Client Alert

The Supreme Court Considers The Fate of SEC ALJs

April 25, 2018

Download as a PDF

Share this page

The fate of SEC Administrative Law Judges (“ALJ”) – and perhaps those at other federal agencies – hung in the balance as oral argument was held before the Supreme Court on Monday, April 23, 2018. The question being considered is whether  the ALJs held their positions in contravention of the Constitution’s Appointments Clause.  In Raymond J. Lucia v. SEC,  No. 17-130 repeated questions from the Justices probed the positions of the advocates, reflecting a skepticism of claims by each sides that the Court’s prior decisions supported the rule of decision each advocated.  During the arguments the Justices as times stated they were unclear as to the proper test to be applied.  Concern was repeatedly expressed regarding the impact of the decision on the federal government.

The question being debated centered on the Appointments Clause of the Constitution and whether SEC ALJs are  Officers within the meaning of the Clause.  The parties agree that the Clause creates three categories of federal civil servants:  Principal Officers, Inferior Officers and employees.  Principal Officers are appointed by the President with the advice and consent of the Senate; Inferior Officers (usually referred to as Officers) can be appointed under law by the President, a department head or an agency; employees can simply be hired.  While SEC ALJs traditionally were viewed as employees, when Lucia reached the Supreme Court after the D.C. Circuit rejected challenges to that practice,  the agency and Solicitor General switched sides, adopting Petitioner’s view that they are Officers.  The SEC offered a ratification process to try and correct the error confessed.   

Briefs for each of the parties – Petitioner, Solicitor General and Court appointed Amicus who defended the decision below – all discussed the Court’s prior decisions at length (summarized and analyzed here).  While each side adopted different views of what the Clause required to be an Officer, each claimed its view was consistent with the Court’s jurisprudence.  The arguments did not seem to yield any clear consensus on the appropriate resolution of the dispute. 

Petitioners 

Petitioner began by stating the rule he advocated:  “SEC ALJs have been invested with the sovereign power to preside over formal adjudications.  They are officers under all of this Court’s precedents, particularly Freytag [Frytag v. Comm’r,  501 U.S. 868 (1991)] and Edmond [Edmond v. U.S.,  520 U.S. 651 (1997)], and any textually and historically accurate construction of the Appointments Clause.”  In exercising that authority under the tutelage of the SEC, those ALJs have “independence in their decisional functions, their hearing functions, and their evidentiary functions.”    And, the decision of the ALJ is final unless the agency decides to review it. 

Justice Kennedy raised one of the points that would reoccur throughout the arguments - -the impact of the Court’s decision on other agencies:  “[I]f we follow your theory of the case and – and you prevail, what effect, if any will that have on ALJs in other agencies, Social Security ALJs?”  Petitioner noted that this case is limited to adversarial proceedings subject to Sections 556 and 557 of the Administrative Procedure Act (“APA”):  “There are approximately 150 ALJs who fit that definition, which is not Social Security ALJs, by the way, in the federal government, in 25 agencies.”    Indeed, the APA provides that “an on-the record adjudication . . . can be done by three people only: The agency, a member of the agency, or an ALJ.   And words are known by the company they keep.  These are all officers.”   

Justice Kagan  turned the discussion to the question of Petitioner’s overall position which she termed “odd” since he claimed to have suffered through a bias proceedings but now wants to correct that by making the ALJs directly accountable to the agency under the Appointments Clause:  “See, there’s something that strikes me as – as a little bit odd about this argument because . . . if we just take a step back a little bit.  I mean, you have some real complaints about this process and how it happened and the bias that you think the ALJ showed.  And if that’s a problem, it’s a hard context in which to think that the solution to the problem is . . . the greater political accountability that comes from the Appointments Clause” and having the ALJs directly accountable to the agency.   

Petitioner responded by returning to the APA, noting that the statute gives the characteristics of an Officer as detailed in their brief.  Justice Kennedy stepped in, however, stating “So then you’re saying assume, as Justice Kagan’s question indicates, that it’s important to the perception of justice that the adjudicator be independent.  Which way does that cut as to your argument?”  As time expired, Petitioner responded that “it’s important for regulated entities, the Commission, the judges, and the courts that review their decisions to know that they are structurally independent, that they are structurally dependent even if they have statutory decisional independence.”  

Solicitor General

The Solicitor began by summarizing its position on the critical question regarding the test for determining who is an Officer within the meaning of the Clause:  “Under Buckley [Buckley v. Valeo,  424 U.S. 1 (1976)] and Freytag, a constitutional officer occupies a continuing position that’s been vested by law with significant discretion to do one of two things: Either to bind the government or third-parties on important matters or to undertake other important sovereign functions.  Here, the Commission’s ALJs have been vested by statute with both powers. They adjudicate disputes that impose liability . . . and they can and do issue binding decisions.”  

Justice Breyer then began a series of questions on issues ranging from whether ALJ’s are protected from dismissal if they decide a case in a manner that does not conform to agency policy to what the impact of adopting Petitioner’s proposed rule would be on the civil service while stating that he is unclear how to decide the case.  At one point, for example, the Justice stated:  “And I think frankly, I don’t know how do decide this case for the following reason:  I don’t think it would make much difference but for the decision in the PCAOB case, Free Enterprise [Free Enter. Fund v. PCAOB,  561 U.S. 477 (2010)].  When I read that decision and combine it with this, then I think if I adopt your approach, good-bye to the merit civil service at the higher levels and good-bye to independence of ALJs . . . So how do I decide this case?”  

After discussing the Justice’s dissent in Free Enterprise the Solicitor noted:   “I think the way to decide this case. . . I think what you’d say is Freytag sets up a two-part test for when you’re an officer of the United States.  ALJs satisfy both.  So you don’t even need to decide whether one or the other is sufficient or necessary.” 

Subsequently, Justice Kennedy returned to the issue of the perception of fairness:  “Assume that the perception and fact of fairness and – impartiality are enhanced by independence.  How does that factor into what you’re arguing, and is it a proper consideration for us in this case?”   The Solicitor noted that this is a proper consideration, stating that fairness was a key issue when the APA was enacted.  Continuing he stated that “The idea behind the Appointments Clause is you’ve got to have a clear line of accountability.  And this Court said in Freytag and Free Enterprise, when you diffuse the appointment power, you diffuse accountability.”  

As the Solicitor’s time came to an end, Justice Gorsuch posed the first question about remedies:  “What is the effect of the SEC’s remedial order purporting to ratify the appointment of the . . . ALJs?”   The Solicitor allowed that it is consistent with prior decisions  on the question in contrast to Petitioner’s contention that the SEC’s approach “repeats the problem.”  

Court appointed Amicus: 

Amicus began with a reiteration of his test for determining who is an Officer within the meaning of the Clause:  “[A]n officer of the United States is someone with the power to bind the government or private parties in the name of his own office.  In contrast, someone whose acts have no binding effect without the sanction of an officer is not himself an officer of the United States.”  

Chief Justice Roberts immediately turned to the Court’s decision in Frytag -- the Court held that Special Trial Judges at the Tax Court who could in some instances enter a final decision but not in others were Officers – and how it fit into the proposed test:  “If I were trying to figure out who an officer is, I think I might have started with Freytag.  And your test that you just proposed doesn’t seem similar to what Freytag talked about . . .”  Amicus responded by point to the fact that the Special Trial Judges in that case had the power to hold a person in contempt, authority which is consistent with the proposed test, although he allowed that Freytag  has two branches of which this is only one.  Justice Kagan followed-up, noting that “it’s hard to think . . . that Frytag really thought that that as all important.”  Amicus responded by agreeing that “you could read Freytag broadly, obviously, much more broadly than the rule we’re proposing, but you don’t have to read it that way.  I’m not making a claim about what was in the Court’s mind. . .”  In the end however the judges in that case have “the power to bind” which is crucial.  

Justice Breyer then returned to the question of other agencies and statutory schemes:  “The problem I have with this, the whole thing, is I have no idea of what the nature of jobs are throughout the civil service. . . I don’t know that anyone in this case has methodically gone through civil service positions to tell me whether or not, if we decide one way or the other and on the theory, we are driving wedges of dependence into what was to be since Chester Alan Arthur a merit-based civil service.”  Amicus agreed: “I completely agree with you, Justice Breyer, that that is a concern, which is why our test doesn’t turn on importance [of the functions performed].”   

The Chief Justice then returned to the question of the Court’s prior precedents:  “Counsel . . . [Petitioner] said in his reply brief, ‘This Court has never held that an adjudicatory official is not an officer.’ Do you agree with that?”  Amicus responded “Yes, but an adjudicatory official is somebody that gets to decide a case . . . to bind the parties at the end of the day . . .” which is key to his proposed rule.  

Later the Chief Justice turned to the question of the accountability of the Officer, noting: “One of the principles that caused the drafters to give the authority to appoint officers to the President was the important one of accountability.”  Amicus responded: “Exactly. . . I think the Commission [SEC] is going to be held 100 percent accountable for every single decision. . .” which again is one of the predicates for his proffered rule.   

Finally, Justice Kagan queried the source of Amicus’ proposed rule while allowing  that she liked it.  Amicus noted that it traced in part to an early state court decision in 1822  and “the second part of our test, which asks whether somebody’s authorized to act in the name of their own office or only in the name of somebody else’s office, just reflects that principle, which I think is, as we’ve talked about, ubiquitous in actual government practice.”   

Petitioner’s rebuttal

The argument concluded with a brief rebuttal by Petitioner.  First, Petitioner claimed that the test proposed by Amicus applies to Principal Officers but not Inferior Officers.  Second, SEC ALJs lack the authority to make final decisions.  Finally, if the case is reversed the proceeding below should be viewed as a nullity and dismissed because of the significant Constitutional error.  

Comment 

While each side claimed the prior decisions of the Court were in accord with its position, as the questioning from the bench demonstrated, that determination, at best, depends on how those decisions are read and interpreted.  While there were questions and points during the argument which suggested that the Court may view Freytag and perhaps it's other decisions as controlling, clearly the Justices are troubled by the proposed tests.  One key point is the impact on the federal government and the civil service.  Justice Breyer, for example, repeatedly returned to this issue throughout the argument as did other members of the Court. Another critical issue concerned the overall fairness of the process as well as the perceived fairness, as Justice Kennedy repeatedly noted. 

Finally, the issue of remedies is key. Although this topic was little discussed, it was clear that the potential impact of the decision on not just the SEC but other federal agencies and perhaps even terminated cases – a point only very briefly mentioned by the Solicitor -- are issues which concern the Court.   In the end, perhaps the clearest point is that a case which many once viewed as a foregone conclusion in view of the confession of error is anything but that.  A decision will be handed down by the end of June. 

Firm Highlights

Insights

Energy Law: Month in Review - September 2026

Welcome to Dorsey’s Energy Law: Month in Review. We provide this update to our clients to identify significant developments in the previous month. Please reach out to any of the authors, listed above, to discuss these issues. Regulatory Developments Massachusetts Ratchets Up State and Local Regulation of AI Data Centers In early September, Governor Maura Healey of Massachusetts signed an executive order requiring that artificial intelligence data centers secure the approval of local communities as a precondition to proceeding with a given project. According to the terms of the order, data center developers will need to secure a “community benefits agreement” as a precondition to receiving permits from numerous state agencies, including the Department of Environmental Protection, the Energy Facilities Siting Board, and the Massachusetts Environmental Policy Act Office. Beyond requiring community benefits agreements, the order also mandates that developers mitigate utility costs to consumers, prohibits the use of nondisclosure agreements, and requires various state agencies to develop measures to limit data center impacts on the environment. North Carolina Regulators Decline Approval of Duke Energy Gas Turbine On September 18, 2026, North Carolina Utilities Commission (NCUC) denied Duke Energy’s application for a certificate of public convenience and necessity required to construct a gas-fueled combustion turbine at its Smith Energy Complex in North Carolina. The NCUC objected strongly to the $584 million price tag and noted that Duke appeared to be constructing the facility “based on anticipated data center customer additions.” The NCUC rejected that anticipated growth as “insufficiently reliable for the Commission to act at this point.” In rejecting Duke’s application, the NCUC also noted that Duke had signed the White House Ratepayer Protection Pledge, in which it represented that it would not shift data center costs to consumers. The NCUC observed that the record did not demonstrate how Duke “intends to adhere to its commitments under the Ratepayer Protection Pledge with regard to the Proposed Facility.” Notably, commission staff had actually supported the construction of the turbine, citing concerns about Duke’s reserve margins. The NCUC noted that it “understands the Public Staff’s expressed concerns,” but those concerns were outweighed by the NCUC’s reservations, including questions of demand. Department of Energy Approves Funds for Grid Improvement The U.S. Department of Energy (DOE) recently announced that it would fund 31 grid-improvement projects in 26 states. The funding initiative is part of the DOE’s “SPARK” initiative. The funding will include $1.9 billion in federal funding from DOE and $3.35 billion in recipient cost-sharing funding. The funds will go to projects designed to improve grid reliability and lower electricity costs. Recipients plan to reconductor over 1,500 miles of transmission lines and will deploy grid-enhancing technologies across approximately 21,000 miles. DOE stated that this initiative will make available over 23 additional gigawatts of electricity. Texas Moderates Rules Governing Data Center Interconnection The Texas Public Utility Commission adopted new regulations governing large-load interconnections. The rules impose a flat study fee of $100,000 for all proposed interconnections, which departs from the initial proposal to impose study fees using a tiered system based on project size. Additionally, the final rule eliminates the PUC’s previous proposal to impose a non-refundable interconnection fee of $50,000 per MW of contracted peak demand. The final rule also moderates the initially proposed regulations governing Electric Reliability Council of Texas (ERCOT) notifications for large-load customers’ non-utilized capacity. The proposed rules would have required notifying ERCOT within 30 days of missing a scheduled energization milestone by six months. The final rules, however, do not require informing ERCOT unless a scheduled energization milestone is missed by 24 months. FERC Denies TransAlta 202(c) Cost-Recovery Plan The Federal Energy Regulatory Commission (FERC) recently rejected TransAlta’s plan to recover $19.9 million in expenses stemming from a DOE order in which DOE prohibited TransAlta from retiring its coal-powered Centralia power plant. TransAlta had previously intended to retire the facility at the end of 2025. TransAlta’s cost recovery plan proposed spending an additional $23 million on repairs to continue operating the unit. FERC’s main objection had to do with geographic scope. TransAlta’s recovery plan called for recovering costs from California Independent System Operator (CAISO) and the Southwest Power Pool (SPP), but the DOE’s order requiring operation of the plant was designed to ensure reliability in the Northwest assessment area (Montana, Oregon, Washington, and parts of northern California and northern Idaho). Accordingly, FERC was unwilling to allow cost recovery from CAISO and SPP when the order that precipitated the additional costs only related to the Northwest assessment area. FERC informed TransAlta that it would only approve cost recovery from load-serving entities in the Northwest assessment area. FERC’s decision comes amid a rush of DOE emergency orders requiring the continued operation of coal-fired generating units. Litigation Appeals Court Upholds Washington Hydropower Plant With Caveats In a September 21, 2026, opinion, the Washington Court of Appeals largely upheld a Clean Water Act water quality certification by the Washington Department of Ecology for the Goldendale Energy Storage Project, a proposed pumped-water storage hydropower system adjacent to, but off-stream from, the Columbia River. A nonprofit (Columbia Riverkeeper) and the Confederated Tribes and Bands of the Yakama Nation appealed the certification, contending that it failed to impose necessary conditions and monitoring requirements to protect the water quality of the Columbia River. Most saliently, the plaintiffs argued that the project had the potential to leak 100 acre-feet of water per year into tributaries of the Columbia River. The Court of Appeals broadly rejected plaintiffs’ challenge to the state’s conclusion that “the project was designed not to leak.” That said, the Court of Appeals did reverse on one narrow issue. Specifically, the court determined that the state’s conclusion that “leakage from the project’s tunnels would be monitored and reported” was not supported by the evidence because the certification “does not explicitly require monitoring and reporting to determine whether there is any leakage.” Accordingly, the court remanded the matter to the state to impose monitoring and reporting requirements but otherwise affirmed the certification. Legislative Developments California Legislates Restrictions on Data Center Energy Use and Grid Costs On September 21, 2026, California Governor Gavin Newsom signed seven bills broadly regulating data centers in the state. SB 1168 directed the California Public Utilities Commission to assess the energy used by data centers. It also requires the PUC to pass costs of transmission and distribution upgrades and load increases on to data centers, rather than customers. SB 886 and SB 887 compel data centers to pay for infrastructure upgrade and generation costs, and wildfire mitigation costs, in addition to imposing environmental review. The statutes additionally increase local oversight of data centers. AB 1577 imposes a monthly reporting requirement that requires data centers to supply energy consumption and efficiency data to the California Energy Commission. AB 2383 contains incentives for data centers to use onsite clean energy generation. Finally, AB 2469 and AB 2619 require data center developments to assess water supply and develop a water scarcity plan. The statutes also mandate statewide water reporting as a precondition to obtaining and renewing business licenses.

Insights

The Supreme Court Update - October 8, 2026

On September 29, 2026, the Supreme Court granted certiorari in one case: Department of Homeland Security v. D.V.D., No. 26-426: This case concerns the Trump Administration’s “third-country removal” procedures, where immigrants are deported to countries not listed in the removal orders. In granting certiorari, the Court granted the Government’s application to stay a lower court decision halting the practice, which will allow third-country removals to continue pending resolution of the case. The issues presented are: (1) Whether the district court had jurisdiction over respondents’ claims; (2) whether the district court had authority to enter class-wide declaratory relief and APA vacatur under 8 U.S.C. § 1252(f)(1); (3) whether the Government’s guidance on third-country removals is unlawful under 8 U.S.C. § 1231(b), the due process clause, or FARRA/CAT and its implementing regulations; and (4) such other questions that the Government determines are appropriate for the proper disposition of the case. On October 1, 2026, the Court granted certiorari in three additional cases: Rhoney v. Barbosa da Cunha, No. 26-104: Immigration officials detained Ricardo Aparecido Barbosa da Cunha—a Brazilian citizen who had lived in the United States for approximately twenty years after entering without inspection—and denied him a bond hearing under 8 U.S.C. § 1225(b)(2)(A). The Second Circuit held that his detention was instead governed by § 1226(a), which permits release on bond, because § 1225(b)(2)(A)’s mandatory-detention requirement applies only to noncitizens apprehended while entering the country or shortly thereafter. The question presented is: Whether 8 U.S.C. § 1225(b)(2)(A) mandates the detention pending removal proceedings of aliens who, like Barbosa da Cunha, are present in the United States without having been admitted. Missionaries of St. John the Baptist, Inc. v. Frederic, No. 25-113: A Catholic religious organization sought to build a shrine to the Virgin Mary on land the organization owned adjacent to its church in Park Hills, Kentucky. Local zoning restrictions prohibited the proposed construction. The question presented is: Whether a land-use regulation that prohibits a religious institution from building a religious structure on its own property constitutes a “substantial burden” on religious exercise under the Substantial Burden Provision of the Religious Land Use and Institutionalized Persons Act, 42 U.S.C. § 2000cc(a). Marschner v. Marschner, No. 25-1349: Under the Uniformed Services Former Spouses’ Protection Act (“USFSPA”), a veteran’s longevity-based retirement pay can be divided in a divorce, but retirement pay based on disability and retirement pay that was waived to receive disability pay are indivisible. The question presented is: Does the USFSPA require state courts to refuse enforcement of indemnification provisions in a divorce settlement agreement?

Insights

EPA Limits Title V Re-Litigation of NSR Permits

Overview On September 25, 2026, the U.S. Environmental Protection Agency (“EPA”) published a final rule that significantly limits the ability of third parties to use the Clean Air Act (“CAA”) Title V permitting process to revisit New Source Review (“NSR”) permitting decisions years after those decisions were made. The rule establishes that NSR permitting determinations generally must be challenged during the original permitting proceeding, thereby providing regulated sources with greater permitting certainty and finality for major capital projects. Published in the Federal Register titled Clarifying the Scope of “Applicable Requirements” Under State Operating Permit Programs and the Federal Operating Permit Program (Docket ID No. EPA-HQ-OAR-2023-0401), the rule amends 40 C.F.R. Parts 70 and 71 to codify EPA’s interpretation regarding when requirements established under other CAA programs may be reviewed, modified, or implemented through the Title V operating permit program. The rule becomes effective 30 days after publication. The rule addresses two principal issues: (1) the relationship between NSR preconstruction permitting and Title V operating permits, and (2) the treatment of the General Duty Clause under CAA section 112(r)(1). Most significantly, the rule provides greater certainty for sources navigating the NSR permitting process. EPA’s amendments are intended to ensure that NSR permitting decisions made through an approved public process are generally not revisited later through Title V permit proceedings. The rule responds to a circuit split between the U.S. Courts of Appeals for the Fifth and Tenth Circuits. In Environmental Integrity Project v. EPA, 969 F.3d 529 (5th Cir. 2020), the Fifth Circuit upheld EPA’s interpretation, concluding that it was consistent with the text, structure, and purpose of Title V. In contrast, the Tenth Circuit reached the opposite conclusion in Sierra Club v. EPA, 964 F.3d 882 (10th Cir. 2020), finding that the then-existing regulatory definition of “applicable requirement” did not support EPA’s position. By amending the regulatory language on which the Tenth Circuit relied and codifying the interpretation approved by the Fifth Circuit, EPA has established a nationwide framework governing the interaction between NSR and Title V. NSR and Title V: EPA Establishes a Uniform Nationwide Framework At the core of the rule is EPA’s effort to define the respective roles of NSR and Title V. The rule codifies the approach EPA has applied since 2017: once a source obtains an NSR permit under an EPA-approved permitting program, and that permit was issued following public notice with an opportunity for comment and judicial review, the permit establishes the NSR-related “applicable requirements” of the State Implementation Plan (“SIP”) or Federal Implementation Plan (“FIP”) for Title V purposes. Under this framework, Title V is not a vehicle for re-examining underlying NSR permitting decisions. EPA does not intend to use the Title V process to revisit applicability determinations, emissions calculations, control technology determinations, permit conditions, or other issues resolved through the NSR permitting process. This principle applies regardless of the stage of the Title V proceeding; whether the NSR permit was issued pursuant to a SIP or FIP; the type of NSR issue involved; or whether the NSR permit is incorporated into Title V sequentially or concurrently. Limited Exceptions EPA recognizes several circumstances in which NSR issues may still be reviewed through the Title V program: No NSR permit was issued at all; The permit was issued without public notice and an opportunity for comment and judicial review; or The issue involves substantive overlap between Title V and NSR requirements, such as the adequacy of monitoring provisions. As a result, the rule does not insulate unpermitted projects or foreclose review of matters that independently arise under Title V. Key Regulatory Amendments The rule revises the definition of “applicable requirement” in 40 C.F.R. §§ 70.2 and 71.2. Paragraph (1): Where an NSR permit is issued with public notice and an opportunity for comment and judicial review, the permit establishes and defines the applicable SIP or FIP requirements for Title V purposes. Paragraph (2): All NSR permit terms, including terms contained in minor NSR permits, constitute applicable requirements that must be incorporated into Title V permits. Paragraph (4): CAA section 112(r)(1) (the General Duty Clause) is expressly excluded from the definition of “applicable requirement,” while section 112(r)(7) Risk Management Program requirements remain included. EPA also amended 40 C.F.R. §§ 70.8 and 70.12 to clarify that alleged defects in requirements established outside the Title V process generally do not provide a basis for EPA objection to a Title V permit or for a Title V citizen petition. General Duty Clause Exclusion The rule also codifies EPA’s longstanding position that the General Duty Clause in CAA section 112(r)(1) is not an “applicable requirement” for Title V purposes. EPA points to several considerations supporting that conclusion, including the distinction between the General Duty Clause and Title V permit terms, the provision’s origins in the Occupational Safety and Health Act’s general duty clause, and the different enforcement structures applicable to the General Duty Clause and Title V permit requirements. Importantly, excluding section 112(r)(1) from the definition of “applicable requirement” does not eliminate EPA’s authority to enforce the General Duty Clause independently of the Title V program. The final rule instead clarifies that the General Duty Clause need not—and should not—be incorporated into Title V permits as an applicable requirement. Practical Implications for Regulated Sources Greater Finality for NSR Permits  For projects requiring PSD, nonattainment NSR, or minor NSR permits, the permitting process becomes the primary forum for resolving disputes regarding applicability determinations, emissions calculations, control technology requirements, offsets, and permit conditions. Once an NSR permit is issued through a qualifying public process, regulated sources should face substantially reduced risk that those same issues will be challenged years later through Title V permit proceedings. Reduced Risk of Collateral Permit Challenges Stakeholders have sometimes sought to use Title V permit issuance, renewal, revision, or citizen-petition proceedings to challenge underlying NSR determinations. The final rule makes clear that Title V is not the appropriate vehicle for challenging whether an applicable requirement was correctly established in the first instance. This should reduce the risk of permit delays and uncertainty associated with collateral challenges to previously issued NSR permits. The rule does not, however, eliminate all Title V challenges relating to an NSR permit. Challenges concerning the Title V permit itself—including whether it appropriately incorporates applicable requirements or contains adequate compliance provisions—remain possible. Increased Importance of the Initial NSR Proceeding Because Title V generally will not provide a second opportunity to challenge the substantive validity of an NSR determination, the administrative record developed during the NSR process becomes increasingly important. Permit applicants should ensure that applicability analyses, emissions calculations, control technology evaluations, modeling demonstrations, and supporting technical documentation are thoroughly developed during the original permitting proceeding. For significant projects, applicants may therefore have an additional incentive to identify and resolve potential permitting issues before the NSR permit is issued rather than assuming that unresolved issues can be addressed during a subsequent Title V proceeding. Potential Incentive for Broader Public Participation EPA also notes that permitting authorities may choose to provide public notice and an opportunity for comment for a broader range of NSR permits because permits issued through a qualifying public process receive the benefit of the finality framework established by the rule. Some permitting authorities may conclude that greater public participation at the NSR stage is preferable to uncertainty during subsequent Title V proceedings. Conclusion The final rule is principally a permitting-certainty measure. For sources that obtain NSR permits through a public process, EPA has substantially limited the ability of third parties to revisit underlying NSR determinations through the Title V program. As a result, regulated entities should benefit from greater finality regarding key permitting decisions, reduced risk of collateral permit challenges, and increased certainty when planning and implementing capital projects.

Insights

SEC Proposes Expansion of Investment Adviser Performance-Based Compensation Rule

On September 30, 2026, the Securities and Exchange Commission (the “SEC”) proposed amendments to Rule 205-3 under the Investment Advisers Act of 1940, as amended (the “Advisers Act”), which provides an exemption from the general prohibition under Section 205(a)(1) of the Advisers Act on registered investment advisers receiving performance-based compensation (the “Proposal”) so long as performance-based compensation is limited to “qualified clients”.1 Most notably for private fund sponsors, the Proposal would expand the definition of “qualified client” to include any investors that satisfy the “accredited investor” definition under Regulation D. The Proposal may also have implications for private fund managers that rely on exemptions from investment adviser registration under state law because certain state-level investment adviser registration exemptions incorporate or otherwise reference the federal qualified client definition. Expansion of the Qualified Client Definition Under the current Rule 205-3, an investor generally may qualify as a qualified client if, among other alternatives, the investor has at least $1.4 million under management with the adviser or has a net worth exceeding $2.7 million. These thresholds are higher than the financial thresholds applicable to many accredited investors under Regulation D. As a result, an investor may currently qualify as an accredited investor for purposes of investing in a private offering without qualifying as a qualified client for purposes of paying performance-based compensation. The Proposal would expand the qualified client definition to include any natural person or legal entity investor that satisfies the accredited investor definition under Regulation D. The Proposal would also remove the assets under management and net worth thresholds under the current Rule 205-3 qualified client test. For private funds relying on Section 3(c)(1) of the Investment Company Act of 1940, this change could reduce the need to apply a separate qualified client standard to investors that already qualify as accredited investors. Dorsey Observations and Next Steps If adopted as proposed, the expanded qualified client definition could be particularly significant for private fund managers. Most private fund offerings are already limited to accredited investors under Regulation D. However, the Proposal could expand the pool of prospective investors available to emerging private fund managers while reducing the regulatory burden associated with complying with Rule 205-3. The Proposal could also benefit advisers operating below the SEC registration threshold that rely on a state private fund adviser exemption. A number of states have adopted exemptions modeled on the North American Securities Administrators Association (“NASAA”) private fund adviser exemption, which may condition relief for advisers to certain funds relying on Section 3(c)(1) on each beneficial owner satisfying the federal qualified client definition. However, state requirements vary, and any effect of the Proposal would depend on the text of the applicable state exemption and how it incorporates Rule 205-3. Many emerging private fund managers may have a larger network of accredited investor relationships than qualified client relationships during the early stages of their investment advisory business. Currently, under Rule 205-3, private fund managers may receive performance-based compensation from investors who do not satisfy the qualified client definition if those investors were admitted to their private funds prior to registration with the SEC. Following registration with the SEC, however, managers may continue to permit investors that are not qualified clients to invest in future private funds but may not receive performance-based compensation from those investors with respect to such investments. In addition, because the net worth and assets under management thresholds for qualified client status are adjusted for inflation every five years, the pool of qualified client investors may diminish over time as previously eligible investors no longer satisfy the applicable thresholds. The Proposal could provide the dual benefit of greater flexibility for private fund managers to establish and maintain relationships with accredited investors as their businesses scale and they become registered with the SEC, and greater flexibility for certain accredited investors to participate in investment strategies that historically have been restricted to much larger institutional investors. Unless and until the Proposal is adopted, investment advisers should continue to comply with the existing qualified client requirements. If the Proposal is adopted, private fund sponsors should consider whether corresponding changes are appropriate for their subscription documents, investor questionnaires, and other offering materials. Advisers that are state-registered or rely on a state-level exemption should also consult the laws and regulations of each relevant jurisdiction before changing investor eligibility standards or performance-based compensation practices, because adoption of the federal amendments may not automatically modify state requirements. Comments on the Proposal will be due 60 days after publication in the Federal Register. 1 Investment Adviser Performance-Based Compensation Modernization, Investment Advisers Act Release No. IA-7022 (Sept. 30, 2026), available at https://www.sec.gov/rules-regulations/2026/09/s7-2026-28#33-11443proposed.