Just in time for the holidays, the U.S. District Court for the Western District of Kentucky issued a decision steeped in two rich holiday traditions—family lore and alcohol. On December 16, 2021, the court entered a preliminary injunction against Log Still Distilling, LLC in a trademark infringement and unfair competition action brought earlier this year by Heaven Hill Distilleries, Inc., both manufacturers of bourbon. Heaven Hill is a large family-owned distillery founded in Louisville, Kentucky in 1935. Log Still was founded in 2018 as a new distillery, line of spirits, and tourist destination in Gethsmane, Kentucky. Bourbon is a distilled liquor made primarily from corn that Congress has designated a distinctive product of the United States.

The story of how Heaven Hill and Log Still arrived in a trademark battle in federal court begins with Joseph Washington “J.W.” Dant, who first distilled bourbon as a teenager in 1836. J.W. Dant’s unique distilling method entailed running a copper pipe through a hollow poplar log, filling the pipe with fermented mash, and passing steam through the pipe. The resulting liquor became J.W. Dant-branded bourbon whiskey. Dant’s namesake distillery continued producing J.W. Dant whiskey after Dant’s death in 1902, and after Prohibition obtained two federally registered trademarks (U.S. Reg. Nos. 320,981 and 376,057):

The distillery and the marks changed hands several times in the mid-20th century, ending in Heaven Hill buying the J.W. Dant brand (among others) in 1993. Today, J.W. Dant bourbon is available for $15 to $18 on the bottom shelf of liquor stores in most states. (J.W. Dant is also for sale on the Internet, where no one knows you’re a bottom shelf liquor.)

Meanwhile in Gethsmane, J.W.’s great-great-great-grandson John Wallace “Wally” Dant III and some of his cousins founded Log Still to “revive” their family’s place in the bourbon business. Wally initially approached Heaven Hill about buying the J.W. Dant brand, but Heaven Hill declined. Undaunted, Log Still launched its Monk’s Road-branded bourbon and sought to infuse its promotion with the family’s history and, according to Log Still’s internal marketing documents, create “ties to the J.W. Dant name whether the brand can be used or not.”

These ties begin with the Log Still Distilling name, which evokes J.W. Dant’s original method of distilling bourbon by pouring it through a hollowed log. Log Still went further—naming its distillery “Dant Crossing” and billing its brand as the “rebirth of the J.W. Dant legacy” among other homages to the family’s famous ancestor. In response to Log Still’s social media posts containing these themes, Heaven Hill sent cease-and-desist letters. Heaven Hill also opposed Log Still’s attempt to federally register a “Dant & Head” trademark, and ultimately filed suit.

In granting Heaven Hill’s request for a preliminary injunction, the court found persuasive proof that Log Still had crossed from recounting family lore to build a new brand into impermissibly leveraging an old brand that Log Still did not own. In its 58-page decision, the court catalogued Log Still’s marketing strategies and advertising themes to conclude that this was “an affiliation case in which a newcomer is building a brand by intentionally tying itself to an old brand and story controlled by a competitor.”

Throughout, Log Still’s marketing strategy invoked themes of “reviving a legacy,” “heritage revived,” and “reviving the Legacy one barrel at a time.” Log Still acquired the domain name JWDant.com and, for a time, directed traffic to Log Still’s website. That website described the “heritage” and “Dant Legacy” Log Still claimed to be reviving and that Log Still’s “story … begins with our forefather Joseph Washington Dant,” who “gave birth to the Dant family’s place in bourbon lore with a legacy all our own.” Log Still declared on social media that “we’re the Dant family … and we’re back in the bourbon business.” A few posts even featured old photos that included the trademarked J.W. Dant logo and bottles.

As the court observed, this public story of revival is not accurate—the J.W. Dant brand had existed all along. And Log Still was keenly aware of the existing J.W. Dant brand. Log Still’s internal marketing plans described its strategy to “subtly” tie is branding to that of J.W. Dant. Log Still’s documents described J.W. Dant as one of Log Still’s “competitors,” and stated that there was “possible confusion” between the brands, which Log Still and its marketing team predicted could lead to “threats” such as “legal challenges” from Heaven Hill.

Although not knock-offs, the court decided that Log Still’s logos appear influenced or inspired by the J.W. Dant marks. Log Still’s Monk’s Road bourbon displays the tagline “[t]his is a story of heritage & revival” and state that “Joseph Washington Dant started this tradition way back in 1836 when he felled a poplar tree.” Log Still’s label also featured a crest with an establishment date of 1836 that was definitely not applicable to Log Still’s founding. Log Still took a similar approach to branding its 350-acre campus by highlighting the land’s history to the Dant family. Visitors are greeted by a story board discusses the history of J.W. Dant and Log Still, and the tasting room is walled by barrels stenciled with “The Dant Distillery Company,” a common-law trademark registered to Heaven Hill. Even if some of these statements—when read narrowly—merely referred to J.W. Dant’s history and not the competing bourbon sold today, the court concluded that together, Log Still’s story “indicates that Log Still’s principal motivation is to sell its competing spirits and tourist offerings—not simply to reminisce about family history.”

All of this led the court to conclude that Log Still was using the J.W. Dant name in a manner likely to cause consumers to be confused about the (lack of) a relationship between the two brands. The court began its analysis with two threshold issues: First, whether Heaven Hill had valid protectable rights. On this issue, Log Still argued that Heaven Hill had “allowed the quality and sales of J.W. Dant to fall so far that the brand has lost its associated goodwill, leaving nothing for other users to infringe.” This argument was rejected as lacking in in any legal basis, as the mark was not abandoned and did not have to be a thriving enterprise to be protected from infringement.

Second, the court determined that Log Still was using the J.W. Dant marks and indicia of good will as a source identifier, brushing aside Log Still’s “descriptive use” defense. Log Still was not referencing the J.W. Dant name and legacy in an academic non-trademark manner; rather, it was drawing on the J.W. Dant legacy to sell commercial products. Log Still also failed another test for good-faith, non-trademark use—the court decided that the story Log Still was selling was not true. In particular, Log Still’s attempts to trace its history to 1836 merely co-opted the Dant Distillery Company’s story, a legacy the Dant family sold long ago and that Heaven Hill purchased in 1993.

The court applied the familiar likelihood of confusion analysis following the Sixth Circuit’s Frisch’s test. Most difficult for Log Still’s defense was the evidence of actual confusion. Internet users commented in response to Log Still’s posts: “is that J W Dant I used to drink” and “What about JW Dant is that coming back?” A local news station broadcasted an interview with Wally (whom they introduced as “J.W.”) Dant while displaying a bottle of Heaven Hill’s J.W. Dant product and barrels labeled Dant Distillery. A distillery-focused blog reported on the opening of Log Still’s distillery with the headline “Log Still (formerly J.W. Dant).” The court also emphasized Log Still’s intent in selecting its competing branding. The court quoted from Log Still’s internal marketing documents which made “clear that Log Still aimed to steal J.W. Dant’s story—intentionally and in order to compete in the spirits marketplace.” As the court colorfully put it, the Marketing Plan was “legally damning” and “as close as many lawyers will ever come to a smoking gun”. Then the court added, “But wait, there’s more!” in recounting even further evidence of bad faith intent by Log Still to exploit another company’s goodwill.

Given its conclusion that Heaven Hill was likely to prevail, the court wasted no time in enjoining Log Still’s continued infringement. The court applied the Trademark Modernization Act of 2020’s presumption of irreparable harm and determined that Log Still had not adequately rebutted this presumption by attempting to rely on lack of provable economic damage to Heaven Hill, concluding that irreparable harm could be established by loss of control over brand image and good will. The court ordered Log Still to take several actions to distinguish itself from the J.W. Dant brand. The court ordered Log Still to remove references to J.W. Dant, his story, and the year 1836 from its products, labels, and logos. The court also enjoined Log Still from using jwdant.com domain in connection with the spirits industry and required Log Still to remove any internet marketing that states or implies “that Log Still is reviving, preserving, or contributing to the legacy of J.W. Dant’s distilling and the company he founded and his descendants sold.” The court stopped short of ordering Log Still to remove all references to the history of J.W. Dant and his connection to Log Still’s owners from its marketing and distillery tours, but Log Still is required to display a conspicuous disclaimer disavowing a connection to the J.W. Dant brand.

The court’s decision is a warning to distant descendants of the founders of famous brands about attempting to cash in on a family legacy that another entity owns. On the issue of whether an individual has an unqualified right to use his or her own name in marketing a product, the answer today is “no.” As the court pointed out, “A century ago,” Log Still’s principal J.W. (Wally) Dant “may have had a stronger case to sell bourbon by using his ancestor’s name or the initials they share. 19th century courts recognized a ‘sacred right’ to use one’s own name as a mark, even if someone else used the name first.” But this doctrine changed as courts eventually recognized “that names could confuse as easily as any other trademark.”

But there is a broader lesson for those without a whiskey baron in the family tree. The evidence against Log Still that the court found most compelling was Log Still’s internal marketing documents confirming Log Still’s desire to “creat[e] direct ties to” Heaven Hill’s mark “whether the brand can be used or not.” The strategy described in these documents is exactly what trademark and unfair competition law is designed to prevent—a new brand capitalizing on an old one by tying the two in the consumer’s mind. Upstart brand builders should be mindful that trademark law bars more than copying a name, it protects the goodwill built in a brand’s identity. Efforts to trade on the goodwill of another, even “subtly,” can land the junior user in hot water.

Firm Highlights

Insights

SEC Proposes Expansion of Investment Adviser Performance-Based Compensation Rule

On September 30, 2026, the Securities and Exchange Commission (the “SEC”) proposed amendments to Rule 205-3 under the Investment Advisers Act of 1940, as amended (the “Advisers Act”), which provides an exemption from the general prohibition under Section 205(a)(1) of the Advisers Act on registered investment advisers receiving performance-based compensation (the “Proposal”) so long as performance-based compensation is limited to “qualified clients”.1 Most notably for private fund sponsors, the Proposal would expand the definition of “qualified client” to include any investors that satisfy the “accredited investor” definition under Regulation D. The Proposal may also have implications for private fund managers that rely on exemptions from investment adviser registration under state law because certain state-level investment adviser registration exemptions incorporate or otherwise reference the federal qualified client definition. Expansion of the Qualified Client Definition Under the current Rule 205-3, an investor generally may qualify as a qualified client if, among other alternatives, the investor has at least $1.4 million under management with the adviser or has a net worth exceeding $2.7 million. These thresholds are higher than the financial thresholds applicable to many accredited investors under Regulation D. As a result, an investor may currently qualify as an accredited investor for purposes of investing in a private offering without qualifying as a qualified client for purposes of paying performance-based compensation. The Proposal would expand the qualified client definition to include any natural person or legal entity investor that satisfies the accredited investor definition under Regulation D. The Proposal would also remove the assets under management and net worth thresholds under the current Rule 205-3 qualified client test. For private funds relying on Section 3(c)(1) of the Investment Company Act of 1940, this change could reduce the need to apply a separate qualified client standard to investors that already qualify as accredited investors. Dorsey Observations and Next Steps If adopted as proposed, the expanded qualified client definition could be particularly significant for private fund managers. Most private fund offerings are already limited to accredited investors under Regulation D. However, the Proposal could expand the pool of prospective investors available to emerging private fund managers while reducing the regulatory burden associated with complying with Rule 205-3. The Proposal could also benefit advisers operating below the SEC registration threshold that rely on a state private fund adviser exemption. A number of states have adopted exemptions modeled on the North American Securities Administrators Association (“NASAA”) private fund adviser exemption, which may condition relief for advisers to certain funds relying on Section 3(c)(1) on each beneficial owner satisfying the federal qualified client definition. However, state requirements vary, and any effect of the Proposal would depend on the text of the applicable state exemption and how it incorporates Rule 205-3. Many emerging private fund managers may have a larger network of accredited investor relationships than qualified client relationships during the early stages of their investment advisory business. Currently, under Rule 205-3, private fund managers may receive performance-based compensation from investors who do not satisfy the qualified client definition if those investors were admitted to their private funds prior to registration with the SEC. Following registration with the SEC, however, managers may continue to permit investors that are not qualified clients to invest in future private funds but may not receive performance-based compensation from those investors with respect to such investments. In addition, because the net worth and assets under management thresholds for qualified client status are adjusted for inflation every five years, the pool of qualified client investors may diminish over time as previously eligible investors no longer satisfy the applicable thresholds. The Proposal could provide the dual benefit of greater flexibility for private fund managers to establish and maintain relationships with accredited investors as their businesses scale and they become registered with the SEC, and greater flexibility for certain accredited investors to participate in investment strategies that historically have been restricted to much larger institutional investors. Unless and until the Proposal is adopted, investment advisers should continue to comply with the existing qualified client requirements. If the Proposal is adopted, private fund sponsors should consider whether corresponding changes are appropriate for their subscription documents, investor questionnaires, and other offering materials. Advisers that are state-registered or rely on a state-level exemption should also consult the laws and regulations of each relevant jurisdiction before changing investor eligibility standards or performance-based compensation practices, because adoption of the federal amendments may not automatically modify state requirements. Comments on the Proposal will be due 60 days after publication in the Federal Register. 1 Investment Adviser Performance-Based Compensation Modernization, Investment Advisers Act Release No. IA-7022 (Sept. 30, 2026), available at https://www.sec.gov/rules-regulations/2026/09/s7-2026-28#33-11443proposed.

Insights

The Supreme Court Update - October 8, 2026

On September 29, 2026, the Supreme Court granted certiorari in one case: Department of Homeland Security v. D.V.D., No. 26-426: This case concerns the Trump Administration’s “third-country removal” procedures, where immigrants are deported to countries not listed in the removal orders. In granting certiorari, the Court granted the Government’s application to stay a lower court decision halting the practice, which will allow third-country removals to continue pending resolution of the case. The issues presented are: (1) Whether the district court had jurisdiction over respondents’ claims; (2) whether the district court had authority to enter class-wide declaratory relief and APA vacatur under 8 U.S.C. § 1252(f)(1); (3) whether the Government’s guidance on third-country removals is unlawful under 8 U.S.C. § 1231(b), the due process clause, or FARRA/CAT and its implementing regulations; and (4) such other questions that the Government determines are appropriate for the proper disposition of the case. On October 1, 2026, the Court granted certiorari in three additional cases: Rhoney v. Barbosa da Cunha, No. 26-104: Immigration officials detained Ricardo Aparecido Barbosa da Cunha—a Brazilian citizen who had lived in the United States for approximately twenty years after entering without inspection—and denied him a bond hearing under 8 U.S.C. § 1225(b)(2)(A). The Second Circuit held that his detention was instead governed by § 1226(a), which permits release on bond, because § 1225(b)(2)(A)’s mandatory-detention requirement applies only to noncitizens apprehended while entering the country or shortly thereafter. The question presented is: Whether 8 U.S.C. § 1225(b)(2)(A) mandates the detention pending removal proceedings of aliens who, like Barbosa da Cunha, are present in the United States without having been admitted. Missionaries of St. John the Baptist, Inc. v. Frederic, No. 25-113: A Catholic religious organization sought to build a shrine to the Virgin Mary on land the organization owned adjacent to its church in Park Hills, Kentucky. Local zoning restrictions prohibited the proposed construction. The question presented is: Whether a land-use regulation that prohibits a religious institution from building a religious structure on its own property constitutes a “substantial burden” on religious exercise under the Substantial Burden Provision of the Religious Land Use and Institutionalized Persons Act, 42 U.S.C. § 2000cc(a). Marschner v. Marschner, No. 25-1349: Under the Uniformed Services Former Spouses’ Protection Act (“USFSPA”), a veteran’s longevity-based retirement pay can be divided in a divorce, but retirement pay based on disability and retirement pay that was waived to receive disability pay are indivisible. The question presented is: Does the USFSPA require state courts to refuse enforcement of indemnification provisions in a divorce settlement agreement?

Insights

Energy Law: Month in Review - September 2026

Welcome to Dorsey’s Energy Law: Month in Review. We provide this update to our clients to identify significant developments in the previous month. Please reach out to any of the authors, listed above, to discuss these issues. Regulatory Developments Massachusetts Ratchets Up State and Local Regulation of AI Data Centers In early September, Governor Maura Healey of Massachusetts signed an executive order requiring that artificial intelligence data centers secure the approval of local communities as a precondition to proceeding with a given project. According to the terms of the order, data center developers will need to secure a “community benefits agreement” as a precondition to receiving permits from numerous state agencies, including the Department of Environmental Protection, the Energy Facilities Siting Board, and the Massachusetts Environmental Policy Act Office. Beyond requiring community benefits agreements, the order also mandates that developers mitigate utility costs to consumers, prohibits the use of nondisclosure agreements, and requires various state agencies to develop measures to limit data center impacts on the environment. North Carolina Regulators Decline Approval of Duke Energy Gas Turbine On September 18, 2026, North Carolina Utilities Commission (NCUC) denied Duke Energy’s application for a certificate of public convenience and necessity required to construct a gas-fueled combustion turbine at its Smith Energy Complex in North Carolina. The NCUC objected strongly to the $584 million price tag and noted that Duke appeared to be constructing the facility “based on anticipated data center customer additions.” The NCUC rejected that anticipated growth as “insufficiently reliable for the Commission to act at this point.” In rejecting Duke’s application, the NCUC also noted that Duke had signed the White House Ratepayer Protection Pledge, in which it represented that it would not shift data center costs to consumers. The NCUC observed that the record did not demonstrate how Duke “intends to adhere to its commitments under the Ratepayer Protection Pledge with regard to the Proposed Facility.” Notably, commission staff had actually supported the construction of the turbine, citing concerns about Duke’s reserve margins. The NCUC noted that it “understands the Public Staff’s expressed concerns,” but those concerns were outweighed by the NCUC’s reservations, including questions of demand. Department of Energy Approves Funds for Grid Improvement The U.S. Department of Energy (DOE) recently announced that it would fund 31 grid-improvement projects in 26 states. The funding initiative is part of the DOE’s “SPARK” initiative. The funding will include $1.9 billion in federal funding from DOE and $3.35 billion in recipient cost-sharing funding. The funds will go to projects designed to improve grid reliability and lower electricity costs. Recipients plan to reconductor over 1,500 miles of transmission lines and will deploy grid-enhancing technologies across approximately 21,000 miles. DOE stated that this initiative will make available over 23 additional gigawatts of electricity. Texas Moderates Rules Governing Data Center Interconnection The Texas Public Utility Commission adopted new regulations governing large-load interconnections. The rules impose a flat study fee of $100,000 for all proposed interconnections, which departs from the initial proposal to impose study fees using a tiered system based on project size. Additionally, the final rule eliminates the PUC’s previous proposal to impose a non-refundable interconnection fee of $50,000 per MW of contracted peak demand. The final rule also moderates the initially proposed regulations governing Electric Reliability Council of Texas (ERCOT) notifications for large-load customers’ non-utilized capacity. The proposed rules would have required notifying ERCOT within 30 days of missing a scheduled energization milestone by six months. The final rules, however, do not require informing ERCOT unless a scheduled energization milestone is missed by 24 months. FERC Denies TransAlta 202(c) Cost-Recovery Plan The Federal Energy Regulatory Commission (FERC) recently rejected TransAlta’s plan to recover $19.9 million in expenses stemming from a DOE order in which DOE prohibited TransAlta from retiring its coal-powered Centralia power plant. TransAlta had previously intended to retire the facility at the end of 2025. TransAlta’s cost recovery plan proposed spending an additional $23 million on repairs to continue operating the unit. FERC’s main objection had to do with geographic scope. TransAlta’s recovery plan called for recovering costs from California Independent System Operator (CAISO) and the Southwest Power Pool (SPP), but the DOE’s order requiring operation of the plant was designed to ensure reliability in the Northwest assessment area (Montana, Oregon, Washington, and parts of northern California and northern Idaho). Accordingly, FERC was unwilling to allow cost recovery from CAISO and SPP when the order that precipitated the additional costs only related to the Northwest assessment area. FERC informed TransAlta that it would only approve cost recovery from load-serving entities in the Northwest assessment area. FERC’s decision comes amid a rush of DOE emergency orders requiring the continued operation of coal-fired generating units. Litigation Appeals Court Upholds Washington Hydropower Plant With Caveats In a September 21, 2026, opinion, the Washington Court of Appeals largely upheld a Clean Water Act water quality certification by the Washington Department of Ecology for the Goldendale Energy Storage Project, a proposed pumped-water storage hydropower system adjacent to, but off-stream from, the Columbia River. A nonprofit (Columbia Riverkeeper) and the Confederated Tribes and Bands of the Yakama Nation appealed the certification, contending that it failed to impose necessary conditions and monitoring requirements to protect the water quality of the Columbia River. Most saliently, the plaintiffs argued that the project had the potential to leak 100 acre-feet of water per year into tributaries of the Columbia River. The Court of Appeals broadly rejected plaintiffs’ challenge to the state’s conclusion that “the project was designed not to leak.” That said, the Court of Appeals did reverse on one narrow issue. Specifically, the court determined that the state’s conclusion that “leakage from the project’s tunnels would be monitored and reported” was not supported by the evidence because the certification “does not explicitly require monitoring and reporting to determine whether there is any leakage.” Accordingly, the court remanded the matter to the state to impose monitoring and reporting requirements but otherwise affirmed the certification. Legislative Developments California Legislates Restrictions on Data Center Energy Use and Grid Costs On September 21, 2026, California Governor Gavin Newsom signed seven bills broadly regulating data centers in the state. SB 1168 directed the California Public Utilities Commission to assess the energy used by data centers. It also requires the PUC to pass costs of transmission and distribution upgrades and load increases on to data centers, rather than customers. SB 886 and SB 887 compel data centers to pay for infrastructure upgrade and generation costs, and wildfire mitigation costs, in addition to imposing environmental review. The statutes additionally increase local oversight of data centers. AB 1577 imposes a monthly reporting requirement that requires data centers to supply energy consumption and efficiency data to the California Energy Commission. AB 2383 contains incentives for data centers to use onsite clean energy generation. Finally, AB 2469 and AB 2619 require data center developments to assess water supply and develop a water scarcity plan. The statutes also mandate statewide water reporting as a precondition to obtaining and renewing business licenses.

Insights

EPA Limits Title V Re-Litigation of NSR Permits

Overview On September 25, 2026, the U.S. Environmental Protection Agency (“EPA”) published a final rule that significantly limits the ability of third parties to use the Clean Air Act (“CAA”) Title V permitting process to revisit New Source Review (“NSR”) permitting decisions years after those decisions were made. The rule establishes that NSR permitting determinations generally must be challenged during the original permitting proceeding, thereby providing regulated sources with greater permitting certainty and finality for major capital projects. Published in the Federal Register titled Clarifying the Scope of “Applicable Requirements” Under State Operating Permit Programs and the Federal Operating Permit Program (Docket ID No. EPA-HQ-OAR-2023-0401), the rule amends 40 C.F.R. Parts 70 and 71 to codify EPA’s interpretation regarding when requirements established under other CAA programs may be reviewed, modified, or implemented through the Title V operating permit program. The rule becomes effective 30 days after publication. The rule addresses two principal issues: (1) the relationship between NSR preconstruction permitting and Title V operating permits, and (2) the treatment of the General Duty Clause under CAA section 112(r)(1). Most significantly, the rule provides greater certainty for sources navigating the NSR permitting process. EPA’s amendments are intended to ensure that NSR permitting decisions made through an approved public process are generally not revisited later through Title V permit proceedings. The rule responds to a circuit split between the U.S. Courts of Appeals for the Fifth and Tenth Circuits. In Environmental Integrity Project v. EPA, 969 F.3d 529 (5th Cir. 2020), the Fifth Circuit upheld EPA’s interpretation, concluding that it was consistent with the text, structure, and purpose of Title V. In contrast, the Tenth Circuit reached the opposite conclusion in Sierra Club v. EPA, 964 F.3d 882 (10th Cir. 2020), finding that the then-existing regulatory definition of “applicable requirement” did not support EPA’s position. By amending the regulatory language on which the Tenth Circuit relied and codifying the interpretation approved by the Fifth Circuit, EPA has established a nationwide framework governing the interaction between NSR and Title V. NSR and Title V: EPA Establishes a Uniform Nationwide Framework At the core of the rule is EPA’s effort to define the respective roles of NSR and Title V. The rule codifies the approach EPA has applied since 2017: once a source obtains an NSR permit under an EPA-approved permitting program, and that permit was issued following public notice with an opportunity for comment and judicial review, the permit establishes the NSR-related “applicable requirements” of the State Implementation Plan (“SIP”) or Federal Implementation Plan (“FIP”) for Title V purposes. Under this framework, Title V is not a vehicle for re-examining underlying NSR permitting decisions. EPA does not intend to use the Title V process to revisit applicability determinations, emissions calculations, control technology determinations, permit conditions, or other issues resolved through the NSR permitting process. This principle applies regardless of the stage of the Title V proceeding; whether the NSR permit was issued pursuant to a SIP or FIP; the type of NSR issue involved; or whether the NSR permit is incorporated into Title V sequentially or concurrently. Limited Exceptions EPA recognizes several circumstances in which NSR issues may still be reviewed through the Title V program: No NSR permit was issued at all; The permit was issued without public notice and an opportunity for comment and judicial review; or The issue involves substantive overlap between Title V and NSR requirements, such as the adequacy of monitoring provisions. As a result, the rule does not insulate unpermitted projects or foreclose review of matters that independently arise under Title V. Key Regulatory Amendments The rule revises the definition of “applicable requirement” in 40 C.F.R. §§ 70.2 and 71.2. Paragraph (1): Where an NSR permit is issued with public notice and an opportunity for comment and judicial review, the permit establishes and defines the applicable SIP or FIP requirements for Title V purposes. Paragraph (2): All NSR permit terms, including terms contained in minor NSR permits, constitute applicable requirements that must be incorporated into Title V permits. Paragraph (4): CAA section 112(r)(1) (the General Duty Clause) is expressly excluded from the definition of “applicable requirement,” while section 112(r)(7) Risk Management Program requirements remain included. EPA also amended 40 C.F.R. §§ 70.8 and 70.12 to clarify that alleged defects in requirements established outside the Title V process generally do not provide a basis for EPA objection to a Title V permit or for a Title V citizen petition. General Duty Clause Exclusion The rule also codifies EPA’s longstanding position that the General Duty Clause in CAA section 112(r)(1) is not an “applicable requirement” for Title V purposes. EPA points to several considerations supporting that conclusion, including the distinction between the General Duty Clause and Title V permit terms, the provision’s origins in the Occupational Safety and Health Act’s general duty clause, and the different enforcement structures applicable to the General Duty Clause and Title V permit requirements. Importantly, excluding section 112(r)(1) from the definition of “applicable requirement” does not eliminate EPA’s authority to enforce the General Duty Clause independently of the Title V program. The final rule instead clarifies that the General Duty Clause need not—and should not—be incorporated into Title V permits as an applicable requirement. Practical Implications for Regulated Sources Greater Finality for NSR Permits  For projects requiring PSD, nonattainment NSR, or minor NSR permits, the permitting process becomes the primary forum for resolving disputes regarding applicability determinations, emissions calculations, control technology requirements, offsets, and permit conditions. Once an NSR permit is issued through a qualifying public process, regulated sources should face substantially reduced risk that those same issues will be challenged years later through Title V permit proceedings. Reduced Risk of Collateral Permit Challenges Stakeholders have sometimes sought to use Title V permit issuance, renewal, revision, or citizen-petition proceedings to challenge underlying NSR determinations. The final rule makes clear that Title V is not the appropriate vehicle for challenging whether an applicable requirement was correctly established in the first instance. This should reduce the risk of permit delays and uncertainty associated with collateral challenges to previously issued NSR permits. The rule does not, however, eliminate all Title V challenges relating to an NSR permit. Challenges concerning the Title V permit itself—including whether it appropriately incorporates applicable requirements or contains adequate compliance provisions—remain possible. Increased Importance of the Initial NSR Proceeding Because Title V generally will not provide a second opportunity to challenge the substantive validity of an NSR determination, the administrative record developed during the NSR process becomes increasingly important. Permit applicants should ensure that applicability analyses, emissions calculations, control technology evaluations, modeling demonstrations, and supporting technical documentation are thoroughly developed during the original permitting proceeding. For significant projects, applicants may therefore have an additional incentive to identify and resolve potential permitting issues before the NSR permit is issued rather than assuming that unresolved issues can be addressed during a subsequent Title V proceeding. Potential Incentive for Broader Public Participation EPA also notes that permitting authorities may choose to provide public notice and an opportunity for comment for a broader range of NSR permits because permits issued through a qualifying public process receive the benefit of the finality framework established by the rule. Some permitting authorities may conclude that greater public participation at the NSR stage is preferable to uncertainty during subsequent Title V proceedings. Conclusion The final rule is principally a permitting-certainty measure. For sources that obtain NSR permits through a public process, EPA has substantially limited the ability of third parties to revisit underlying NSR determinations through the Title V program. As a result, regulated entities should benefit from greater finality regarding key permitting decisions, reduced risk of collateral permit challenges, and increased certainty when planning and implementing capital projects.