.

Client Alert

Recent Developments in Proxy Access

December 2, 2016

by Cam C. Hoang

Download as a PDF

Share this page

As the 2017 proxy season begins to unfold, proxy access continues to be a focus of shareholder proposals. Last year, companies that had already adopted mainstream proxy access bylaws, or that were planning to put mainstream proxy access bylaws up for a shareholder vote, were largely successful in being able to exclude shareholder proposals to adopt proxy access bylaws on the grounds that such proposals had already been “substantially implemented.” See our prior memos here and here. This year, companies have received a wave of new shareholder proposals seeking to amend their existing proxy access bylaws. See our prior memo here. Until recently, the SEC staff had generally denied requests to exclude such proposals. In two recent no-action letters, however, the staff has provided relief where the company adopted several of the requested amendments. In addition, for the first time in the United States, a shareholder attempted to use a proxy access bylaw to nominate a director candidate and to have that candidate included in the company’s proxy statement.

Proxy Access 2.0

In large part due to shareholder initiatives, approximately 300 companies have adopted proxy access bylaws during the past two years. The mainstream model adopted by a broad range of S&P 500 companies allows shareholders owning 3% of shares outstanding for at least 3 years to nominate up to 20% of the board (or in some cases, at least two members), with an aggregation limit of 20 shareholders to reach the ownership threshold.

A new wave of shareholder proposals coming this year seeks to amend existing proxy access bylaws, focusing on certain provisions that proponents believe limit the ability of shareholders to use proxy access effectively. These so-called “fix-it” amendments include the following:

  • Ownership Threshold -- reducing the eligibility requirement from 5% to 3% of the company’s stock.
  • Aggregation Cap -- increasing or eliminating the limit on the number of shareholders permitted to aggregate their holdings to reach the ownership threshold.
  • Board Cap -- increasing the limit on the number of nominees.
  • Renomination Limit -- eliminating or reducing the minimum number of votes received by a shareholder nominee in order for that nominee to be renominated in future years.
  • Continued Ownership Requirement -- eliminating the requirement that the proponent continue to hold shares following the annual meeting.
  • Treatment of Loaned Shares -- eliminating or liberalizing the conditions for loaned shares to be counted toward the ownership threshold.
  • Eligibility Requirements -- removing eligibility requirements for shareholder nominees that do not apply to other nominees.

To date, the staff has denied no-action relief to at least seven companies, including SBA Communications Corporation (February 12, 2016), H&R Block, Inc. (July 21, 2016), Microsoft Corporation (October 7, 2016), Apple, Inc. (October 27, 2016), The Walt Disney Company (November 3, 2016), Whole Foods Market, Inc. (November 3, 2016) and Walgreens Boots Alliance (November 7, 2016), that sought to have shareholder proposals to amend existing proxy access bylaws excluded on the grounds that the “essential objective” of the shareholder proposal had already been “substantially implemented,” even though the proposal differed from certain specific terms of the bylaw. In applying the “substantially implemented” standard of Rule 14a-8(i)(10), the staff seemed to be distinguishing between a proposal to adopt a proxy access proposal and a proposal to amend an existing bylaw. The staff also rejected arguments that a proposal to amend more than one provision of a proxy access bylaw constituted more than one proposal under Rule 14a-8(c).

In two no-action letters issued to Oshkosh Corporation (November 4, 2016) and NVR, Inc. (March 25, 2016), however, the staff granted no-action relief on the grounds of “substantial implementation” where the company adopted some, but not all, of the proposed bylaw amendments. Oshkosh amended its existing proxy access bylaw to implement three of six requested changes after receiving such a proposal. Specifically, the company reduced the ownership threshold from 5% to 3%, eliminated the renomination threshold of 25% of the votes cast, and eliminated the requirement that the nominating shareholder represent that it continue to hold the requisite number of shares for a year following the annual meeting. Oshkosh did not adopt the three other proposed amendments to increase the number of eligible nominees to the greater of 25% or two directors from the greater of 20% or two directors, eliminate the aggregation cap of 20 shareholders and eliminate the requirement regarding loaned securities.

NVR also adopted half of the proposed amendments to its proxy access bylaws, reducing the ownership threshold from 5% to 3% and increasing the number of days within which loaned shares must be recallable to be counted toward the ownership threshold. NVR did not adopt proposals to eliminate the aggregation cap of 20 shareholders and to effectively eliminate the post-meeting holding requirement. It is interesting to note that, prior to the adoption by NVR of two of the four proposed amendments, the staff had denied NVR’s request to exclude all four amendments.

In both Oshkosh and NVR, the staff indicated that the company’s policies, practices and procedures compared favorably with the guidelines of the proposal, and therefore the company had substantially implemented the proposal. The distinguishing facts in these two letters when compared with the staff’s unsympathetic position on other proposals to amend proxy access bylaws are that both Oshkosh and NVR addressed some of the proposed amendments and one of those amendments was the reduction of the ownership threshold from 5% to the mainstream 3%. While the reduction in the ownership threshold was likely given weight by the staff, it is not clear how the number and nature of the proposals adopted by the companies impacted the staff’s decisions.

For the few companies where “fix-it” proposals have already gone to a vote, they received majority support at two companies and substantial support at other companies. Both proposals receiving majority support amended, among other provisions, the ownership threshold to reduce it from 5% to 3%. The “fix-it” proposals voted on so far at companies that have adopted a mainstream proxy access model of 3/3/20/20 were presented at Whole Foods and H&R Block, where the proposals received approximately 39% and 30% of the votes cast, respectively.

First (Attempted) Use of Proxy Access Bylaw

Until recently, proxy access bylaws had never actually been used by shareholders in the United States to advance director nominees. In addition, the conventional wisdom had been that proxy access bylaws, if used, would not likely be used by an activist shareholder because the benefits to the activist of being able to advance its arguments on behalf of its nominee through its own proxy soliciting materials would outweigh the related effort and expense. These are factors that many companies and their boards of directors have considered when deciding whether to voluntarily implement a proxy access bylaw.

That calculus changed on November 10, 2016 when GAMCO Investors, Inc. and its affiliated funds disclosed that they had nominated an individual for election to the board of directors of National Fuel Gas Company pursuant to the company’s recently adopted proxy access bylaw. GAMCO has beneficially owned more than 5% of National Fuel Gas since 2010 and has taken an activist role, advocating for the spin-off of certain operations including through a shareholder proposal at the company’s 2015 annual meeting. Mario Gabelli, Founder, Chairman and CEO of GAMCO, tweeted on November 14, 2016, that “proxy access was a friendlier approach than a proxy contest at National Fuel Gas.” The company subsequently announced that it would not include GAMCO’s nominee in the proxy statement, because only stockholders that acquire their shares “in the ordinary course of business and not with the intent to change or influence control” of the company are eligible to nominate a proxy access candidate under the company’s bylaws. GAMCO’s candidate subsequently withdrew, and GAMCO announced that it will not be pursuing proxy access at this time.

While the situation appears to have passed quickly for National Fuel Gas, it is clear that the concerns raised by the potential use of proxy access bylaws by shareholders are no longer merely theoretical. We expect that it will only be a matter of time before pension funds and other investors utilize proxy access bylaws to put forward their own director candidates.

What’s Next

In light of these and other developments to date relating to proxy access, we expect the following:

  • Pressure on companies that have not yet adopted proxy access is likely to continue into and through the 2017 proxy season. Approximately 40% of S&P 500 companies have already adopted proxy access bylaws proactively or following a shareholder proposal or negotiations with a proponent. That number is expected to grow to 50% of the S&P 500 by the end of the 2017 proxy season. Furthermore, small- and mid-cap public companies may see proxy access proposals in a trickle-down effect reminiscent of the majority voting and board declassification campaigns from earlier proxy seasons.
  • Companies should be preparing for the possibility of a proxy access bylaw proposal or a proposal to amend an existing bylaw.
  • The ability to exclude a shareholder proposal to adopt a proxy access bylaw based on substantial implementation remains very strong.
  • However, the ability to exclude a shareholder proposal to amend an existing proxy access bylaw on the basis of substantial implementation is not likely if the company does not adopt any of the proposed amendments and is highly likely if the company adopts a significant portion of the proposed amendments including an amendment to reduce the share ownership threshold from 5% to 3%. In situations between these two bookends, however, the scope and amount of changes required to obtain no-action relief is not clear.
  • Based on the SEC staff’s no-action position to date, even companies like Oshkosh and NVR who are able to successfully exclude shareholder proposals this year may receive another round of “fix-it” proposals next year relating to other provisions of their proxy access bylaws that shareholders find objectionable.
  • Companies that receive a “fix-it” proposal should be attuned to their investors’ policies and preferences on proxy access, and specifically, whether these investors would support the proposed amendments or whether they are satisfied with the existing bylaws. It may be instructive to consider ISS's FAQ #30, which describes the minimum acceptable proxy access terms, as well as problematic provisions, if a board were to implement proxy access in response to a majority supported shareholder proposal. Glass Lewis generally supports proxy access and will evaluate bylaws on a case-by-case basis, with attention to minimum ownership and holding period requirements, as well as company size, board independence and diversity, company performance, existence of anti-takeover protections, board responsiveness to shareholders and shareholders’ ability to act by written consent or call a special meeting.
  • When analyzing whether to adopt or amend proxy access bylaws, companies and their boards of directors should factor in the likely use of proxy access by pension funds and other investors.

Firm Highlights

Insights

The Supreme Court Update - October 8, 2026

On September 29, 2026, the Supreme Court granted certiorari in one case: Department of Homeland Security v. D.V.D., No. 26-426: This case concerns the Trump Administration’s “third-country removal” procedures, where immigrants are deported to countries not listed in the removal orders. In granting certiorari, the Court granted the Government’s application to stay a lower court decision halting the practice, which will allow third-country removals to continue pending resolution of the case. The issues presented are: (1) Whether the district court had jurisdiction over respondents’ claims; (2) whether the district court had authority to enter class-wide declaratory relief and APA vacatur under 8 U.S.C. § 1252(f)(1); (3) whether the Government’s guidance on third-country removals is unlawful under 8 U.S.C. § 1231(b), the due process clause, or FARRA/CAT and its implementing regulations; and (4) such other questions that the Government determines are appropriate for the proper disposition of the case. On October 1, 2026, the Court granted certiorari in three additional cases: Rhoney v. Barbosa da Cunha, No. 26-104: Immigration officials detained Ricardo Aparecido Barbosa da Cunha—a Brazilian citizen who had lived in the United States for approximately twenty years after entering without inspection—and denied him a bond hearing under 8 U.S.C. § 1225(b)(2)(A). The Second Circuit held that his detention was instead governed by § 1226(a), which permits release on bond, because § 1225(b)(2)(A)’s mandatory-detention requirement applies only to noncitizens apprehended while entering the country or shortly thereafter. The question presented is: Whether 8 U.S.C. § 1225(b)(2)(A) mandates the detention pending removal proceedings of aliens who, like Barbosa da Cunha, are present in the United States without having been admitted. Missionaries of St. John the Baptist, Inc. v. Frederic, No. 25-113: A Catholic religious organization sought to build a shrine to the Virgin Mary on land the organization owned adjacent to its church in Park Hills, Kentucky. Local zoning restrictions prohibited the proposed construction. The question presented is: Whether a land-use regulation that prohibits a religious institution from building a religious structure on its own property constitutes a “substantial burden” on religious exercise under the Substantial Burden Provision of the Religious Land Use and Institutionalized Persons Act, 42 U.S.C. § 2000cc(a). Marschner v. Marschner, No. 25-1349: Under the Uniformed Services Former Spouses’ Protection Act (“USFSPA”), a veteran’s longevity-based retirement pay can be divided in a divorce, but retirement pay based on disability and retirement pay that was waived to receive disability pay are indivisible. The question presented is: Does the USFSPA require state courts to refuse enforcement of indemnification provisions in a divorce settlement agreement?

Insights

Energy Law: Month in Review - September 2026

Welcome to Dorsey’s Energy Law: Month in Review. We provide this update to our clients to identify significant developments in the previous month. Please reach out to any of the authors, listed above, to discuss these issues. Regulatory Developments Massachusetts Ratchets Up State and Local Regulation of AI Data Centers In early September, Governor Maura Healey of Massachusetts signed an executive order requiring that artificial intelligence data centers secure the approval of local communities as a precondition to proceeding with a given project. According to the terms of the order, data center developers will need to secure a “community benefits agreement” as a precondition to receiving permits from numerous state agencies, including the Department of Environmental Protection, the Energy Facilities Siting Board, and the Massachusetts Environmental Policy Act Office. Beyond requiring community benefits agreements, the order also mandates that developers mitigate utility costs to consumers, prohibits the use of nondisclosure agreements, and requires various state agencies to develop measures to limit data center impacts on the environment. North Carolina Regulators Decline Approval of Duke Energy Gas Turbine On September 18, 2026, North Carolina Utilities Commission (NCUC) denied Duke Energy’s application for a certificate of public convenience and necessity required to construct a gas-fueled combustion turbine at its Smith Energy Complex in North Carolina. The NCUC objected strongly to the $584 million price tag and noted that Duke appeared to be constructing the facility “based on anticipated data center customer additions.” The NCUC rejected that anticipated growth as “insufficiently reliable for the Commission to act at this point.” In rejecting Duke’s application, the NCUC also noted that Duke had signed the White House Ratepayer Protection Pledge, in which it represented that it would not shift data center costs to consumers. The NCUC observed that the record did not demonstrate how Duke “intends to adhere to its commitments under the Ratepayer Protection Pledge with regard to the Proposed Facility.” Notably, commission staff had actually supported the construction of the turbine, citing concerns about Duke’s reserve margins. The NCUC noted that it “understands the Public Staff’s expressed concerns,” but those concerns were outweighed by the NCUC’s reservations, including questions of demand. Department of Energy Approves Funds for Grid Improvement The U.S. Department of Energy (DOE) recently announced that it would fund 31 grid-improvement projects in 26 states. The funding initiative is part of the DOE’s “SPARK” initiative. The funding will include $1.9 billion in federal funding from DOE and $3.35 billion in recipient cost-sharing funding. The funds will go to projects designed to improve grid reliability and lower electricity costs. Recipients plan to reconductor over 1,500 miles of transmission lines and will deploy grid-enhancing technologies across approximately 21,000 miles. DOE stated that this initiative will make available over 23 additional gigawatts of electricity. Texas Moderates Rules Governing Data Center Interconnection The Texas Public Utility Commission adopted new regulations governing large-load interconnections. The rules impose a flat study fee of $100,000 for all proposed interconnections, which departs from the initial proposal to impose study fees using a tiered system based on project size. Additionally, the final rule eliminates the PUC’s previous proposal to impose a non-refundable interconnection fee of $50,000 per MW of contracted peak demand. The final rule also moderates the initially proposed regulations governing Electric Reliability Council of Texas (ERCOT) notifications for large-load customers’ non-utilized capacity. The proposed rules would have required notifying ERCOT within 30 days of missing a scheduled energization milestone by six months. The final rules, however, do not require informing ERCOT unless a scheduled energization milestone is missed by 24 months. FERC Denies TransAlta 202(c) Cost-Recovery Plan The Federal Energy Regulatory Commission (FERC) recently rejected TransAlta’s plan to recover $19.9 million in expenses stemming from a DOE order in which DOE prohibited TransAlta from retiring its coal-powered Centralia power plant. TransAlta had previously intended to retire the facility at the end of 2025. TransAlta’s cost recovery plan proposed spending an additional $23 million on repairs to continue operating the unit. FERC’s main objection had to do with geographic scope. TransAlta’s recovery plan called for recovering costs from California Independent System Operator (CAISO) and the Southwest Power Pool (SPP), but the DOE’s order requiring operation of the plant was designed to ensure reliability in the Northwest assessment area (Montana, Oregon, Washington, and parts of northern California and northern Idaho). Accordingly, FERC was unwilling to allow cost recovery from CAISO and SPP when the order that precipitated the additional costs only related to the Northwest assessment area. FERC informed TransAlta that it would only approve cost recovery from load-serving entities in the Northwest assessment area. FERC’s decision comes amid a rush of DOE emergency orders requiring the continued operation of coal-fired generating units. Litigation Appeals Court Upholds Washington Hydropower Plant With Caveats In a September 21, 2026, opinion, the Washington Court of Appeals largely upheld a Clean Water Act water quality certification by the Washington Department of Ecology for the Goldendale Energy Storage Project, a proposed pumped-water storage hydropower system adjacent to, but off-stream from, the Columbia River. A nonprofit (Columbia Riverkeeper) and the Confederated Tribes and Bands of the Yakama Nation appealed the certification, contending that it failed to impose necessary conditions and monitoring requirements to protect the water quality of the Columbia River. Most saliently, the plaintiffs argued that the project had the potential to leak 100 acre-feet of water per year into tributaries of the Columbia River. The Court of Appeals broadly rejected plaintiffs’ challenge to the state’s conclusion that “the project was designed not to leak.” That said, the Court of Appeals did reverse on one narrow issue. Specifically, the court determined that the state’s conclusion that “leakage from the project’s tunnels would be monitored and reported” was not supported by the evidence because the certification “does not explicitly require monitoring and reporting to determine whether there is any leakage.” Accordingly, the court remanded the matter to the state to impose monitoring and reporting requirements but otherwise affirmed the certification. Legislative Developments California Legislates Restrictions on Data Center Energy Use and Grid Costs On September 21, 2026, California Governor Gavin Newsom signed seven bills broadly regulating data centers in the state. SB 1168 directed the California Public Utilities Commission to assess the energy used by data centers. It also requires the PUC to pass costs of transmission and distribution upgrades and load increases on to data centers, rather than customers. SB 886 and SB 887 compel data centers to pay for infrastructure upgrade and generation costs, and wildfire mitigation costs, in addition to imposing environmental review. The statutes additionally increase local oversight of data centers. AB 1577 imposes a monthly reporting requirement that requires data centers to supply energy consumption and efficiency data to the California Energy Commission. AB 2383 contains incentives for data centers to use onsite clean energy generation. Finally, AB 2469 and AB 2619 require data center developments to assess water supply and develop a water scarcity plan. The statutes also mandate statewide water reporting as a precondition to obtaining and renewing business licenses.

Insights

EPA Limits Title V Re-Litigation of NSR Permits

Overview On September 25, 2026, the U.S. Environmental Protection Agency (“EPA”) published a final rule that significantly limits the ability of third parties to use the Clean Air Act (“CAA”) Title V permitting process to revisit New Source Review (“NSR”) permitting decisions years after those decisions were made. The rule establishes that NSR permitting determinations generally must be challenged during the original permitting proceeding, thereby providing regulated sources with greater permitting certainty and finality for major capital projects. Published in the Federal Register titled Clarifying the Scope of “Applicable Requirements” Under State Operating Permit Programs and the Federal Operating Permit Program (Docket ID No. EPA-HQ-OAR-2023-0401), the rule amends 40 C.F.R. Parts 70 and 71 to codify EPA’s interpretation regarding when requirements established under other CAA programs may be reviewed, modified, or implemented through the Title V operating permit program. The rule becomes effective 30 days after publication. The rule addresses two principal issues: (1) the relationship between NSR preconstruction permitting and Title V operating permits, and (2) the treatment of the General Duty Clause under CAA section 112(r)(1). Most significantly, the rule provides greater certainty for sources navigating the NSR permitting process. EPA’s amendments are intended to ensure that NSR permitting decisions made through an approved public process are generally not revisited later through Title V permit proceedings. The rule responds to a circuit split between the U.S. Courts of Appeals for the Fifth and Tenth Circuits. In Environmental Integrity Project v. EPA, 969 F.3d 529 (5th Cir. 2020), the Fifth Circuit upheld EPA’s interpretation, concluding that it was consistent with the text, structure, and purpose of Title V. In contrast, the Tenth Circuit reached the opposite conclusion in Sierra Club v. EPA, 964 F.3d 882 (10th Cir. 2020), finding that the then-existing regulatory definition of “applicable requirement” did not support EPA’s position. By amending the regulatory language on which the Tenth Circuit relied and codifying the interpretation approved by the Fifth Circuit, EPA has established a nationwide framework governing the interaction between NSR and Title V. NSR and Title V: EPA Establishes a Uniform Nationwide Framework At the core of the rule is EPA’s effort to define the respective roles of NSR and Title V. The rule codifies the approach EPA has applied since 2017: once a source obtains an NSR permit under an EPA-approved permitting program, and that permit was issued following public notice with an opportunity for comment and judicial review, the permit establishes the NSR-related “applicable requirements” of the State Implementation Plan (“SIP”) or Federal Implementation Plan (“FIP”) for Title V purposes. Under this framework, Title V is not a vehicle for re-examining underlying NSR permitting decisions. EPA does not intend to use the Title V process to revisit applicability determinations, emissions calculations, control technology determinations, permit conditions, or other issues resolved through the NSR permitting process. This principle applies regardless of the stage of the Title V proceeding; whether the NSR permit was issued pursuant to a SIP or FIP; the type of NSR issue involved; or whether the NSR permit is incorporated into Title V sequentially or concurrently. Limited Exceptions EPA recognizes several circumstances in which NSR issues may still be reviewed through the Title V program: No NSR permit was issued at all; The permit was issued without public notice and an opportunity for comment and judicial review; or The issue involves substantive overlap between Title V and NSR requirements, such as the adequacy of monitoring provisions. As a result, the rule does not insulate unpermitted projects or foreclose review of matters that independently arise under Title V. Key Regulatory Amendments The rule revises the definition of “applicable requirement” in 40 C.F.R. §§ 70.2 and 71.2. Paragraph (1): Where an NSR permit is issued with public notice and an opportunity for comment and judicial review, the permit establishes and defines the applicable SIP or FIP requirements for Title V purposes. Paragraph (2): All NSR permit terms, including terms contained in minor NSR permits, constitute applicable requirements that must be incorporated into Title V permits. Paragraph (4): CAA section 112(r)(1) (the General Duty Clause) is expressly excluded from the definition of “applicable requirement,” while section 112(r)(7) Risk Management Program requirements remain included. EPA also amended 40 C.F.R. §§ 70.8 and 70.12 to clarify that alleged defects in requirements established outside the Title V process generally do not provide a basis for EPA objection to a Title V permit or for a Title V citizen petition. General Duty Clause Exclusion The rule also codifies EPA’s longstanding position that the General Duty Clause in CAA section 112(r)(1) is not an “applicable requirement” for Title V purposes. EPA points to several considerations supporting that conclusion, including the distinction between the General Duty Clause and Title V permit terms, the provision’s origins in the Occupational Safety and Health Act’s general duty clause, and the different enforcement structures applicable to the General Duty Clause and Title V permit requirements. Importantly, excluding section 112(r)(1) from the definition of “applicable requirement” does not eliminate EPA’s authority to enforce the General Duty Clause independently of the Title V program. The final rule instead clarifies that the General Duty Clause need not—and should not—be incorporated into Title V permits as an applicable requirement. Practical Implications for Regulated Sources Greater Finality for NSR Permits  For projects requiring PSD, nonattainment NSR, or minor NSR permits, the permitting process becomes the primary forum for resolving disputes regarding applicability determinations, emissions calculations, control technology requirements, offsets, and permit conditions. Once an NSR permit is issued through a qualifying public process, regulated sources should face substantially reduced risk that those same issues will be challenged years later through Title V permit proceedings. Reduced Risk of Collateral Permit Challenges Stakeholders have sometimes sought to use Title V permit issuance, renewal, revision, or citizen-petition proceedings to challenge underlying NSR determinations. The final rule makes clear that Title V is not the appropriate vehicle for challenging whether an applicable requirement was correctly established in the first instance. This should reduce the risk of permit delays and uncertainty associated with collateral challenges to previously issued NSR permits. The rule does not, however, eliminate all Title V challenges relating to an NSR permit. Challenges concerning the Title V permit itself—including whether it appropriately incorporates applicable requirements or contains adequate compliance provisions—remain possible. Increased Importance of the Initial NSR Proceeding Because Title V generally will not provide a second opportunity to challenge the substantive validity of an NSR determination, the administrative record developed during the NSR process becomes increasingly important. Permit applicants should ensure that applicability analyses, emissions calculations, control technology evaluations, modeling demonstrations, and supporting technical documentation are thoroughly developed during the original permitting proceeding. For significant projects, applicants may therefore have an additional incentive to identify and resolve potential permitting issues before the NSR permit is issued rather than assuming that unresolved issues can be addressed during a subsequent Title V proceeding. Potential Incentive for Broader Public Participation EPA also notes that permitting authorities may choose to provide public notice and an opportunity for comment for a broader range of NSR permits because permits issued through a qualifying public process receive the benefit of the finality framework established by the rule. Some permitting authorities may conclude that greater public participation at the NSR stage is preferable to uncertainty during subsequent Title V proceedings. Conclusion The final rule is principally a permitting-certainty measure. For sources that obtain NSR permits through a public process, EPA has substantially limited the ability of third parties to revisit underlying NSR determinations through the Title V program. As a result, regulated entities should benefit from greater finality regarding key permitting decisions, reduced risk of collateral permit challenges, and increased certainty when planning and implementing capital projects.