.

Randy helps companies in regulated industries meet air quality and environmental requirements so they can keep projects moving and manage regulatory risk with confidence.

With more than a decade of experience representing energy, industrial, and agricultural clients across the Rocky Mountain region and the Midwest, Randy counsels clients on Clean Air Act (CAA) permitting, compliance, and enforcement matters. His air quality practice encompasses New Source Review permitting, Title V operating permits, compliance audits, enforcement defense, and regulatory advocacy. His experience includes representing clients in national and significant air quality enforcement matters with the U.S. Environmental Protection Agency (EPA), the U.S. Department of Justice, and state environmental agencies, as well as in rulemaking proceedings shaping methane and emissions standards for oil and gas operations.

Randy's practice spans the full range of environmental regulatory work, including matters under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), the Clean Water Act, and the Resource Conservation and Recovery Act (RCRA). He represents clients in environmental litigation, permitting, regulatory compliance, transactions, brownfields, and site remediation, and has represented clients in federal and state litigation, including CERCLA cost recovery and contribution actions and citizen suits under the Clean Water Act and RCRA.

Randy also advises manufacturing and industrial clients in the Midwest on air quality compliance and permitting, applying the same regulatory depth he has built representing energy clients in the West.

Select Experience

  • Represents data center in national air quality permitting and enforcement actions.*
  • Represents upstream oil and gas operators in significant national air quality enforcement actions brought by the U.S. EPA and U.S. Department of Justice.*
  • Represents oil and gas operators in major air quality rulemakings before the Colorado Air Quality Control Commission.*
  • Represents oil and gas operators in major oil and gas rulemakings before the Colorado Energy and Carbon Management Commission.*

* Experience occurred prior to joining Dorsey.

Education

  • Georgetown University Law Center (J.D., 2005)
  • University of Florida (B.A., 2002)

Bar Admissions

  • Colorado
  • Not admitted in Minnesota. Admitted in Colorado.

Accolades

  • Chambers USA, Environment, Colorado, 2026
  • Lawdragon, 500 Global Leaders in Energy, 2026
  • Lawdragon, 500 Leading Energy Lawyers, 2025

Select Speaking Engagements

  • “Controlling Methane from the Upstream Oil and Gas Sector: Lessons from the Colorado Experience,” Air & Waste Management Association’s International Specialty Conference Addressing Climate Change (September 10, 2015)
  • “Recent Developments in Federal and State Greenhouse Gas Regulation: Implications for Your Industry,” Rocky Mountain States Section, Air & Waste Management Association (September 2014)
  • “Game Changer: New Colorado Air Quality Regulations for the Oil and Gas Industry, Rocky Mountain Association of Environmental Professionals Meeting, (March 2014)
  • “Operating in a World of Nonattainment: National Ambient Air Quality Standards and Implications for Energy Development,” Rocky Mountain Mineral Law Foundation Special Institute: Air Quality Issues Affecting Oil, Gas, and Mining Development in the West, (February 2013)

Insights

Client Alert

The Methane Regulatory Pendulum Swings Again: EPA Proposes Sweeping Changes to Federal Standards for the Oil and Natural Gas Sector

November 2, 2026

Few environmental regulations better illustrate Washington’s regulatory “ping-pong” than EPA’s methane standards for the oil and natural gas sector. Over the last decade, successive administrations have repeatedly expanded, narrowed, rescinded, reinstated, and revised federal methane requirements, leaving industry to navigate a shifting compliance landscape with each change in administration. EPA’s October 27, 2026 proposal to reconsider significant portions of the 2024 oil and natural gas New Source Performance Standards (“NSPS”) and Emission Guidelines (“EG”) under Subparts OOOOb and OOOOc represents the latest swing of the regulatory pendulum. If finalized, the proposal would substantially reduce compliance obligations in several areas, particularly with respect to lower-producing wells, associated gas flaring, equipment and control-device standards, and the Super Emitter Program. EPA estimates that the proposal would result in approximately $45 billion in savings, while preserving what the agency considers appropriate methane emission controls. EPA’s proposal was published in the Federal Register on October 29, 2026. Comments must be received on or before December 16, 2026.  Significantly, EPA is not using this rulemaking to reconsider its general authority to regulate methane emissions from the oil and natural gas sector. Rather, the agency is addressing specific requirements adopted in the 2024 methane rule, while broader questions concerning greenhouse gas regulation are being addressed in separate proceedings. The present proposal therefore focuses on the appropriate design and scope of particular methane regulations, rather than resolving the threshold question of whether methane may be regulated under the Clean Air Act at all. I.    EPA Proposes to Eliminate the Super Emitter Program Among the proposal’s most consequential changes is the complete elimination of the Super Emitter Program. Adopted in 2024, the program created a regulatory framework under which EPA-certified third parties could identify large methane releases using approved remote-sensing technologies. Upon receiving a qualifying notification from EPA, owners and operators were required to investigate the reported emissions event, report findings to EPA, and take corrective action where necessary. EPA now proposes to repeal the Super Emitter Program in its entirety. The agency questions the program’s legal and policy foundations, including the role of third parties in identifying emissions events and triggering regulatory obligations. EPA also questions whether the program is necessary or effective given other requirements applicable to regulated sources and whether its expected emissions reductions justify its costs and implementation challenges. Because the program was incorporated into both the NSPS applicable to new, modified, and reconstructed sources and the EG applicable to existing sources, its removal would affect federal requirements as well as the presumptive requirements that States otherwise would be expected to address in Clean Air Act § 111(d) plans. Importantly, EPA’s proposed repeal does not prevent States from developing and implementing their own Super Emitter Program based on the existing requirements, which several states are already doing.  II.    EPA Reconsiders Associated Gas Requirements Another centerpiece of EPA’s proposal is its reconsideration of the 2024 rule’s restrictions on flaring associated gas from oil wells. The 2024 rule determined that the best system of emission reduction (“BSER”) generally required operators to capture and beneficially use associated gas by routing it to a sales line, using it onsite, or reinjecting it, rather than routinely flaring it. Although EPA provided certain transition periods and compliance flexibilities, particularly for wells facing infrastructure constraints, the rule ultimately established a framework strongly favoring capture and utilization over flaring. Since promulgation, EPA has received significant feedback regarding gathering-system limitations, gas quality issues, and other practical barriers operators face in securing outlets for associated gas. In response, EPA proposes to replace the existing capture-focused approach with a substantially more flexible standard. EPA argues that the 2024 rule relied too heavily on the availability of third-party gathering and processing infrastructure that is often beyond an operator’s control, raising questions regarding achievability and cost-effectiveness. Under the proposal, BSER would be based on routing associated gas to a flare or other control device capable of achieving at least a 95 percent reduction in methane and volatile organic compound (“VOC”) emissions. Operators could continue to capture gas for sale, use it onsite, or reinject it where feasible, but those practices would no longer be required. EPA also proposes that if a portion of associated gas is routed to sales or used for another purpose, the remaining portion must comply with the 95 percent standard. For example, if a company can route 40 percent of its associated gas to a sales line, the company would need to route the other 60 percent to a control device with a 95 percent reduction, or to a flare. EPA is also soliciting comment on less sweeping alternatives that would preserve the basic structure of the 2024 associated-gas program, while providing additional compliance flexibility. In particular, EPA requests comment on whether it should retain the current capture-and-sales framework but expand the circumstances under which temporary flaring is permitted or extend the duration of temporary flaring allowances where operators face infrastructure constraints. EPA appears to recognize that gathering-system availability, processing constraints, and other third-party factors can affect an operator's ability to route gas to sales, even where the operator ultimately intends to comply with the capture requirements. These requests for comment suggest that EPA is considering whether targeted revisions to the existing framework could address implementation concerns without fully abandoning the 2024 rule's underlying preference for gas capture and beneficial use. III.    EPA’s Reconsideration of the “No Identifiable Emissions” Standard EPA's proposal would substantially revise the 2024 rule’s “no identifiable emissions” (“NIE”) requirements applicable to certain covers and closed vent systems (“CVS”) associated with storage tanks. Under the existing rule, covered equipment generally must operate without identifiable emissions, creating a compliance framework that focuses heavily on the absence of observable emissions rather than solely on equipment design or overall control effectiveness. Since promulgation, industry has argued that the standard effectively functions as a zero-emissions requirement that may be difficult to satisfy under all operating conditions, even where equipment and vapor control systems are properly designed, maintained, and operated. Moreover, EPA stated in the preamble to the 2024 rule that any identified emissions would constitute a deviation of the emissions limitation, resulting in a framework under which the observation of emissions could itself establish noncompliance. EPA now proposes to separate the requirements into distinct design and operational components and to fundamentally alter how compliance with the operational NIE requirement is evaluated. EPA proposes to distinguish between deviations of the design requirements and deviations of the operational NIE requirements. Under the proposed approach, failure to repair an identified emission or defect within 24 hours would constitute a deviation of the design requirement, although not necessarily an underlying violation. Separately, operators could demonstrate compliance with the operational NIE requirement by making repairs as soon as practicable, with an initial repair attempt within five days and final repair within 30 days, or by qualifying for the existing delay-of-repair provisions. A deviation of the operational requirement would occur if the applicable repair deadlines are not met and the delay-of-repair provisions do not apply. The proposal also establishes a new framework for addressing recurring or “chronic” emissions events. After the third emissions event or defect from the same cover or CVS within a year, the owner or operator would be required to conduct an investigative analysis within 10 days to determine whether the underlying cause relates to equipment design, operation, maintenance, or prior repair efforts. The results of that investigation would have important compliance implications. If recurring emissions are attributable to a design flaw, EPA would treat the issue as a deviation of the design requirements. If the emissions result from inadequate prior repairs, the deviation would be attributed to the repair requirements. If operations, maintenance, or other site practices are responsible, the deviation would be classified under the operational requirements. EPA would also require implementation of corrective measures identified through the analysis, including design modifications within 90 days and operational or maintenance-related corrective actions within 30 days. Taken together, these revisions would shift the NIE standard away from a framework in which the mere presence of emissions may establish noncompliance and toward one that focuses on whether operators identify emissions, complete timely repairs, investigate recurring problems, and address the root causes of repeated emissions events. IV.    Solicitation of Comment on “Legally and Practicably Enforceable” Standard EPA is also soliciting comment on the definition of “legally and practicably enforceable” (“LPE”), which industry has identified as one of the more problematic existing requirements. Under the 2024 rule, EPA adopted an interpretation of LPE that many commenters argued effectively disqualifies numerous state regulatory programs, permits, and other federally enforceable mechanisms from serving as the basis for remaining below applicable Subpart OOOOb storage tank thresholds. In particular, stakeholders have asserted that the current LPE framework makes it difficult for state air permitting programs and other state regulatory requirements to satisfy EPA's criteria, thereby causing more storage tanks and other emission units to remain subject to Subpart OOOOb requirements than would otherwise be the case. EPA now requests comment on whether its current interpretation of LPE is overly restrictive and whether alternative approaches would better account for the manner in which state permitting and regulatory programs are administered and enforced. The request is significant because a broader interpretation of LPE could allow a wider range of federally enforceable state permits and regulatory requirements to satisfy exemption criteria under OOOOb, potentially reducing the number of storage tanks and other sources subject to direct NSPS regulation. As a result, the LPE issue has implications that extend beyond compliance mechanics and could materially affect the scope of sources regulated under the federal methane program. V.    Revised Requirements for Marginal Wells EPA is also proposing significant revisions to the treatment of lower-producing wells under Subparts OOOOb and OOOOc. The agency notes that marginal wells constitute a substantial portion of the nation’s producing well inventory but account for a relatively small share of overall production. At the same time, EPA discusses studies estimating that marginal wells contribute a disproportionate share of methane emissions from oil and natural gas production. The agency is evaluating whether the 2024 rule appropriately accounts for the operational characteristics, emissions profiles, and compliance costs associated with these wells. To address those concerns, EPA is proposing two alternative approaches to well-site subcategorization. Under the first option, EPA would distinguish between marginal and non-marginal well sites. EPA proposes to define a marginal well as a well that produced no more than 15 barrels of oil equivalent (“BOE”) per day over the prior 12-month period and a marginal well site as a site consisting exclusively of marginal wells with total site-wide production of no more than 15 BOE per day over the same period. EPA is also soliciting comment on whether marginal wells should be further subdivided based on production levels, including a potential distinction between sites producing 6 BOE per day or less and sites producing more than 6 BOE but no more than 15 BOE per day, which could result in additional regulatory flexibility for the lowest-producing wells. Under the second option, EPA would distinguish between conventional and unconventional well sites and tailor requirements based on that classification, including reduced requirements for conventional wells. The agency is seeking comment on which framework better reflects the operational and emissions characteristics of different well sites, as well as whether additional subcategories should be established within the marginal-well population and the extent to which compliance requirements should differ among categories. VI.    LDAR, Pneumatic Controllers, Control Device Monitoring, and Facility Modifications EPA's proposal also includes several targeted revisions to the 2024 rule's leak detection and repair (“LDAR”) requirements. Most notably, EPA proposes additional flexibility in the use of advanced monitoring technologies and seeks to move away from compliance frameworks that rely heavily on a single detection method. The agency is proposing changes intended to facilitate the use of multiple monitoring technologies, including optical gas imaging and other alternative detection approaches, and is seeking comment on whether technology-neutral compliance options can achieve equivalent emissions reductions at lower cost. EPA also proposes revisions for components and equipment that are particularly difficult to monitor using conventional LDAR methods, reflecting concerns that certain 2024 requirements may not be practical or cost-effective in the field. More broadly, EPA questions whether some of the monitoring frequencies adopted in 2024 appropriately balance compliance burdens and emissions-reduction benefits and seeks comment on additional opportunities to tailor LDAR obligations based on emissions risk and source characteristics. EPA also proposes technical revisions to requirements governing control devices and related equipment. These include changes addressing continuous pilot-flame requirements, flame-monitoring data deviations, control-device alerts, visible-emissions test conditions, temporary or backup control devices, temporary process controllers, and control-device categories. The agency’s stated objective is to provide additional compliance flexibility while maintaining appropriate emissions controls. The practical effect will depend on the final requirements and the equipment and circumstances to which each amendment applies. The proposal also addresses pneumatic controllers and equipment leaks at gas processing plants. For certain high-pressure process controllers at transmission compressor stations, EPA proposes a separate regulatory approach based on its reassessment of technical feasibility and cost. The proposal should not be read as establishing a general exemption for pneumatic controllers across the industry. EPA also proposes changes to other equipment-specific requirements, including requirements applicable to pumps, storage vessels, and equipment leaks at gas plants, in response to concerns raised following promulgation of the 2024 rule. Finally, EPA proposes changes to certain requirements governing liquids unloading and other well-site operations, as well as technical corrections and clarifications to the existing regulatory text. These provisions form part of EPA’s broader effort to address implementation concerns and reassess the costs and expected emissions reductions associated with selected requirements in the 2024 rule. Operators should evaluate the specific proposed amendments applicable to their facilities rather than assume that the proposal would provide across-the-board relief from existing monitoring, equipment, or control-device obligations. VII.    Implications for States and Future Congressional or Administrative Action EPA’s proposal would substantially revise several consequential elements of the 2024 methane rule, but it would not eliminate regulation of existing oil and natural gas sources under Clean Air Act § 111(d). As a result, states remain subject to the existing obligation to develop and submit plans for existing sources. If the proposed revisions are finalized, states currently developing those plans may need to reevaluate key program elements, including requirements relating to associated gas, well-site subcategories, the Super Emitter Program, and other compliance obligations. The proposal does not itself extend the January 22, 2027 deadline for state-plan submissions established under the existing framework. The Congressional Review Act (“CRA”) remains a potential source of uncertainty. Depending on when EPA submits a final rule to Congress and the applicable congressional-session timing, a future Congress and President could seek to disapprove the rule under the CRA. A successful disapproval would invalidate the rule and generally restrict the agency from issuing a rule in substantially the same form absent subsequent statutory authorization. The CRA’s lookback provisions can affect the period during which a rule remains subject to congressional review, so the risk cannot be assessed solely by reference to the calendar year in which the rule is finalized. The timing of finalization and submission to Congress, together with the applicable congressional calendar, will determine the extent of that exposure. Finally, unlike the CRA, which can nullify a recently promulgated rule through legislative action, a future administration seeking to unwind this rule would generally need to proceed through a new notice-and-comment rulemaking. EPA would need to revisit the underlying BSER determinations, cost analyses, technical feasibility findings, and enforceability conclusions that support the final rule. Because this proposal is grounded heavily in findings regarding achievability, legal and practical enforceability, and cost-effectiveness, a future administration would need to develop a sufficient record supporting different conclusions before reinstating more stringent requirements. Consequently, the final rule may prove more durable than prior pendulum swings, even if it remains politically controversial.

Client Alert

EPA Limits Title V Re-Litigation of NSR Permits

October 13, 2026

Overview On September 25, 2026, the U.S. Environmental Protection Agency (“EPA”) published a final rule that significantly limits the ability of third parties to use the Clean Air Act (“CAA”) Title V permitting process to revisit New Source Review (“NSR”) permitting decisions years after those decisions were made. The rule establishes that NSR permitting determinations generally must be challenged during the original permitting proceeding, thereby providing regulated sources with greater permitting certainty and finality for major capital projects. Published in the Federal Register titled Clarifying the Scope of “Applicable Requirements” Under State Operating Permit Programs and the Federal Operating Permit Program (Docket ID No. EPA-HQ-OAR-2023-0401), the rule amends 40 C.F.R. Parts 70 and 71 to codify EPA’s interpretation regarding when requirements established under other CAA programs may be reviewed, modified, or implemented through the Title V operating permit program. The rule becomes effective 30 days after publication. The rule addresses two principal issues: (1) the relationship between NSR preconstruction permitting and Title V operating permits, and (2) the treatment of the General Duty Clause under CAA section 112(r)(1). Most significantly, the rule provides greater certainty for sources navigating the NSR permitting process. EPA’s amendments are intended to ensure that NSR permitting decisions made through an approved public process are generally not revisited later through Title V permit proceedings. The rule responds to a circuit split between the U.S. Courts of Appeals for the Fifth and Tenth Circuits. In Environmental Integrity Project v. EPA, 969 F.3d 529 (5th Cir. 2020), the Fifth Circuit upheld EPA’s interpretation, concluding that it was consistent with the text, structure, and purpose of Title V. In contrast, the Tenth Circuit reached the opposite conclusion in Sierra Club v. EPA, 964 F.3d 882 (10th Cir. 2020), finding that the then-existing regulatory definition of “applicable requirement” did not support EPA’s position. By amending the regulatory language on which the Tenth Circuit relied and codifying the interpretation approved by the Fifth Circuit, EPA has established a nationwide framework governing the interaction between NSR and Title V. NSR and Title V: EPA Establishes a Uniform Nationwide Framework At the core of the rule is EPA’s effort to define the respective roles of NSR and Title V. The rule codifies the approach EPA has applied since 2017: once a source obtains an NSR permit under an EPA-approved permitting program, and that permit was issued following public notice with an opportunity for comment and judicial review, the permit establishes the NSR-related “applicable requirements” of the State Implementation Plan (“SIP”) or Federal Implementation Plan (“FIP”) for Title V purposes. Under this framework, Title V is not a vehicle for re-examining underlying NSR permitting decisions. EPA does not intend to use the Title V process to revisit applicability determinations, emissions calculations, control technology determinations, permit conditions, or other issues resolved through the NSR permitting process. This principle applies regardless of the stage of the Title V proceeding; whether the NSR permit was issued pursuant to a SIP or FIP; the type of NSR issue involved; or whether the NSR permit is incorporated into Title V sequentially or concurrently. Limited Exceptions EPA recognizes several circumstances in which NSR issues may still be reviewed through the Title V program: No NSR permit was issued at all; The permit was issued without public notice and an opportunity for comment and judicial review; or The issue involves substantive overlap between Title V and NSR requirements, such as the adequacy of monitoring provisions. As a result, the rule does not insulate unpermitted projects or foreclose review of matters that independently arise under Title V. Key Regulatory Amendments The rule revises the definition of “applicable requirement” in 40 C.F.R. §§ 70.2 and 71.2. Paragraph (1): Where an NSR permit is issued with public notice and an opportunity for comment and judicial review, the permit establishes and defines the applicable SIP or FIP requirements for Title V purposes. Paragraph (2): All NSR permit terms, including terms contained in minor NSR permits, constitute applicable requirements that must be incorporated into Title V permits. Paragraph (4): CAA section 112(r)(1) (the General Duty Clause) is expressly excluded from the definition of “applicable requirement,” while section 112(r)(7) Risk Management Program requirements remain included. EPA also amended 40 C.F.R. §§ 70.8 and 70.12 to clarify that alleged defects in requirements established outside the Title V process generally do not provide a basis for EPA objection to a Title V permit or for a Title V citizen petition. General Duty Clause Exclusion The rule also codifies EPA’s longstanding position that the General Duty Clause in CAA section 112(r)(1) is not an “applicable requirement” for Title V purposes. EPA points to several considerations supporting that conclusion, including the distinction between the General Duty Clause and Title V permit terms, the provision’s origins in the Occupational Safety and Health Act’s general duty clause, and the different enforcement structures applicable to the General Duty Clause and Title V permit requirements. Importantly, excluding section 112(r)(1) from the definition of “applicable requirement” does not eliminate EPA’s authority to enforce the General Duty Clause independently of the Title V program. The final rule instead clarifies that the General Duty Clause need not—and should not—be incorporated into Title V permits as an applicable requirement. Practical Implications for Regulated Sources Greater Finality for NSR Permits  For projects requiring PSD, nonattainment NSR, or minor NSR permits, the permitting process becomes the primary forum for resolving disputes regarding applicability determinations, emissions calculations, control technology requirements, offsets, and permit conditions. Once an NSR permit is issued through a qualifying public process, regulated sources should face substantially reduced risk that those same issues will be challenged years later through Title V permit proceedings. Reduced Risk of Collateral Permit Challenges Stakeholders have sometimes sought to use Title V permit issuance, renewal, revision, or citizen-petition proceedings to challenge underlying NSR determinations. The final rule makes clear that Title V is not the appropriate vehicle for challenging whether an applicable requirement was correctly established in the first instance. This should reduce the risk of permit delays and uncertainty associated with collateral challenges to previously issued NSR permits. The rule does not, however, eliminate all Title V challenges relating to an NSR permit. Challenges concerning the Title V permit itself—including whether it appropriately incorporates applicable requirements or contains adequate compliance provisions—remain possible. Increased Importance of the Initial NSR Proceeding Because Title V generally will not provide a second opportunity to challenge the substantive validity of an NSR determination, the administrative record developed during the NSR process becomes increasingly important. Permit applicants should ensure that applicability analyses, emissions calculations, control technology evaluations, modeling demonstrations, and supporting technical documentation are thoroughly developed during the original permitting proceeding. For significant projects, applicants may therefore have an additional incentive to identify and resolve potential permitting issues before the NSR permit is issued rather than assuming that unresolved issues can be addressed during a subsequent Title V proceeding. Potential Incentive for Broader Public Participation EPA also notes that permitting authorities may choose to provide public notice and an opportunity for comment for a broader range of NSR permits because permits issued through a qualifying public process receive the benefit of the finality framework established by the rule. Some permitting authorities may conclude that greater public participation at the NSR stage is preferable to uncertainty during subsequent Title V proceedings. Conclusion The final rule is principally a permitting-certainty measure. For sources that obtain NSR permits through a public process, EPA has substantially limited the ability of third parties to revisit underlying NSR determinations through the Title V program. As a result, regulated entities should benefit from greater finality regarding key permitting decisions, reduced risk of collateral permit challenges, and increased certainty when planning and implementing capital projects.

Select News & Press Mentions

  • “State Carbon Cost Disparities are Pivotal in Data Center Siting, Law360 (March 27, 2026)
  • “Keys to Federal Carbon Compliance in Data Center Siting,” Law360 (March 26, 2026)
  • “’Pulling Back the Curtain’ – EPA Proposing to Increase Transparency for Guidance Documents,” The Energy Law Advisor, Vol. 14, Number 3 (September 2, 2020)
  • “Troubled Waters Ahead: CWA Rule Sure to Rock the Boat, Law360, (April 2014)
  • “Clean Water Act Jurisdiction over Excavation Activities: The ‘Tulloch Rule’ Revised, The Colorado Lawyer, Vol. 38, No. 7, (July 2009)

Firm Highlights

Insights

Minnesota Consumer-Fraud Enforcement: Disclaimers Won’t Cure Deception, and Penalties Can Add Up

Misleading advertising claims can lead to costly consequences. In State of Minnesota ex rel. Ellison v. Wall & Associates, Inc., No. A25-2064, 2026 WL 3118291 (Minn. App. Oct. 19, 2026), the Minnesota Court of Appeals recently affirmed a bench trial verdict against a tax-relief company and two executives for violations of the Minnesota Consumer Fraud Act (“MCFA”) and the Minnesota Deceptive Trade Practices Act (“MDTPA”). The decision, which affirmed a substantial restitution and civil penalty judgment, underscores the broad power of the Minnesota Attorney General to act against deceptive sales practices. The decision also offers practical lessons for businesses seeking to reduce liability risks in consumer-facing communications. Background Wall & Associates (“W&A”), a Virginia-based tax-relief company, marketed assistance to taxpayers seeking relief from outstanding federal and state tax liabilities, often with offers in compromise—agreements to settle tax liabilities for less than the amount owed. In its extensive advertising campaigns, W&A represented that its average client received a 90% reduction in their tax debt, that it was a local company with Minnesota offices, that it provided legal services, and that it would “Solve ALL Tax Problems.” In reality, W&A’s promises bore little resemblance to what many clients received. Most of W&A’s clients saw just a 9.5% reduction in federal tax debt and 1.2% in state tax debt. W&A had no permanent Minnesota offices. And W&A provided neither legal representation nor assistance with filing tax returns—those services required referrals to separate firms for an additional fee. All the while, W&A clients paid upfront and recurring fees, including during periods when W&A did no work on their cases. Minnesota Attorney General Keith Ellison sued W&A, its founder and owner Ernest Kenneth Wall, and its president and CEO Patrick Mark Yates, alleging violations of, among other laws, the MCFA and the MDTPA. Following a 12-day bench trial, the district court determined that W&A violated the MCFA and MDTPA through its false and embellished advertising. The district court also held Wall and Yates individually liable for those violations because they directed, participated in, and acquiesced in the violations. The district court ordered injunctive relief, $2.7 million in restitution (with Wall and Yates jointly and severally liable for $1.3 million), and civil penalties of $786,517 against W&A, $415,500 against Wall, and $207,750 against Yates. The district court also awarded over $2.5 million in attorneys’ fees and costs to the state. W&A, Wall, and Yates appealed to the Minnesota Court of Appeals, which affirmed the district court’s decision on October 19, 2026. Although W&A, Wall, and Yates challenged the judgment on numerous grounds, several highlights of the decision provide important takeaways for consumer-facing businesses. Individual Reliance Is Not Required for Statutory Liability W&A argued that Attorney General Ellison had to prove a causal nexus between each violation of the MCFA and MDTPA and the injury to a particular consumer to establish liability. In W&A’s view, this required proof that each injured consumer had personally relied on W&A’s false representation. The Court of Appeals rejected this argument based on the MCFA’s and MDTPA’s plain language, which requires no proof of actual deception or confusion by consumers. The Court of Appeals finally pointed to the Minnesota Supreme Court’s decision in State v. Minnesota School of Business, Inc., which held that when a defendant’s misrepresentations are directed at and affected “a broad group of consumers, proof of direct individual reliance is not required to establish a causal nexus between MCFA violations and the harm suffered by consumers.” 935 N.W.2d 124, 135 (Minn. 2019). The Court of Appeals affirmed, however, that a causal nexus is necessary to support an award of damages under the MCFA and MDTPA. In making that determination, district courts look to various factors, including whether the misrepresentations were “longstanding, pervasive, and widespread in communications directed to consumers,” whether the seller intended and understood that consumers would rely on the misrepresentations, and whether the information was of a kind on which consumers would typically rely. The Court of Appeals’ decision continues Minnesota School of Business’s broad interpretation of liability under the MCFA and the MDTPA. Coordinated marketing campaigns to a “broad group of consumers” may expose businesses to MCFA and MDTPA liability without customer-by-customer proof of injury. That said, a causal nexus remains an element of an MCFA and MDTPA claim, and businesses involved in litigation should build a clear record at trial and on appeal showing how each of the relevant factors bears on the causal-nexus inquiry. Contractual Disclaimers Are Not an Automatic Defense to a Misleading Pitch W&A next argued that disclaimers in its client contracts prevented consumers from claiming they had been misled by its advertising. Reiterating that individual reliance is not required under the MCFA and MDTPA, the Court of Appeals held that a contractual disclaimer does not necessarily defeat a claim based on a conflicting oral representation. And on the facts of this case, the Court of Appeals agreed with the district court that W&A’s contractual disclaimers were insufficient given the extensive misrepresentations by W&A and the unequal bargaining power between it and its customers. This holding confirms that contractual disclaimers are not a cure-all for misleading advertising or sales practices. Businesses should review the entire customer journey, including pre-contract representations, as those representations may survive a contractual disclaimer to the contrary. And if faced with litigation, businesses should build a strong record, both at trial and on appeal, showing why any disclaimer is effective in context. The State Has Broad Authority to Seek Restitution W&A also challenged Attorney General Ellison’s authority to seek restitution under the state’s parens patriae authority to protect residents’ collective interests, arguing that injury to only 228 Minnesotans did not affect a sufficiently substantial segment of the population. The Court of Appeals rejected a simple headcount approach, instead explaining that the state had a legitimate interest in protecting residents’ economic well-being as a whole. In any event, the Court of Appeals held that if restitution was not appropriate under the state’s parens patriae authority, then it would still be appropriate under the Attorney General’s enforcement powers under Minn. Stat. § 8.31. The decision reinforces that the broader and more sustained the deceptive advertising, the stronger the case for restitution to protect Minnesotans’ economic interests. Civil Penalties Accrue Per Violation, Not Per Defendant The Court of Appeals finally rejected W&A’s claim that the Attorney General’s enforcement powers under Minn. Stat. § 8.31 permit only civil penalties of up to $25,000 for each defendant. Rather, the Court of Appeals explained that penalties are limited to $25,000 per violation. Multiple violations can therefore produce substantially greater penalties. The Court of Appeals also rejected the argument that restitution made penalties unnecessary: repaying consumers does not eliminate the need to address gains from deceptive conduct and deter future violations. Final Takeaways Align every consumer-facing communication. Broad and extensive marketing campaigns can expose businesses to stronger enforcement standards under the MCFA and MDTPA, making it critical that consumer communications remain accurate and consistent from the first advertisement through the final sale. Plan for layered enforcement exposure. Penalties under the MCFA and MDTPA can add up quickly: W&A, Wall, and Yates ultimately faced more than $6 million in civil penalties, restitution, and attorneys’ fees. The decision continues a line of Minnesota cases recognizing the Attorney General’s broad consumer-protection authority. Details matter. Although the Attorney General’s enforcement power is broad, it is not boundless. As the Court of Appeals explained, issues of causation, the effectiveness of contractual disclaimers, and the availability of restitution and civil penalties all turn on the specific facts of the case. Effective advocacy at trial and on appeal is critical to developing the facts relevant to liability and damages.