.

Colin represents clients in litigated and regulatory matters.

Colin is a senior attorney in Dorsey's Regulatory Affairs group. Currently, he largely represents energy industry clients in a variety of contexts, including proceedings before state utility commissions, transactional matters, and advice and representation with regard to disputes. Earlier in his career, Colin primarily practiced as a construction lawyer. He has substantial litigation experience before courts, arbitral tribunals, and in administrative proceedings. As both a construction lawyer and now in his energy law practice, Colin has significant transactional experience particularly with regard to the construction and co-ownership of energy infrastructure. Colin also has experience with government contracting and environmental law.

Select Experience

  • Represent clients in state utility commission proceedings
  • Advised client regarding issues arising out of joint ownership of power plant
  • Advised client on the regulatory and environmental considerations for acquisition of power plant
  • Provided advice and drafted contract amendments for joint ownership of transmission line

Education

  • University of Michigan (J.D., 2004)
    • cum laude
  • Grinnell College (B.A., 1997)
    • Phi Beta Kappa

Bar Admissions

  • Minnesota
  • Colorado

Court Admissions

  • U.S. District Court for the District of Minnesota

Accolades

  • MSBA, North Star Lawyer, 2012-2013, 2015, 2017-2019, 2021, 2023-2024
  • Consistently providing pro bono legal assistance to those in need through Dorsey’s Pro Bono program

Select Presentations

  • Co-presented CLE on Surety Bonds versus Letters of Credit, Construction Law Section, Minnesota State Bar Association (March 13, 2009)
  • Co-presented CLE on Filing and Enforcing Mechanics’ Liens in Minnesota – A How-to-do-it Primer, Minnesota CLE’s 2010 Real Estate Institute (November 13, 2010)

Insights

Client Alert

Energy Law: Month in Review - August 2026

September 3, 2026

Welcome to Dorsey’s Energy Law: Month in Review. We provide this update to our clients to identify significant developments in the previous month. Please reach out to any of the authors, listed above, to discuss these issues. REGULATORY DEVELOPMENTS Virginia Commission Requires Dominion to Directly Assign Some Transmission Costs to Data Centers The Virginia State Corporation Commission (SCC) issued an order on July 31, 2026, in a Dominion Energy transmission cost rider proceeding establishing a new docket to develop a revised Dominion line extension policy requiring direct payment of certain transmission costs, through mandatory contribution in aid of construction payments. The new policy will apply to “direct connect” facilities that are needed to serve new or expanding large-load customers. Allocation of transmission costs that are not “direct connect” may also be addressed in the new docket. In its order, the SCC also approved a change to the class allocation method used for the rider that shifted more costs to large-load customers based on an adjustment to reflect a new minimum demand charge based on transmission of 85% of contract load (for those customers whose actual usage does not exceed that threshold). DOE Not Moving Forward with Designating Three Previously Selected National Interest Electric Transmission Corridors U.S. Secretary of Energy Chris Wright announced on August 12, 2026, that the U.S. Department of Energy (DOE) will not move forward with designating the Lake Erie-Canada Corridor, the Southwestern Grid Connector Corridor, and the Tribal Energy Access Corridor as National Interest Electric Transmission Corridors. The three had been selected by the Biden administration in late 2024. In its announcement, DOE characterized the three corridors as having been chosen by the Biden administration to advance “their Green New Scam agenda.” DOE also stated that the designation framework had proved ineffective and pointed to other measures taken under the current administration to build new transmission infrastructure. NY Begins Process to Establish Single, Statewide Platform for Direct Load Control On August 13, 2026, the New York Public Service Commission issued an order establishing a proceeding to implement the Excelsior Power Program. The Commission explained that it envisions the Excelsior Power Program to be a “centralized statewide platform for enrolling all applicable devices within residential Direct Load Control (DLC) programs for both electric and gas systems.” By its order, the Commission directed the major gas and electric utilities to jointly develop and file a proposed implementation plan for the new program. The Commission’s order stems from requirements set by the New York State Legislature in its 2026-2027 enacted budget, which allocated $33 million for the Excelsior Power Program. Among other requirements, the Legislature directed that participation in the new program be voluntary and that customers be able to override smart thermostats during demand control events without penalties other than discounting or derating bill credits. FERC Approves Cost Allocation Framework for MISO Transmission Projects Built in PJM On August 12, 2026, the Federal Energy Regulatory Commission approved a cost allocation framework proposed by the Midcontinent Independent System Operator Inc. (MISO) for transmission projects located in PJM Interconnection (PJM) that are designed to benefit MISO’s Midwest Subregion. The projects in question are part of the Tranche 2.1 portfolio of Multi-Value Projects approved by the MISO Board in December 2024 as part of the MISO long-range transmission planning process. Challengers argued MISO should have used its Competitive Developer Selection Process for the projects, but FERC concluded that MISO lacks authority to apply that process outside of its region with respect to projects under the functional control of another transmission provider. Pennsylvania to Have Preferential Permitting for Data Centers that Bring their Own Power In an Executive Order issued on August 18, 2026, Pennsylvania Governor Josh Shapiro ordered his state’s Department of Environmental Protection (DEP) to establish a separate (and faster) permitting review process for data center projects with peak demand over 25 MW that commit to the Governor’s Responsible Infrastructure Development (GRID) requirements. Under the GRID requirements, developers must secure incremental energy and capacity physically deliverable in the PJM deliverability area where the data center is located, must commit to using an increasing percentage of energy from dispatchable, clean energy resources located in Pennsylvania, and must provide agreements and/or tariffs showing they will pay all of the utility costs resulting from their projects, among other requirements. In the Executive Order, the Governor also directed the State to remove any existing data center projects from the previously established PA Permit Fast Track Program and barred state agencies from entering into confidentiality agreements with data center developers. The Executive Order would also require data centers to obtain local or municipal approvals prior to state permitting action. FERC Approves SPP Tariff Revisions to Allow Economic Topology Reconfigurations On August 19, 2026, the Federal Energy Regulatory Commission (FERC) approved tariff revisions submitted by Southwest Power Pool (SPP) to implement a process allowing for economic topology reconfigurations. SPP explained that grid operators traditionally address congestion by re-dispatching power plants; however, topology reconfiguration can be used to change power flows to handle congestion less expensively. Under the new plan, market participants can submit proposed reconfigurations and the grid operator itself can offer reconfigurations. SPP pointed out that MISO implemented a similar process in 2023, and that it had achieved congestion savings of $113 million in 2025 through that process. Commissioners David Rosner and Judy Chang issued concurrences in which they encouraged other grid operators to adopt similar approaches. LITIGATION Ninth Circuit Upholds Dismissal of PacifiCorp Challenge to Washington State Carbon Act The United States Court of Appeals for the Ninth Circuit issued a published opinion on August 7, 2026, upholding a decision by the United States District Court for the Western District of Washington dismissing PacifiCorp’s challenge under the United States Constitution’s Dormant Commerce Clause to Washington State’s Climate Commitment Act (CCA). PacifiCorp argued that the CCA is unconstitutional because it requires carbon emitting entities to obtain and retire carbon allowances but provides no-cost allowances for emitting generation that serves Washington customers while not doing so for emitting generation that serves customers in other jurisdictions. However, both the district court and the Ninth Circuit rejected PacifiCorp’s challenge because generation used to supply electricity to Washington customers is already subject to the stringent requirements of Washington’s Clean Energy Transformation Act (CETA). The Ninth Circuit concluded that emissions from generation used to serve Washington customers and emissions from generation to serve customers in other states are dissimilar because of CETA. Pennsylvania Court Finds Solar PV Projects Eligible for Solar Credits Despite Not Being Connected to the Grid The Commonwealth of Court of Pennsylvania issued a decision on August 19, 2026, holding that solar photovoltaic (PV) projects in Pennsylvania that directly deliver energy to a retail customer do not have to connect with the electrical grid to qualify for “solar renewable energy credits” under Pennsylvania’s Alternative Energy Portfolio Standards (AEPS) Act. The decision, which arose out of Williams Companies, Inc.’s plans to construct two 11 MW behind-the-meter solar facilities to power natural gas compressor stations, reversed a 2024 decision by the Pennsylvania Public Utility Commission. The court’s majority based its decision on the plain meaning of a provision of the AEPS Act which states that solar PV projects qualify for solar credits if they “[d]irectly deliver” the energy they generate to “a retail customer” of an electric distribution company.

Client Alert

Energy Law: Month in Review - September 2025

October 6, 2025

AUTHORS Zev Simpser, Brian Bell, and Colin Wicker. Welcome to Dorsey’s Energy Law: Month in Review. We provide this update to our clients to identify significant developments in the previous month. Please reach out to any of the authors, listed above, to discuss these issues.  Table of Contents Third Circuit Rules Pennsylvania Commission’s Transmission Siting Decision Preempted by Federal Law D.C. Circuit Upholds FERC Decision on Solar-Plus-Battery Project in Post-Chevron PURPA Case Xcel Energy and Telecommunications Defendants Settle Marshall Fire Litigation Pennsylvania Supreme Court Allows Utility to Keep Competitors Add-Ons off Utility Bills Trump Administration Cancels Awards to Clean Energy Projects in Blue States Texas Commission Approves Two Entergy Gas-Fueled Plants with $2.4 Billion Hard Cap Nevada Commission Institutes Daily Demand Charge for Nevada Power and 15-Minute Interval Net Metering for Sierra Pacific Power Framework for New Proactive Grid Planning Process Adopted in New York Washington Commission Adopts Rules for Combined Gas and Electric Integrated System Plans FERC Issues Direct Final Rule to Sunset 53 Existing Regulations Governor Newsom Signs Package of Energy Bills LITIGATION AND DISPUTES Third Circuit Rules Pennsylvania Commission’s Transmission Siting Decision Preempted by Federal Law In a September 5, 2025 decision, a unanimous three judge panel of the United States Court of Appeals for the Third Circuit held that a Pennsylvania Public Utility Commission order denying Transource Pennsylvania’s application to build transmission lines in Pennsylvania was invalid under the Supremacy Clause of the U.S. Constitution. The specific project is meant to relieve congestion along the Pennsylvania-Maryland border, and is projected to lower costs in Maryland, Virginia, West Virginia, and the District of Columbia. However, it is also forecasted to increase costs in Pennsylvania. The Pennsylvania Commission decided there is not a need for the project, and in doing so it rejected PJM’s Federal Energy Regulatory Commission (FERC)-approved cost-benefit analysis. The Third Circuit concluded the Pennsylvania Commission’s decision frustrated FERC’s objectives. It found that regional planning was one tool FERC had developed to support competition and held that “[w]hen an RTO has selected a project for inclusion in a regional transmission plan as part of its federal mandate, a state regulator cannot, consistent with the Supremacy Clause, reject the project based on a lack of ‘need.’” The district court had also found that the Pennsylvania order violated the dormant commerce clause, but the Third Circuit did not reach that issue.  D.C. Circuit Upholds FERC Decision on Solar-Plus-Battery Project in Post-Chevron PURPA Case On September 9, 2025, in a 2-1 decision, the United States Court of Appeals for the District of Columbia Circuit upheld FERC’s certification of the Broadview solar power facility as a “small power production facility” under the Public Utility Regulatory Policies Act of 1978 (PURPA). The court had upheld FERC’s decision in 2023, but the United States Supreme Court remanded the case back to the D.C. Circuit following the decision in Loper Bright Enterprises v. Raimondo, 603 U.S. 369 (2024), overruling Chevron U.S.A. v. Natural Res. Def. Council, 467 U.S. 837 (1984). The Broadview facility will be capable of generating up to 160 MW and has a 50 MW battery, but the facility’s inverters can only send 80 MW to the grid. The question before the court was whether Broadview will violate the 80 MW power production capacity ceiling for a “facility” set forth in 16 U.S.C. § 796(17)(A). Earlier, the court had deferred to FERC in resolving the issue, but on remand the court concluded for itself that the “power production capacity” of a “facility” is the amount of power it can send to the grid. The D.C. Circuit held this reading of the statute best accounts for the facility as a whole and not just the maximum capacity of the solar production array, which the court characterized as just one component of the facility.  Xcel Energy and Telecommunications Defendants Settle Marshall Fire Litigation On September 24, 2025, one day before trial was scheduled to begin in Boulder County District Court in Boulder, Colorado, Xcel Energy, Qwest Corporation, and Teleport Communications America announced an approximately $640 million settlement in principle to resolve claims brought by individual plaintiffs, subrogation insurers, and public entities related to the 2021 Marshall Fire. In its statement, Xcel Energy said that approximately $350 million of the settlement would be funded by its remaining insurance coverage and none from its customers. Xcel Energy did not admit any fault, wrongdoing, or negligence, consistent with its position throughout the litigation. Plaintiffs had sought billions in damages.  Pennsylvania Supreme Court Allows Utility to Keep Competitors Add-Ons off Utility Bills On September 25, 2025, the Pennsylvania Supreme Court decided that FirstEnergy does not have to provide “on-bill billing” to third parties offering non-utility goods and services, such as tree trimming services and smart thermostats, even though it will include such amounts when customers purchase such goods and services from FirstEnergy itself. Under Pennsylvania law, FirstEnergy and other Electric Distribution Companies (EDCs) do have to provide on-bill billing when customers choose to purchase power generated by a different utility operating as an electric generation supplier (EGS), but the court concluded that the applicable provisions of Pennsylvania’s Competition Act do not apply to non-commodity goods and services.  REGULATORY DEVELOPMENTS Trump Administration Cancels Awards to Clean Energy Projects in Blue States In a press release issued on October 1, 2025, the U.S. Department of Energy (DOE) announced the termination of 321 financial awards supporting 223 projects. DOE stated that the projects did not adequately advance the nation’s energy needs, were not economically viable, and would not provide a positive return on the investment of taxpayer dollars. DOE did not provide a list of the projects in question in its press release, but reports indicate they include a Minnesota Power direct current upgrade project and Xcel Energy long-duration energy storage projects. The projects are clean energy projects and are located in California, Colorado, Connecticut, Delaware, Hawaii, Illinois, Maryland, Massachusetts, Minnesota, New Hampshire, New Jersey, New Mexico, New York, Oregon, Vermont, and Washington, Democratic leaning states.  Texas Commission Approves Two Entergy Gas-Fueled Plants with $2.4 Billion Hard Cap On September 11, 2025, the Public Utility Commission of Texas approved a Certificate of Convenience and Necessity for Entergy’s proposed gas-fueled 754-MW Legend Power Station and 453-MW Lone Star Power Station. Legend is a combined cycle facility that would be carbon capture-enabled and have a hydrogen-capable turbine, and Lone Star is a combustion turbine facility with a hydrogen capable turbine. In remarks at hearing and a Commissioner Memorandum, Chairman Thomas Gleeson agreed Entergy needs to address projected capacity shortfalls but advocated for a hard cap on costs in light of concerns that the utility had not taken sufficient steps to ensure the projects will be cost effective. Notably, Entergy had not issued a request for proposals to determine what projects to pursue. The Commission set a $1.6 billion hard cap for the Legend project and a $799 million hard cap for the Lone Star project.  Nevada Commission Institutes Daily Demand Charge for Nevada Power and 15-Minute Interval Net Metering for Sierra Pacific Power In a September 16, 2025 Order, the Public Utilities Commission of Nevada (PUCN) resolved the contested issues in rate cases brought by Nevada Power Company and Sierra Pacific Power Company, both of which do business as NV Energy. Importantly, the PUCN established a new daily demand charge for all Nevada Power residential and small business customers to be implemented beginning April 2026, which will be calculated based on the maximum amount a customer uses each day with the daily charges summed up monthly. The new charge is designed to address what the PUCN said was “under-recovery of costs” from customers with solar generation participating in a statutorily required net-metering program. PUCN also established 15-minute interval net metering, rather than monthly net metering, for new net metering customers in Sierra’s service territory to address the same issue.  Framework for New Proactive Grid Planning Process Adopted in New York On September 18, 2025, the New York Public Service Commission (NYPSC) adopted a Proactive Planning Framework designed to establish a statewide unified process to study and identify necessary system upgrades to support building electrification and transportation electrification. In contrast to New York’s Coordinated Grid Planning Process, which is focused on higher-voltage infrastructure, the new process is to use bottom-up modeling to identify upgrades to distribution and local network systems for NYPSC consideration. The first step under the framework is for utilities to file plans outlining data needs and assumptions needed to develop granular load forecasts.  Washington Commission Adopts Rules for Combined Gas and Electric Integrated System Plans The Washington Utilities and Transportation Commission issued rules on September 26, 2025 for combined gas and electric Integrated System Plans that Puget Sound Energy, the state’s only large gas and electric utility, will have to begin filing in 2027. The rules include specific plan requirements, including a cost test to be used for emission-reduction measures. The combined planning process was mandated by the Washington Legislature in the Large Combination Utilities Decarbonization Act, which was enacted in 2023. A voter-approved initiative, Initiative 2066, would have required significant changes to the rules and the underlying statute in ways that would continue access to and use of natural gas, but it was found unconstitutional by a district court earlier this year. The Washington Supreme Court granted review of that decision on September 3, 2025.  FERC Issues Direct Final Rule to Sunset 53 Existing Regulations On October 1, 2025, the FERC approved a direct final rule to incorporate a conditional phaseout date into 53 existing regulations. FERC stated that the rules chosen for sunsetting are “outdated, seldomly used, or duplicative regulations.” Some regulations are outdated because their governing regulations or statutes have been amended or repealed. Other regulations concern filing protocols that are not used by FERC anymore. The rule will be effective 45 days after being published in the Federal Register and the conditional sunset dates incorporated into the existing rules are one year after the effective date. FERC explained that the one-year period provides an opportunity to comment on the costs and benefits of the regulations in question prior to the sunset date. FERC also stated that if it receives significant adverse comments on any part of the direct final rule by 30 days after the date of publication in the Federal Register, it will withdraw such part of the rule and address it in a separate rulemaking. FERC’s action was taken in response to Executive Order 14270, “Zero-Based Regulatory Budgeting to Unleash American Energy.” LEGISLATION FERC Issues Direct Final Rule to Sunset 53 Existing Regulations California Governor Gavin Newsom signed multiple energy bills into law on September 19, 2025. The legislation includes AB 825, which provides for an independent body to oversee the regional Western energy market, and SB 254, which creates the California Transmission Accelerator Revolving Fund Program to build new transmission lines and adds $18 billion to California’s wildfire fund. Also, AB 1207 re-authorized the state’s cap-and-trade program through 2045 and renamed it a “cap-and-invest” program.   

Firm Highlights

Insights

Ninth Circuit Splits California’s Climate Disclosure Laws: Scope 1 and 2 Reporting Proceeds; Scope 3 and SB 261 Likely Unconstitutional

Key Takeaways On November 9, 2026, the Ninth Circuit in Chamber of Commerce v. Sanchez allowed Scope 1 and Scope 2 greenhouse gas (GHG) emissions reporting under SB 253 to proceed but held that SB 253’s Scope 3 requirement, and SB 261 in its entirety, likely violate the First Amendment.1 U.S.-formed entities with total annual revenues above $1 billion that do business in California remain subject to Scope 1 and 2 reporting. First reports (or, for eligible entities, statements of non-reporting) were due November 10, 2026.2 Scope 3 reporting (scheduled to begin in 2027) and SB 261 climate-risk reporting are effectively on hold. Entities with revenues between $500 million and $1 billion, which were covered only by SB 261, currently have no reporting obligation under either law.3 The ruling addresses only preliminary injunctive relief; it is not a final judgment on the merits. If the district court finds the Scope 3 requirement non-severable, it could also enjoin Scope 1 and 2 reporting.4 Background SB 253 (the Climate Corporate Data Accountability Act) requires U.S.-formed entities with total annual revenues above $1 billion that do business in California to report Scope 1 and 2 emissions starting in 2026 and Scope 3 emissions starting in 2027, with penalties of up to $500,000 per reporting year.5 SB 261 (the Climate-Related Financial Risk Act) requires U.S.-formed entities with total annual revenues above $500 million that do business in California to publish biennial climate-related financial risk reports consistent with the Task Force on Climate-related Financial Disclosures (TCFD) framework, with penalties of up to $50,000 per reporting year.6 Business groups led by the U.S. Chamber of Commerce challenged both laws as compelled speech that violates the First Amendment. In August 2025, the district court denied their motions for preliminary injunctions. On November 18, 2025, the Ninth Circuit enjoined SB 261 pending appeal but declined to enjoin SB 253.7 The implementing regulation adopted by the California Air Resources Board (CARB) took effect on October 12, 2026, and set November 10, 2026, as the first Scope 1 and 2 reporting deadline.8 The Court’s Decision Scope 1 and Scope 2: Upheld for Now The panel held that Scope 1 and 2 disclosures are commercial speech because they compel disclosure of factual information about emissions from a company’s own operations and purchased energy—information that bears on capital transactions. Applying intermediate scrutiny, the court concluded that the requirements advance California’s substantial interests in reducing information asymmetries for investors and in reducing emissions and are no more extensive than necessary.9 The panel split 2–1 on this issue.10 Scope 3: Likely Unconstitutional The court held that Scope 3 disclosures concern diffuse third-party conduct across the value chain and are “insufficiently tethered” to the reporting entity’s own operations to qualify as commercial speech. Applying strict scrutiny, the court concluded that the requirement likely fails because (1) SB 253 does not require primary data, (2) the record did not show that companies’ proxy-based estimates would be more reliable than estimates the State could generate itself, and (3) the link to investor-relevant risk was too remote.11 SB 261: Likely Unconstitutional in Its Entirety The court held that SB 261 compels noncommercial speech because it requires “predictive and normative judgments” about a “politically fraught subject.” Even assuming California’s interests are compelling, the court reasoned that the law is likely not narrowly tailored because California could use less restrictive alternatives, such as incentives for voluntary disclosure.12 The panel was unanimous on Scope 3 and SB 261.13 Remand and Severability The Ninth Circuit did not enter injunctions itself. It reversed the denials of preliminary injunctive relief and remanded with instructions for the district court to enter relief consistent with the opinion and, for Scope 3, to decide severability first.14 SB 253 contains an express severability clause. If the district court nevertheless finds the Scope 3 requirement non-severable, it could also enjoin Scope 1 and 2 reporting.15 Current Status at a Glance Requirement Status after the Ruling Practical Effect SB 253 – Scope 1 and 2 emissions (entities with revenues above $1 billion) In effect; denial of preliminary injunction affirmed First reports were due November 10, 2026; CARB fee notices expected by December 10, 202616 SB 253 – Scope 3 emissions (scheduled to begin in 2027) Likely unconstitutional; remanded for severability ruling and entry of injunctive relief Not required while remand is pending; scope of CARB’s 2027 rulemaking uncertain17 SB 261 – climate-related financial risk reports (entities with revenues above $500 million) Likely unconstitutional in its entirety; enjoined pending appeal since November 18, 2025 No current reporting obligation; voluntary reports permitted18 What to Watch Any petition for panel rehearing or rehearing en banc (due 14 days after entry of judgment) and any petition for a writ of certiorari to the U.S. Supreme Court.19 The district court’s severability ruling and the scope of any preliminary injunctions it enters as to Scope 3 and SB 261.20 CARB’s response. As of the date of this alert, CARB has not issued a formal statement on the opinion.21 CARB had been developing a second rulemaking for reporting years 2027 and later, addressing Scope 3, assurance, deadlines, and reporting templates, and had proposed retaining November 10 as the annual deadline.​​​​​​​22 Recommended Actions Confirm coverage entity by entity. Revenue (gross receipts, based on the lesser of the two prior fiscal years) and “doing business in California” are determined separately for each entity; affiliates are not aggregated. Retain supporting California tax records for five years.23 If a covered entity has not filed, file promptly. Submit the Scope 1 and 2 report (or, if eligible, a statement of non-reporting) and document good-faith compliance efforts, which CARB must consider in assessing penalties.24 Calendar the fee cycle. CARB expects to issue fee notices by December 10, 2026, with payment due within 60 days after the notice; each day of nonpayment is a separate violation.​​​​​​​25 CARB’s August 2025 proposal set flat fees at $3,106 per SB 253 entity and $1,403 per SB 261 entity.26 Confirm the final amount when the CARB notice arrives. Prepare for 2027 Scope 1 and 2 reporting. Third-party assurance was not required for 2026, but CARB has signaled that it will require limited assurance of Scope 1 and 2 data for 2027 and later years.27 Engage assurance providers and strengthen internal data controls now. Pause, but preserve, Scope 3 and SB 261 workstreams. Maintain existing data and processes: the ruling is preliminary, and many multinational companies will still need Scope 3 and product-level emissions data under the EU’s Corporate Sustainability Reporting Directive (CSRD) and Carbon Border Adjustment Mechanism (CBAM).28 Companies may still publish SB 261 reports voluntarily.29 Review public statements. Continue to review voluntary climate disclosures for consistency with CARB filings and other regulatory reports. Considerations for Real Estate and Infrastructure Clients The following are practice recommendations, not statutory requirements: Control boundaries. Whether emissions from a building or data center fall within a landlord’s or a tenant’s Scope 1 or 2 inventory depends on the control approach applied under the GHG Protocol. Leases, colocation agreements, and powered-shell arrangements should specify which party has operational control for GHG reporting purposes. Data cooperation. Include obligations to deliver utility and energy data (with specified timing and format) and to cooperate with assurance providers, particularly where the landlord or operator holds the utility accounts. Transactions. In acquisitions and financings, diligence the target’s or borrower’s SB 253 compliance and fee payments, and consider representations and covenants on the accuracy of emissions data. Value-chain requests. Counterparty requests for Scope 3 data may slow, but those subject to CSRD will likely continue to make them. This alert is for general information only and is not legal advice. The law in this area is changing rapidly, and developments after November 18, 2026, may affect this analysis.  1 Chamber of Commerce v. Sanchez, No. 25-5327 (9th Cir. Nov. 9, 2026) 2 White & Case, California Climate Disclosure Laws: Ninth Circuit Finds SB 253 Scope 3 Requirements and SB 261 Likely Unconstitutional (Nov. 2026) 3 Legal 500, Ninth Circuit Approves California’s Core Carbon Emissions Reporting Rules (Nov. 2026) 4 White & Case, supra note 2. 5 Kirkland & Ellis, Ninth Circuit Rules on California’s Climate Disclosure Laws (Nov. 2026) 6 Simpson Thacher, California Climate Reporting Laws: Ninth Circuit Issues Partial Injunction (Nov. 2025) 7 White & Case, supra note 2. 8 Vinson & Elkins, OAL Approves CARB’s Initial Regulation (Oct. 2026) 9 White & Case, supra note 2. 10 Foley & Lardner, California Climate Disclosure Laws (Nov. 2026) 11 White & Case, supra note 2. 12 Chamber of Commerce, No. 25-5327. 13 Kirkland & Ellis, supra note 5. 14 Troutman Pepper Locke, Ninth Circuit Rules on Challenge to California’s Climate Disclosure Laws (Nov. 2026) 15 White & Case, supra note 2. 16 Davis Polk, Getting Ready for California SB 253’s November 10 Reporting Deadline (Oct. 2026) 17 Troutman Pepper Locke, supra note 14. 18 White & Case, supra note 2. 19 Id. 20 Troutman Pepper Locke, supra note 14. 21 Morgan Lewis, Ninth Circuit Reverses Lower Court (Nov. 2026) 22 Simpson Thacher, CARB Provides New Guidance on SB 253 Reporting (July 2026) 23 Davis Polk, supra note 16. 24 Id. 25 Id. 26 CARB, SB 253/261 Public Workshop Slides (Aug. 2025) 27 Vinson & Elkins, supra note 8. 28 O’Melveny, Is Your Company Still Required to Report Under California’s Climate Laws? (Nov. 2026) 29 White & Case, supra note 2.