after publication. The rule addresses two principal issues: (1) the relationship between NSR preconstruction permitting and Title V operating permits, and (2) the treatment of the General Duty Clause under CAA section 112(r)(1). Most significantly, the rule provides greater certainty for sources navigating the NSR permitting process. EPA’s amendments are intended to ensure that NSR permitting decisions made through an approved public process are generally not revisited later through Title V permit proceedings. The rule responds to a circuit split between the U.S. Courts of Appeals for the Fifth and Tenth Circuits. In Environmental Integrity Project v. EPA, 969 F.3d 529 (5th Cir. 2020), the Fifth Circuit upheld EPA’s interpretation, concluding that it was consistent with the text, structure, and purpose of Title V. In contrast, the Tenth Circuit reached the opposite conclusion in Sierra Club v. EPA, 964 F.3d 882 (10th Cir. 2020), finding that the then-existing regulatory definition of “applicable requirement” did not support EPA’s position. By amending the regulatory language on which the Tenth Circuit relied and codifying the interpretation approved by the Fifth Circuit, EPA has established a nationwide framework governing the interaction between NSR and Title V. NSR and Title V: EPA Establishes a Uniform Nationwide Framework At the core of the rule is EPA’s effort to define the respective roles of NSR and Title V. The rule codifies the approach EPA has applied since 2017: once a source obtains an NSR permit under an EPA-approved permitting program, and that permit was issued following public notice with an opportunity for comment and judicial review, the permit establishes the NSR-related “applicable requirements” of the State Implementation Plan (“SIP”) or Federal Implementation Plan (“FIP”) for Title V purposes. Under this framework, Title V is not a vehicle for re-examining underlying NSR permitting decisions. EPA does not intend to use the Title V process to revisit applicability determinations, emissions calculations, control technology determinations, permit conditions, or other issues resolved through the NSR permitting process. This principle applies regardless of the stage of the Title V proceeding; whether the NSR permit was issued pursuant to a SIP or FIP; the type of NSR issue involved; or whether the NSR permit is incorporated into Title V sequentially or concurrently. Limited Exceptions EPA recognizes several circumstances in which NSR issues may still be reviewed through the Title V program: No NSR permit was issued at all; The permit was issued without public notice and an opportunity for comment and judicial review; or The issue involves substantive overlap between Title V and NSR requirements, such as the adequacy of monitoring provisions. As a result, the rule does not insulate unpermitted projects or foreclose review of matters that independently arise under Title V. Key Regulatory Amendments The rule revises the definition of “applicable requirement” in 40 C.F.R. §§ 70.2 and 71.2. Paragraph (1): Where an NSR permit is issued with public notice and an opportunity for comment and judicial review, the permit establishes and defines the applicable SIP or FIP requirements for Title V purposes. Paragraph (2): All NSR permit terms, including terms contained in minor NSR permits, constitute applicable requirements that must be incorporated into Title V permits. Paragraph (4): CAA section 112(r)(1) (the General Duty Clause) is expressly excluded from the definition of “applicable requirement,” while section 112(r)(7) Risk Management Program requirements remain included. EPA also amended 40 C.F.R. §§ 70.8 and 70.12 to clarify that alleged defects in requirements established outside the Title V process generally do not provide a basis for EPA objection to a Title V permit or for a Title V citizen petition. General Duty Clause Exclusion The rule also codifies EPA’s longstanding position that the General Duty Clause in CAA section 112(r)(1) is not an “applicable requirement” for Title V purposes. EPA points to several considerations supporting that conclusion, including the distinction between the General Duty Clause and Title V permit terms, the provision’s origins in the Occupational Safety and Health Act’s general duty clause, and the different enforcement structures applicable to the General Duty Clause and Title V permit requirements. Importantly, excluding section 112(r)(1) from the definition of “applicable requirement” does not eliminate EPA’s authority to enforce the General Duty Clause independently of the Title V program. The final rule instead clarifies that the General Duty Clause need not—and should not—be incorporated into Title V permits as an applicable requirement. Practical Implications for Regulated Sources Greater Finality for NSR Permits  For projects requiring PSD, nonattainment NSR, or minor NSR permits, the permitting process becomes the primary forum for resolving disputes regarding applicability determinations, emissions calculations, control technology requirements, offsets, and permit conditions. Once an NSR permit is issued through a qualifying public process, regulated sources should face substantially reduced risk that those same issues will be challenged years later through Title V permit proceedings. Reduced Risk of Collateral Permit Challenges Stakeholders have sometimes sought to use Title V permit issuance, renewal, revision, or citizen-petition proceedings to challenge underlying NSR determinations. The final rule makes clear that Title V is not the appropriate vehicle for challenging whether an applicable requirement was correctly established in the first instance. This should reduce the risk of permit delays and uncertainty associated with collateral challenges to previously issued NSR permits. The rule does not, however, eliminate all Title V challenges relating to an NSR permit. Challenges concerning the Title V permit itself—including whether it appropriately incorporates applicable requirements or contains adequate compliance provisions—remain possible. Increased Importance of the Initial NSR Proceeding Because Title V generally will not provide a second opportunity to challenge the substantive validity of an NSR determination, the administrative record developed during the NSR process becomes increasingly important. Permit applicants should ensure that applicability analyses, emissions calculations, control technology evaluations, modeling demonstrations, and supporting technical documentation are thoroughly developed during the original permitting proceeding. For significant projects, applicants may therefore have an additional incentive to identify and resolve potential permitting issues before the NSR permit is issued rather than assuming that unresolved issues can be addressed during a subsequent Title V proceeding. Potential Incentive for Broader Public Participation EPA also notes that permitting authorities may choose to provide public notice and an opportunity for comment for a broader range of NSR permits because permits issued through a qualifying public process receive the benefit of the finality framework established by the rule. Some permitting authorities may conclude that greater public participation at the NSR stage is preferable to uncertainty during subsequent Title V proceedings. Conclusion The final rule is principally a permitting-certainty measure. For sources that obtain NSR permits through a public process, EPA has substantially limited the ability of third parties to revisit underlying NSR determinations through the Title V program. As a result, regulated entities should benefit from greater finality regarding key permitting decisions, reduced risk of collateral permit challenges, and increased certainty when planning and implementing capital projects.